HomeMy WebLinkAboutDrawing I I°P p STEPERS w
ARE THE RESPONSIBILITY OF
NTRACTOR OF.RE
1c
0
_ Master Bath
--- - — — — — -- — -- — -- Scope of-Work — — — —
-move
Convert Tub to Show&ESE PLANS AND ALL PROPOSED h'C:
Plumb New Shower FIARBEWECTTO ANY CORRECTIONS
BY FIELD THAT
New Vanity=&Top REQUIRED
J7a L(--e3 Plumb New Vanity Sinks &{yp�y_ TH AL APPLI ABL. CO S =- _---
LUCIE COUNTY BLILDV;G DIti'I`:fi;`
Install New Toilet �� �jTH ALL APPLICABLE copes
R'ED FOR C A'N�_
ENVEB Y
E
S PEI NUT IUST BE KEPT O N
rc� NO INSPECTIONWILL BE',LADE.
oJe ayy.
�el?
0
•r 0 ec
�+� o�
0
A—
GuestBath
I
Scope Work
i
NewShower
Plumb New Shower Fixtures
New Vanity &Top
Plumb New Vanity Sink& Faucet
Install New Toilet
Kitchen
Scope of Work
Note:This drawing is an artisticrg�119/2017
New Cabinetry &Tops interpretation of the general /2017
Plumb New Kitchen Sink& Faucet appearance of the design.It is Glues-1
Add Recess Can Lights not meant to be an exact rendition. Cit
eJohn-Renovation 113rawing 1 Orawing#: 1