HomeMy WebLinkAboutTernite Treatment IUN/27/2017/TUE 02:27 PM FAX No, P. 001
r✓y St Lucie County Inspections 1
co . 2300'Virginia Avenue
Ft Pierce, FL 34982
' (722) 462-2172
CERTIFICATE OF TERMITE.TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT# 1704-0304 JOB ADDRESS 3520 Seminole Rd.Fort Pierce,FL 34951-4041
BUILDER M&L Custom Builders
i
PEST CONTROL CONTRACTOR HomeTeam Pest Defense Inc.
PEST CONTROL LICENSE# JF0001886 _
We,the undersigned, hereby certify that we have pretreated the above-described consJtruction for subterranean
termites in accordance with the standards of the National Pest Control Association.
Square feet of area treated: 220 Chemicals used: Bora-Care
Percentage of solution: .50% Total gallons used.: 2
g - -- - g �
1
Date of treatment: 09/19/17 Time of treatment: AM
I
*Footing li'BC104.2.6 Certificate of Protective Treatmentfor prevention of termites.
® 1 st Treatment A weather resistant jobsite posting board shall be provided to receive
. duplicate Treatment Certificates as each re uired rotective treatment is
P9 P
❑Re-treat providing a o or e person 0
❑ Slab completed,pr v drag c py f the p rs n the p ermrt is ttsued to and
another copy for the buildingpermit files. The Treatment Cerf Bate shall
❑ 1 st Treatment provide the product used, identity of the applicator, time and date of the
❑Re-treat treatment,site location, area treated,)chemical used,]percent concentration
and number ofgallons used, to establish a verifiable'record ofprotective
❑Driveway treatnrenr If the soil chemical barrier method for termite prevention is used,
❑ 1 st Treatment final exterior treatment shall be completed prior to fii l building approval.
❑Re-treat St Lucie County requires for the BI al inspection for CO,a permanent
❑Pools Sticker to be placed on the electrical panel bore coffer,listing all the
❑ 1st Treatment treatments and dates of applications. 1
❑Re-treat
D Other
❑ 1st Treatment
El Re-treat Signature of exterminator
❑Perimeter for Final Inspection
NOTE.There must be a completed form for each required treatment or re-treatment and'this form must be on the
job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a.
re-inspection fee charged
RECEIVED
JUN 2 7 2017