HomeMy WebLinkAboutCompaction Test Ter rn'l -7 v Y, 0 3�vN/ - -
UNIV9RSA
DES Project No.. June 1 ,2017.0000
Date Typed June 12,2017
ENGINEERING SCIENCES
Consultants In:Geotechnical Engineering•Environmental Sciences
Geophysical Services•Materials Testing•Threshold Inspection
1 9 Building Code Administration,Compliance Inspection&Plan Review
820 Brevard Avenue,Rockledge,FL 32955 -P:321.638.0808 -F:321.638.0978
Construction Materials Testing Seirvices
FIELD AND LABORATORY REPORT COVER PAGE
Client: M &L Custom Builders
237 Bermuda Beach Dr
Ft Pierce, FL 34949
Project: 3520 Seminole Drive, Ft. Pierce, FL
3520 Seminole Drive,Ft. Pierce, Brevard County, FL
As requested, Universal Engineering Sciences, Inc. (UES) representative(s) performed construction materials testing and/or
field inspection services on the above project. Testing results and/or inspection observations are reported on the attached
sheets. The contents of this package are summarized below:
Scope of Work
Work Order No. Date Type of Report
62855-1 1 06/06/2017 In-Place Density Test Report w/Activity Record
We hope this information is sufficient for your immediate needs. If you have any questions, please do not hesitate to contact
the undersigned.
IDA
Sincerely;.
Unlvbrsai F:z_,tnganng-3 fence's, Inc.::,
CertifibaitF�f Z'66rizatio Ito` r 549
1 r `
i
��:
Richard E. Hoaglin, P.E.
FLORIDA
Professional Engineer No.48796
JUN 2 6 z0�
I
i
NIV
��� � UES Project No: 0310.1700271.0000
UES DOCS No:
UES Report No: 62855-1 ARC 060617
ENGINEERING SCIENCES On-Site Time(hirs). 0.50
Consultants In:Geotechnical Engineering a Environmental Sciences Lab Time(hrs). 0.00
Geophysical Services-Materials Testing-Threshold Inspection Travel Time(hers): 1.00
Building Code Administration,Compliance Inspection&Plan Review Total Time(hrs): 1.50
820 Brevard Avenue,Rockledge,FL 32956 -P: 321.638.0808 -F:321.638.0978
i
Activity Record
Client: M & L Custom Builders
237 Bermuda Beach Dr
Ft Pierce, FL 34949
Project: 3520 Seminole Drive, Ft. Pierce, FL
3520 Seminole Drive,Ft. Pierce, Brevard County, FL
Date of Activity: Tuesday, June 06, 2017
Technician: Russell Brause
As're uested a Universal Engineering Sciences Technician was resent at the above referenced project
q 9 9 P P J t
site for the purpose of earthwork testing for the Building pad.
While on site, the technician observed the general condition of the areas to be tested and performed 4
density test(s) for Building pad.. All test(s) were performed in accordance with the ASTM D-6938 Nuclear
Gauge Method and were found to meet the project compaction requirements of 95% of the maximum dry
density per ASTM D-1557.
The Contractor was notified of the test results or a copy was left for their records.
9
tl
I�
9
i
i
i
UNIVERSAL UES Project No: 0310.1700271.0000
UES DOGS No:
ENGINEERING SCIENCES UES Report No: 62855-1 DT060617
Consultants In:Geotechnical Engineering•Environmental Sciences
Geophysical Services•Materials Testing•Threshold Inspection
Building Code Administration,Compliance Inspection&Plan Review
820 Brevard Avenue,Rockledge,FL 32955 -P:321.638.0808 -F:321.638.0978
In-Place Density Test Report
Client: M & L Custom Builders
.237 Bermuda Beach Dr
Ft Pierce, FL 34949
Project: 3520 Seminole Drive, Ft. Pierce, FL
3520 Seminole Drive,Ft. Pierce, Brevard County, FL
Area Tested: Building pad.
Type of Test: Field: ASTM D-6938 Nuclear Gauge Method Date of Test: 06/06/2017
Lab: ASTM D1557 Modified Proctor
Technician: Russell Brause
Requirements: 95%of Proctor maximum dry density. These tests apply to the fill and/or surficial soil conditions
only and do not address the condition of the underlying soils below the tested depths.
Field Dry Field
Test Depth Proctor Density Moisture % Comments
No. Location of Test Range (inch) (2) (PCF) % Compaction (3)
1 NE corner. 0 to-1 ft 12.00 20863 116'17-- --9.2 99 A
2 NW corner. 0 to-1 ft 12.00 20863 115.6 7.7 98 A
3 SW corner. 0 to-1 ft 12.00 20863 115.1 7.1 98 A
4 SE corner. 0 to-1 ft 12.00 20863 11419 6.4 97 A
(1) Ref. Datum: 0 = Top of Final Grade (3) Co ments Key
(2) Maximum Optimum A. Compaction meets min. requirements
Proctor Dry Moisture B. Compaction does kot meet min. requirements
#1 Density Content C. Moisture does notI meet requirements
20863 118.0 10.0
D. Recompaction required
i
E. Recompacted, Re4ested, Meets Requirements
I
This test was performed without deviation from ASTM procedures.
This report shall not be reproduced,except in full,without the written approval of Universal Engineering Sciences.
'
UNIVERSAL Client No: 0310.1700271.0000
ENGINEERING SCIENCES
Consultants In:Geotechnical Engineering- Date: June 12, 2017
i
Environmental Sciences-Construction Materials Testing
820 Brevard Avenue-Rockledge,Florida 32955-(321)638-0808
REPORT OF MOISTURE DENSITY RELATION19HIP OF SOIL
Client: M&L CUSTOM BUILDERS
237 BERMUDA BEACH DRIVE
FORT PIERCE FLORIDA 34949
Project: 3520 SEMINOLE DRIVE
FORT PIERCE, FLORIDA
Location: FILL-PAD
Date Sampled: 6/6117 Sampled By R USSELL BRAUSE
120 SulV MARY OF TEST RESULTS
118 _ — TEST M99 ETHOD ASTM D-1557
116 MAX'MUM 118.0 pcf
DRY DENSITY
114 OPTIMUM 10.0
MOISTURE CONTENT
112 U.S C.S.
ASTM ID2487 SP-SM
a
ti 110 SOIL DESCRIPTION
o I
LIGHT TAN SAND
U 108 ——
' iu
a '
106
0 FILL: NATURAL GROUND:
104
PASSING#200 SIEVE %
z 102 —
0 � C RVES OF 100%SATURATION
100 FOR SPECIFIC GRAVITY EQUAL TO:
98
96 I 2.75
2.70
94 —
I 2.65
92 — — —
90 PROCTOR NO: 7180
0 5 10 15 20 25 30
� MOISTURE CONTENT(Percent Dry Weight)
LAB NO: 20863
I
i
NOTESThis report shall not be reproduced,except in full,without the written approval of Universal Engineering)Sciences,
I
i