HomeMy WebLinkAboutCompaction Test Headquarters � C IL t ENGINEERING Mailing
11345 U.S. Highway 1 ��lei AND TESTING PO Box 78-1377
Sebastian, FL. 32958 Sebastian, FL. 32978
Orlando 2cD 5-0 ` �� Phone: 77C.A.*5693
723 Progress Way � C.A.#5693
Sanford, FL. 32771 KSMengineering.net
SOIL COMPACTION REPORT
I
ASTM D 1557 and ASTM D 6938
I
DATE TESTED: August 25, 2021 KSM JOB#: 216759-1d BS '/ am
PERMIT M RECEIVED NUC# 528
Nuc Model: MC-IDR-P
CONTRACTOR: Manuel Garcia, SEP 13 2021 Nuc Serial#: MD049528
JOB LOCATION: 1718 Linwood Avenue St.Lucie County
Fort Pierce, Florida Permitting
ITEM TESTED: Compacted Foundation Fill
TEST LOCATION PEN DRY MAX. DRY PERCENT
-' ~ -- -- --OF-SAMPLE _ , _ DEPTH
READ -DENSITY' PROCTOR VALUE-(P:C.F)- - COYVIPAGTIOIV -
1 S.W. 0" - 12" 50 108.1 110.9 97.5%
2 N.W. tt tt
109.2 98.5
3 Center " 107.9 97.3%
4 N.E. "
108.5 11 97.8
5 S.E.
108.7 if 98.0%
Soil Description: 112.0 I I I I I I I
Brown Sand VU
E 111.0
In Place Moisture: I I I I I I I
9.4% G 110.0 -..J..-.I—..1..— —..L.. —.1-.._
H
Proctor Optimum Moisture:
12.0% T �09.0 -..�..-.1-...t. j.-..�..�.. j-.._
Proctor Max. Dry Density: P.C.F. P Y
110.9 108.0 •I—..;..-.i- T..-I.-..� ..�..-.)-.._
c
@Test Locations the Density& 107.0
I I I I I I I
�- -•r-••T••—t•-••�••-••-• -..-
Penetrometer readings indicate the F I I I I I I
Degree of Compaction Meets 106.0 - --I••-•I-••-I-'.-I•-••I-••--I••-•J-••-
Minimum Requirement `��` �E KE<<� I I I I I I I I
- ---ioi UnstakedFoundation`�`-� �0�� 105.0 --
Respectfully Submitted: Z 7 8 9 10 11 12 13 14 15
' No. 68366 =_
Diq?W ly sigmeCr = Moisture-%of Dry Weight
This item has been electronically signed and 00 to r Disclaimer: Contractor is responsible to maintain the tested area
sealed by Julie Keller,P.E.Fl.Lic.68366 on / r
the date stated directly to the right using a �I{/ �7 M 1 C of
digital signature. / A ��oIR�D in the condition that KSM completed the indicated passed
Printed copies of this document are not S NCO compaction test. KSM is not responsible if the tested area has
considered signed and sealed and the ,,�{.( S
signature must be verified on anyelectronic 2021 .U$/'�n FAL`X\�` been altered from the approved inspected condition.
copies.
10:09:33 -04'00'
Julie E. Keller, P.E. President
PE#68366 8/26/2021
i
Email to:
Test report shall not be reproduced,except in full,without the written approval of KSM Engineering&Testing
Geotechnical Engineering-Construction Materials Testing -Special Inspections-Civil and Structural Consulting
Proudly Serving Florida since 1990
Certified Women Owned Business-WBE