HomeMy WebLinkAboutPILING REPORT 9-10-21August 28, 2021 RE: Pile Inspection and Log for: 372 Nettles Blvd Jensen Beach Fl Install date: August 25, 2021 For your information, during the pile installation at the above referenced property, each pile was documented for proper type and size of steel placement, correct grout mix, the number of strokes indicating volume and any abnormalities that may have occurred during installation. Each pile was checked by “counting the strokes method” as documented in several literature including “Inspector Guide to the Auger Cast-in -Place Piles” published by the Auger Cast-In-Place Pile Committee of the” The Deep Pile Institute”. The approved drawings specified a 14” diameter auger cast pile drilled 30’ in length. The site was as it was during the soil investigation. Each pile was reinforced with the specified steel cage and /or #7 center bar with 25’ of embedment. The concrete pump used, a Transcrete BV75 was calibrated on site and determined to produce .65 cuft / stroke. A digital stroke counter was provided on the pump. The drilling equipment was fitted with gauges that were used to monitor and record the installation procedure. These were monitored and/or reviewed to insure a positive head and adequate volume was maintained throughout the grouting of each pile. Attached is a detailed record of the pile volumes pumped into each pile. The lowest yield for any pile was 120% which is consistent with the recommendations and meets the job requirements as set forth in the structural drawings. Based on this information, it is my professional opinion, the piles constructed for the referenced project were installed in accordance with industry standards and as specified according to the construction drawings to the best of my knowledge. The pile documentation and location plan are attached. Please feel free to contact me if you have any questions. Thank you, Michael A. Kalajian, P.E. PE. No. 60133 mike@mkstructural.com 587 W. Eau Gallie Blvd. Suite 201 Melbourne FL 32935 ph. 321-600-0672 email: mike@mkstructural.com P14 P10 P7 P3 P8 P5 P4 P2 P12 13 P11 P9 P6 14” diameter piles installed 30’ from grade. Theoretical Volume: 32.1 Cuft Theoretical strokes (.7 cu ft/stroke) 46 P1 Piles 1, 2 and 3 were installed with steel cages consistent with the approved plans. The remaining piles were reinforced with a single #7 bar. P15 Pile Strokes grout factor 1 58 1.26 2 56 1.23 3 55 1.2 4 56 1.23 5 58 1.26 6 56 1.23 7 55 1.2 8 58 1.26 9 58 1.26 10 55 1.2 11 56 1.23 12 62 1.35 13 58 1.28 14 58 1.28 15 55 1.2 Pile sequence and installation notes