Loading...
HomeMy WebLinkAboutTernite Treatment IUN/27/2017/TUE 02:27 PM FAX No, P. 001 r✓y St Lucie County Inspections 1 co . 2300'Virginia Avenue Ft Pierce, FL 34982 ' (722) 462-2172 CERTIFICATE OF TERMITE.TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT# 1704-0304 JOB ADDRESS 3520 Seminole Rd.Fort Pierce,FL 34951-4041 BUILDER M&L Custom Builders i PEST CONTROL CONTRACTOR HomeTeam Pest Defense Inc. PEST CONTROL LICENSE# JF0001886 _ We,the undersigned, hereby certify that we have pretreated the above-described consJtruction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 220 Chemicals used: Bora-Care Percentage of solution: .50% Total gallons used.: 2 g - -- - g � 1 Date of treatment: 09/19/17 Time of treatment: AM I *Footing li'BC104.2.6 Certificate of Protective Treatmentfor prevention of termites. ® 1 st Treatment A weather resistant jobsite posting board shall be provided to receive . duplicate Treatment Certificates as each re uired rotective treatment is P9 P ❑Re-treat providing a o or e person 0 ❑ Slab completed,pr v drag c py f the p rs n the p ermrt is ttsued to and another copy for the buildingpermit files. The Treatment Cerf Bate shall ❑ 1 st Treatment provide the product used, identity of the applicator, time and date of the ❑Re-treat treatment,site location, area treated,)chemical used,]percent concentration and number ofgallons used, to establish a verifiable'record ofprotective ❑Driveway treatnrenr If the soil chemical barrier method for termite prevention is used, ❑ 1 st Treatment final exterior treatment shall be completed prior to fii l building approval. ❑Re-treat St Lucie County requires for the BI al inspection for CO,a permanent ❑Pools Sticker to be placed on the electrical panel bore coffer,listing all the ❑ 1st Treatment treatments and dates of applications. 1 ❑Re-treat D Other ❑ 1st Treatment El Re-treat Signature of exterminator ❑Perimeter for Final Inspection NOTE.There must be a completed form for each required treatment or re-treatment and'this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a. re-inspection fee charged RECEIVED JUN 2 7 2017