HomeMy WebLinkAboutHealth Department Septic Approval APPLICATION #:AP1290762
STATE OF FLORIDA I 4_ Q37� PER�IMIT #.56-SF-1763161
DEPARTMENT OF HEALTH DOCUMENT #:F11122291
ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM 05/15/2017
CONSTRUCTION INSPECTION AND FINAL APPROVAL DATE PAID:
ws" FEE PAID:200.00
RECEIPT #:56-PID-3239010
1
APPLICANT: Robert Humphrey
AGENT: Ashton Septic Tanks Inc.
PROPERTY ADDRESS: 358 Notlem St Fort Pierce, FL 34982
LOT: 6 BLOCK: 8
SUBDIVISION: Palm Gardens ID#: 3403-802-0100-000-9
CHECKED [X] ITEMS ARE NOT IN COMPLIANCE WITH STATUTE OR RULE AND MUST -'BE CORRECTED.
TANK INSTALLATION SETBACKS
[ ] [01] TANK SIZE [i] 1090.00 121 483.00 [ ] [27] SURFACE WATER 54 FT
[ ] [,021 TANK MATERIAL Polyethylene [ ] [281 DITCHES FT
[ ] [031 OUTLET DEVICE [ ] [29] PRIVATE WELLS 64 FT
[ ] [041 MULTI—C.HAMBERED [ Y LNJ [ ] [301 PUBLIC WELLS FT
[ ] [051 OUTLET FILTER Polylok PL-68 [ ] [311 IRRIGATION WELLS FT
[ ] [061 LEGEND 1. 70-143-11DC3 2. 70-143-54SC4 [ ] [321 POTABLE WATER 64 FT
[ ] [071 WATERTIGHT [ ] [33] BUILDING FOUNDATIONS 7 FT
[ ] [08] LEVEL [ ] [341 PROPERTY LINES 9 FT
[ ] [091 DEPTH- TO LID [ ] [351 OTHER FT
DRAINFIELD INSTALLATION FILLED:/ MOUND SYSTEM
[ ] 1101 AREA [1] 509.4 [21 SQFT [ ] [361 DRAINFIELD COVER
[ ] Eli] DISTRIBUTION BOX HEADER X [ l [37] SHOULDERS
[ ] [121 NUMBER OF DRAINLINES 1. 5.00 2. [ ] [381 SLOPES j
[ ] [131 DRAINLINE SEPARATION [ ] [391 STABILIZATION 07/05/2017
[ ] [141 DRAINLINE SLOPE
[. ] [151 DEPTH OF COVER ADDITIONAL INFORMATION
[ ] [161 EI:EVATION [ ABOVE / BELOW ]BM 6.00 [ ] [40] UNOBSTRUCTED AREA
( ] [171 SYSTEM LOCATION [ ] (411 STORMWATER RUNOFF
[ . ] [181 DOSING PUMPS 1.00 [ ] [421 ALARMS f9
[ ] [191 AGGREGATE SIZE [ ] [431 MAINTENANCEIAGREEMENT
I ] [201 AGGREGATE EXCESSIVE FINES [ ] [44] BUILDING AREA
[ ] [211 AGGREGATE DEPTH [ ] (451 LOCATION CONFORMS WITH SITE PLAN
FILL / EXCAVATION MATERIAL [ l [46] FINAL SITE GRADING
[ ] [22] FILL AMOUNT [ ] [471 CONTRACTOR j MICHAEL W STUHR(ASHTO
[ ] [23] FILL TEXTURE [ ] [481 OTHER INFILTRATOR Quick4 Plus,EQ36 LP
[ ] [241 EXCAVATION DEPTH ABANDONMENT
[ ] [251 AREA REPLACED [ ] [491 TANK PUMPED 05/23/2017
[ ] [261 REPLACEMENT MATERIAL [ ] [501 TANK CRUSHED & FILLED 05/23/2017
Comments: Comments are on page 2.
i
Lucie CHD DATE: 05/23/2017
CONSTRUCTION [ APPROVED / DISAPPROVED ]
Env ronmental Specialist 11 Brian J I ram(ENVIRONMENTAL HEALTH)
FINAL SYSTEM [ APPROVED / Lucie 1 CHD DATE: 07/05/2017
DISAPPROVED ]:
Environmental Specialist II Brian Pgram(ENVIRONMENTAL HEALTH)
(Explanation of Violations on following page)
DH 40161. 08/09 (Obsoletes all previous editions which may not be used)
Incorporated: 64E-6.003, FAC Page 2 0£ 3
EH Database v 1.0.1 AP1290762 EID1763161 l
i
o
0� I
APPLICA ION #:AN 290762
STATE OF FLORIDA PERMIT #:56-SF-1 763161
DEPARTMENT OF HEALTH
DOCUMENT #:F11-122291
ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM
05/15/201 7CON CONSTRUCTION INSPECTION AND APPROVAL DATE
�
FEE PAID•200.00
i
RECEIPT #:56-PID-32390.10
Violation Number Comment
I,
Comments
The system is sized for 3 bedrooms with a maximum occupancy of 6 persons(2 per bedroom),for a total estimated flow of 300
gpd. New ST DT and DF.Liberty 1/3hp pump.5x9 long.
No violations,system ok to cover.Contractor notified onsite. Needs final inspection for mound'system and alarm check.
Final system approved.Contractor emailed final approval.
DH 4D16 08/09 Obsoletes all( previous editions which may not be used) {
Incorporated: 64E-6.003, FAC c 4 Page 2 of 3
EH Database v 1.0.1 AP1290762 EI 1763161
I,, J
II
I I
I;
I
i r
I
I
' 1
j
I �
I'
1
I
I,
a
I
Duality You Can Trust...From
North America's Largest Roofing Manufactured
iCalidad En La Due Usled Panda Conflar..Del
Fabricante De Techos Mas Grande De Norleamdrical'
Doe Dualild A Laquelle Vous Pouver Vous Fier...
Do Plus Gros Fabricant De Toilures En Amdrique Du Nordl'
INSTALLATION INSTRUCTIONS • INSTRUCCIONES DE INSTALACION • INSTRUCTIONS WINSTALLATION
oT® �tv�E.�.,ot� a.
eo,ewe�gnu sauo.
........... ...................��...�...........t.,....e... ,s mut ntt..t of nu.t
GENERAL INSTRUCTIONS
•SAFETY DATA SHEETS: When using GAF products, e.g., shingles, underlayments, plastic cement,etc., please refer to the applicable SDS.
The most current versions are available at gaf.com. GAF does not provide safety data sheets or installation instructions for
products not manufactured by GAF. Please consult the material manufacturer for their SIDS and installation instructions where appropriate.
•ROOF DECKS: Use minimum 3/8'(10mm) plywood or OSB decking asrecommended by APA The Engineered;.Wood_Assn.fWo'od decks must
/b`e`well=seasoned-arfd`supp'orted having a maximum 1/8" (3mm) spacing, using minimum noml 1 .2`5mm)ina #thick lumber,'a maximum 6"
4(152mm) width, having adequate nail-holding capacity and a smooth surface.rpo-NOT fasten shingles direct ytCinsulation or-insulated-deck
unless-authorized-in-writing-by-GAF.-Roof-decks-and-existing-surfacing-material must be dry prior to application of shingles.
•UNDERLAYMENT(LEAK BARRIER): Install GAF leak barrier at the eaves in localities where leaks may be caused by water backing up behind_
ice or debris dams.
•UNDERLAYMENT (ROOF DECK PROTECTION): Underlayment beneath shingles has many benefits, including helping to prevent wind-driven
rain from reaching the interior of the building and to prevent sap in some wood decking from reacting with asphalt shingles.When an
underlayment is installed, use a breather-type underlayment, such as GAF Shingle-Mate°or Deck-Armor'"underlayments. GAF Tiger Pawd'
underlayment, with its moisture control design, can also be used.Always have a design professional review ventilation requirements when
using a moisture control design underlayment. Underlayment is also required by many code bodies and is required to maintain the shingles'
UL Class A fire rating. When using FeltBusterTm High-Traction Synthetic Roofing Felt as underlayment, it MUST be installed over one layer of
VersaShield®Fire-Resistant Roof Deck Protection in order to maintain a Class A fire rating for GAF asphalt shingles.
P FASTENERS: Use only zinc-coated steel or aluminum, 10-12 gauge, barbed, deformed,or smooth shank roofing nails with heads 3/8"(10mm)
to 7/16"(12mm)in diameter. Fasteners should be long enough to penetrate at least 3/4"(19mm) into wood decks or just through the plywoodd
decks. Fasteners must be driven flush with the surface of the shingle. Overdriving will damage the shingle. Raised fasteners will interfere with
the sealing of the shingles and can back out.
•ASPHALT PLASTIC CEMENT: Use asphalt plastic cement conforming to ASTM D4586 Type I or II.
•WIND RESISTANCE/HAND SEALING:These shingles have a special thermal sealant that firmly bonds the shingles together after application
when exposed to sun and warm temperatures. Shingles installed in fall or winter may not seal until the following spring. If shingles are damaged
by winds before sealing or are not exposed to adequate surface temperatures, or if the self-sealant gets dirty,the shingles may never.seal.
Failure to seal under these circumstances results from the nature of self-sealing shingles, and is not a manufacturing defect. If shingles are
to be applied during PROLONGED COLD periods or in areas where airborne dust or sand can be expected before sealing occurs,the shingles
MUST be hand sealed.See Nailing Instructions/Hand Sealing.
•MANSARD AND STEEP SLOPE APPLICATIONS: For roof slopes greater than 21"per foot(1.750mm/m),shingle must be hand sealed. DO NOT
use on vertical side walls.
•RELEASE FILM: Plastic film strips are present either on the back or face of each shingle.The film strips are to-prevent shingles from sticking
together while in the bundle. Do not remove the film strip before or during the application.
THROUGH VENTILATION: For optimal shingle life and to help prevent mold growth,all roof structures must have through ventilation to prevent
entrapment of moisture-laden air behind roof sheathing.Ventilation must be designed to meet or exceed current F.H.A., H.U.D., or local code
minimum requirements. Note: Minimum net free ventilation area of 1 sq.foot per 150 sq.feet(1 sq. meter per 150 sq. meters) of ceiling area
is required.When vents are located at the eaves and near the roof's peak(balanced)for maximum air flow,ventilation may be reduced to 1 sq.
foot per 300 sq.feet(1 sq. meter per 300 sq. meters).
EXPOSED METAL: Paint all exposed metal surfaces flashing, vents, etc.) with matching GAF Shingle-Match" roof accessory paint for
best appearance.
• NOTE:All drawings not drawn to scale.
INSTRUCCIONES GENERALES
•HOJAS DE DATOS DE SEGURIDAD(SDS):Cuando utilice los productos de GAF,tales como tejas, bases de pisos,cemento plastico,etc.,
consulte las SDS correspondientes. Las versiones mas actuates estan_disponibles en es.gaf.com. GAF no proporciona hojas de datos de
seguridad ni instrucciones de instalacion para productos que no sean fabricados por GAF. Consulte al fabricante del material para sus SDS e
instrucciones de instalacion segun corresponda.
e PLATAFORMAS BASE DE TECHOS: Use una plataforma base de 3/8"(10mm) de madera terciada u madera aglomerada orientada(OSB por
sus siglas en ingles) coma minimo segun to recomendado por la Asociaci6n Americana de Madera Terciada (APA por sus sigtas en ingles).
Las cubiertas de madera deben estar bien preparadas y apoyadas, con un espacio maximo de 1/8" (3mm),con un espesor minima nominal de
1"(25mm), con un ancho maximo de 6" 152mm),y una capacidad de retencion de clavos adecuada y una superficie suave. NO asegure las
tejas directamente al aistante o a la plataforma base aislada a menos que sea autorizado por escrito por GAF. Las ptataformas base de techo y
material de superficie existentes deben estar secas antes de la aplicacion de las tejas.
•CAPA BASE(barrera contra goteras): Instale barrera de filtraciones de GAF en los aleros en lugares donde el estancamiento de agua detras de
hielo o desechos podria causar filtraciones.
CAPA BASE(PROTECCION PARA CUBIERTAS DE TECHOS):La caps base debajo de las tejas tiene muchos beneficios, incluyendo el ayudar a
evitar que la Iluvia arrastrada por el viento alcance el interior del edificio y evitar que la savia de algunas plataformas de madera reaccione con
las tejas asfalticas. Donde vaya a instalar una capa base, use una de tipo respirable coma las capas base ShingleMate®o Deck-Armor''de GAF.
Tambien se puede utilizar la capa base Tiger Paw'"de GAF, con su diseno de control de la humedad.Siempre pida a un profesional en diseno
que revise los requisites de ventilacion Cuando utilice una capa base con diseno de control de la humedad. La'capa base tambien es requerida
por muchos c6digos de construccibn para mantener la calificacion Clase A de UL contra incendios. Cuando utilice el Fieltro Sintetico De
Alta Traccion FeltBusterrm Para Techos como capa base, DEBE instalarse sobre una capa de Proteccion de la Cubierta del Techo Ignifuga
VersaShield°con el fin de mantener una clasificacion Clase A contra incendios para las tejas asfalticas GAF.
M�tl
ualityYouCanTrust..
TECHNICAL AD ORY BU N6omNorthAmericas
Largest Naoring.Manufaclurert"
To:GAF Residential Sales,GAF Contractors,GAF Field Services
From:Technical Services Department
Date:07/31/2014
Subject:Acceptable Substrate For GAF Asphalt Shingle Applications
No TAB-R 2011-101-R1
l
Why Is The Substrate So A shingle roof substrate is the"foundation"for your roofing system. The substrate provides the smooth
Important? structural base on which asphalt shingles are installed. If the substrate is inferior,the.integrity of the roofing
system may be compromised.
What's Considered A Standard decks include:
"Standard Deck"For Shingles? Plywood or OSB...3/8"minimum thickness,exterior grade as recommended by APA—The Engineered
Wood Association _'
■ Wood planking...'Nominal 1"thick"(inin.)x 6"wide(max,)'vuood pla k g,with a maximum 1/8"spacing-
Notat the ends and,sides —
:_Eor_existing.older installations,if spacing is>1/8"5 1/4",install a double layer of underlayment. If the
spacing is greater than 1/4"install a layer of 3/8"minimum thickness APA labeled exterior grade plywood or
OSB over the wood planking.
Can The Other Substrates Be When properly installed using the fasteners and construction design recommended by the deck
"Used Without Prior Approval manufacturer,the following substrates may be used: j
■ GAF Cornell ThermaCal®1 Ventilating Roof Insulation Panels
■ GAF Cornell ThermaCal®2 Ventilating Roof Insulation.Panels
Loadmaster Shingle Deck
■ .Tech Shield or equivalent Radiant Barrier Decking systems with vapor permeable,perforated foil backing
Ainsworth'sThermastrand Radiant Barrier:-
■ 2"Minimum Homasote orThermasote(Homasote Co) x
■ 2".Minimum Span Rock Gypsum Plank(USG).-fpsteners must have a minimum 40 Ibs.,of pullout
•, Vented-R(Atlas),.
■ Vented Nail-Line(Apache) d
■ Hunter Vented Nail Base
■ Foam-Control Nail Base(AFM Corp.Licensed Mfr.)
■ Tectum III,Tectum E and Tectum NS(Tectum,Inc.)
■ Huber Zip Deck System—A waterproof underlayment such as StormGuard'leak barrier must be used at
eaves as required by code or for certain warranty considerations and additional underlayment may be
needed on slopes less than 4:12 or on re-roofing projects
Note: GAF shingles are not approved for applications directly over any insulation or fiberboard.
What About Structural. SIP may be use when:
Insulated Panels(SIP)? Approved/rated by UL for use as a shingle roof deck
■ With the minimum thickness of plywood or OSB as recommended above installed in accordance with the
SIP panel manufacturers recommendations for use as a shingle roof deck
What About Codes? Roof decks must meet local codes...and approval from the local building department should be obtained to
confirm the deck'construction and ventilation meets local code requirements.
Is.The Substrate Or Only GAF Cornell ThermaCal®1&2 Ventilating Roof Insulation Panels are covered by GAF under the GAF
Workmanship Covered Under` Cornell ThermaCal®Nail Base Roof Insulation Limited Warranty. See this limited warranty for complete
GAF Warranties?
coverage and restrictions.
All substrates must be installed in accordance with the deck manufacturer's specifications.Roof deck
installation instructions,including the need for a vapor retarder;for specific deck types must be obtained from
the respective manufacturer.GAF does not warrant the installation method,the performance of the decking
or problems with the shingles caused by the deck or substrate,including but not limited to:physical
movement,thermal bridging and/or moisture migration at the joints.
Where Can I Get More GAF Technical Services can assist you...with these and other questions you may have regarding your new roof •
Information? installation. GAF Technical Services can be contacted at 800-ROOF-411(800-766-3411). Also,the GAF
website is a great resource for just about any question you may have or for additional information you may
require. Please visit: www.gaf.com.
Copyright 2014 GAF•1361 Alps Road Wayne,NJ 07470•wt-r.eafx
a
r
Aua111yYouCanTrust.._
TECHNICAL ADVISORY` BULLETIN lFrvm NnnhAmerrca s
�ilargesl ttvo#ltrg Manufacturerl"
To:GAF Residential Sales,GAF Contractors,GAF Field Services r
From:Technical Services Department A
Date:07/31/2014
- � I
Subject:Acceptable Substrate For GAF Asphalt Shingle Applications
No:TAB-R 2011-101-R1
Why Is The Substrate So A shingle roof substrate is the"foundation"for your roofing system. The substrate provides the smooth
Important? structural base on which asphalt shingles are installed. If the substrate is infenor,the integrity of the roofing
system may be compromised.
What's Considered A Standard decks include:
"Standard Deck"For Shingles? 0 Plywood or OSB...3/8"minimum thickness,exterior grade[as recommended by APA—The Engineered
Wood Association
■ Wood planking... Nominal 1"thick(min.)x 6"wide(max.)wood planking,with a maximum 1/8"spacing
at the ends and sides
Note: For existing older'installations,if spacing is>1/8"51/4'S,install a double layer of.underlayment. If the
spacing is greater than 1/4"install a layer of 3/8"minimum thickness APA labeled exterior grade plywood or
OSB over the wood planking.
Can The Other Substrates Be When properly installed using the fasteners and construction design recommended by the deck
Used Without Prior Approval? manufacturer,the following substrates may be used:
■ GAF Cornell ThermaCal®1 Ventilating Roof Insulation Panels
■ GAF Cornell ThermaCal°2 Ventilating Roof Insulation Panels
■ Loadmaster Shingle Deck
■ Tech Shield or.equivalent Radiant Barrier Decking systems with vapor permeable,perforated foil backing
■ Ainsworth'sThermastrand Radiant Barrier
■ 2"Minimum.Homasote orThermasote(Homasote Co.)
■ 2"Minimum Span Rock Gypsum Plank(USG)—fasteners must have a minimum 40 lbs.of pullout
■ Vented-R(Atlas)
■ Vented Nail-Line(Apache)
■ Hunter Vented Nail Base
■ Foam-Control Nail Base(AFM Corp.Licensed Mfr.)
■ Tectum III,Tectum E and Tectum NS(Tectum,Inc.)
■ Huber Zip Deck System—A waterproof underlayment such as StormGuard�leak barrier must be used at
eaves as required by code or for certain warranty considerations and additional underlayment may be
needed on slopes less than 4:12 or on re-roofing projects!
;
Note: GAF shingles are not approved for applications direct) over an insulation or fiberboard.
PP PP Y Y
What About Structural• SIP may be use when: .
Insulated Panels(SIP)? aApproved/rated by UL for use as a shingle roof deck
■ With the minimum thickness of plywood or OSB as recommended above installed in accordance with the
SIP panel manufacturers recommendations for use as a shingle roof deck
What About Codes? Roof decks must meet local codes...and approval from the local building department should be obtained to
confirm the deck construction and ventilation meets local code requirements.
Is The Substrate Or Only GAF Cornell ThermaCal®1&2 Ventilating Roof Insulation Panels are covered by GAF under the GAF
Workmanship Covered Under Cornell ThermaCal°Nail Base Roof Insulation Limited Warran#y. See this limitel warranty for complete
GAF Warranties? coverage and restrictions.
All substrates must be installed in accordance with the deck manufacturer's specifications.Roof deck
installation instructions,including the need for a vapor retarder,for specific deck types must be obtained from
the respective manufacturer.GAF does not warrant the installation method,thle performance of the decking
.or problems with the shingles caused by the deck or substrate';including but not limited to:physical
movement,thermal bridging and/or moisture migration at the joints.
Where Can I Get More GAF Technical Services can assist you...with these and other questions you may have regarding your new roof., �
Information? installation. GAF Technical Services can be contacted at 800-ROOF-411(800-766-3411): Also,the GAF
website is a great resource for just about any question you may have or for additional information you may
require. Please visit: www.gaf.com.
• - Copyright 2014 GAF•1361 Nps Road Wayne,NJ 07470•www�af.can
j
lF
ITB#2016-7
St.Lucie County Housing Rehabilitation Program
Work Write-Up/Bid Form .
Owner: Robert E:and Eleanor Humphrey
Address: 358 Notlent Street.Fort Pierce, FL 34992
I I
Phone: Cell:(772)465-2909&Humphrey's son-Ken 772.344-1Z00
PLEASE CONTACT KEN TO MAKE ANY APPOINTMENTS.. l
E-mail: ssquirrel65600earthlink.net i
The work-write-up/bid form is a general outline of the work to be performed.Please refer to the
project specification booklet for detailed instructions(oreach item note'd below.
All items must be cost itemized in the space provided,each page of the bid documents that require signature
must be signed by the contractor and received before the deadline or the bid will be rejected.
I"
Item# Location Description of Work Price
Install new HVAC System. It shall be minimum 16-SEER Energy Sta'r"Rated
TRANE or equivalent brand,electric heating and air coriditioning systern with
1 HVAC service to all habitable rooms. Repair any leaky duct workand replace air $ D
6zo Ah
l
handler, piping, electrical, new vents and all other items necessary for a s
-complete system. - }
❖ Install GFCI receptacles in wet areas if not GFCI receptacles
+ Replace smoke detectors and install any.necessary ones.2 Electrical ❖ $9300
Replace original fuse and electric service equipment-refer to pager
32 of the Property Inspection Report on the SLC Portal
4• Connect grey water into septic system.
••r Replace toilet.
3 Plumbing Replace kitchen faucet. $ 00 1`
4• Replace tub fixtures and stopper.
❖ Replace the well pump. i
t
4 System
Abandon existing septic system.Install complete new drain field and tank. $ D
Repair and paint, if needed, any areas that have been disturbed liy your
S Painting work. 8q.0 f"
z
Replace exterior doors with Hurricane approved d £
6 Doors p pP doors that meets local-codes.Deadbolt shall be keyed alike. $2 00 lk
Windows
Replace windows with new Energy Star labeled windows i and accordion 7 and shutters per current Florida Building Code:Number,size and location� 'to be $) ;
shutters determined by existing window sizes. Impact windows may be used'if the (
price is similar. • i
Replace roof covering with shingles if permitted by code.Replace
deteriorated roof decking and support-members.where needed.Figut1 e3 $ QCG
sheets of decking and PROVIDE A PER SHEET PRICE.Remove existing gutter
8 Roof and replace only where required by the Health Department. Per sheet
Replace the metal roofing covering the back patio-refer to page 8 of Price:
the Property Inspection Report on the SLC Portal.
fi Re lace fascia board ands flits.
Homeowner Signature: 1
l ;
Contractor Signature:
ge 9 of I I r>
F
OPY
F
I #20
TB 16-7
Seco do a Water Barrier shall be installed. Full coverage Water Barrier. #
9 Secondary Please refer to Florida Building Code 11907.7.2 ROOFij$ECONDARY WATER $
Water BARRIER FOR SITE-BUILT SINGLE-FAMILY STRUCTURES. 1
�j
Barrier Product Information must be,provided and proof of invoice of product: V 00
l purchase. Pictures of installations will be required for paynnent of
1 roofing work.
` some framin drywall work and aintin
rg opening p
� Enlarge bathroom door o enrn for ADA compliance,will include
? + Replace columns on-front entry-way porch and-carport-refe to
10 Misc. page 13&14 of the Property Inspection Report on the SLC Portal. $ i
0 Sea]all exterior openings to prevent pest intrusion.
+ Secure an outside areas around the 1500
y pool-to prevent access to the
pool from the outside.Refer to page 18 of the Property Inspection
Report on the SLC Portal.Ensure screen doors/fence doors close i
and properly lock. ?
4 Contractor to provide homeowner with Uniform Wind
J Mitigation Inspection. 1
TOTAL PROJECT COST $ f L Q 0Q '
10%CONTINGENCY$
00
TOTAL+ 10% CONTINGENCY TOTAL PROJECT COST$ :90 R
i
NO OUA`LIFICATIONS,COMMENTS OR ADDITIONS PERMITTED ON THIS WURK WRITE-LIP
s
r
b
z
E i
a
R
I ,
s" Homeowner,Signature: r �ature: o A
Contractor'Signature:
8ge 10 of I I
s,
F S
g I,
C F"
a
i I
ITB#2016-7 ,,
THIS PAGE MUST BE INCLUDED WITH THE BID FOR IT TO BE VALID
1
All work to be performed in a workmanlike manner, in accordance with.the Housing.Pr gram Specifications.
State/local codes, Section minimum housing standards and manufactureris specifieations.',The contractor shall
be responsible for the repairs and/or reinstallation of materials/equipment/fixtures damag.-d or removed due to 11
any work item contained herein. Contractors shall properly dispose of all fixtures, materials and other items
removed from the dwelling unless otherwise specified herein. is
All items must be cost itemized in the space provided,each page of the bid documents that require signature must
be signed by the contractor and received before the deadline or the bid will be rejected.
1
Work must.be completed and approved within 105-days of the Notice-to Prbceed. This house is to be occupied ,
for 1 5-da s.Tf you cannot fulfill the time requirements of the project please do not submit:a bid.
j
I hereby certify that I am licensed by the State of Florida,Department of Business and Professional Regulation,
and that I am eligible to participate in the St. Lucie County Housing program.
Contractor Information- g
Name:
3
r
Address: U l
Phone:
Signature: I SA £'
1
1
f
3 II'
s I
s '
Homeowner Signature:
i
I Contractor Signature:
Page 1-1 of 11
b '
i
I
g
i
PAUL WELCH INC.
Mechanical * Electrical * Civil Engineering
1984 S.W. Biltmore St. Suite#114
Port Saint Lucie,FL 34984
Phone (772) 785 - 9888
May 23,2017 FILE,Re: Humphrey Post Replacement i COPY
358 Notlem Dr.
Fort Pierce, FL
SCOPE OF WORK
- Shore up existing carport during repair.
- Remove and replace the wood posts at the existing Car Port; (3)posts total as per attached
detail.
j
AlLadditions,repairs,,and alterations must comply with the FBC 2014 for existing buildings,the
FBC'2010,and the FBC 2014 residential
I
This is a repair as per Florida Building Code Existing and must comply with the FBC 2014 for
existing buildings chapter 6. l�
Note: Residence located"in negligible weathering area,and in very heavy termite infestation area per FRC 301.
NOTES:
-The contractor,subcontractor,supplier,ect.Shall verify all dimensions,conditions at job site,plans,
specifications,ect.
-Structural features not detailed on these plans will be addressed by the engineer a's construction
progresses.
-All written dimensions on these drawings take precedence over scaled dimensions{
I
STRUCTURAL NOTES
1) Design loads in accordance with ASCE7-10.
2) Splitting or cracking of structural components due to installation of hardware is not
permitted. 1
3) Unless otherwise noted,the installation of specified hardware shall conform to the
manufactures instructions and standard practicies. 1
Submi by:
PAUL_'WELCff
Paul le ,P.-k
Reg.No 29945
PW:pj .
a