HomeMy WebLinkAboutProject Information-�- wrightsofte Manual S Compliance Report
Entire House
DEL AIR HTG, A/C & REFRIG. INC
531 CODISCO WAY, SANFORD, FL 32771 Phone:407-333-2665 Fax:407-333-3853 Web: WW W.DELAIR.COM
For: ADAMS HOMES
5350 San Benedetto Place, Fort Pierce, FL 34951
Design Conditions
Outdoor design DB:
90.4OF
Sensible gain: 26076
Btuh
Outdoor design W B:
77.4 OF
Latent gain: 4767
Btuh
Indoor design DB:
75.0 OF
Total gain: 30842
Btuh
Indoor FIR
50%
Estimated airflow: 1167
cfm
Manufacturer's Performance Data at Actual Design Conditions
Equipment type:
SpIitASHP
Manufacturer:
Carrier
Model: 25HBC537AP03+FX4DNF037L00
Actual airflow:
1167 cfm
Sensible capacity:
26453 Btuh
101 % of load
Latent capacity:
6155 Btuh
129% of load
Total capacity:
32608 Btuh
106% of load SHR: 81 %
Design Conditions
Outdoor design DB: 41.0 OF Heat loss: 28559 Btuh
Indoor design DB: 70.0 OF
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: SpIitASHP
Manufacturer: Carrier Model: 25HBC537AP03+FX4DNF037L00
Actual airflow: 1167 cfm
Output capacity: 31708 Btuh 111 % of load
Supplemental heat required: 0 Btuh
Backup equipment type: Elec strip
Manufacturer: Model:
Actual airflow: 1167 cfm
Output capacity: 7.9 kW 94% of load Temp. rise: 21 OF
. Meets all requirements ofACCA Manual S.
Job: Lot 122 Block 5 Waterston...
Date:
By: DCS
Entering coil DB: 76.4OF
Entering coil WB: 63.2OF
Entering coil DB: 69.5OF
Capacity balance: 36 OF
Economic balance: -99 of
-�- wrightsoft® 2oz1-Mar-os os os:a7
^•� °�� .��wM RigFt-Sute®Uriversal202121.0.02RSU23828
terstorlel820DGR\Lotl22Blk5Waterstorel82ODGR.rLp Calc=MJB Frort Door faces: NW Pagel
wri htsoft- Component Constructions Job: Lot 122 Block 5 Waterston...
9 Entire House Byte. DCS
DEL AIR HTG, A/C & REFRIG. INC
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665Fax:407-333-3853 Web: W W W.DELAIR.COM
Information
For: ADAMS HOMES
5350 San Benedetto Place, Fort Pierce, FL 34951
Location:
St Lucie Co Intl, FL, US
Indoor: .
Indoor temperature (OF)
Heating
70
Cooling
75
Elevation: 26 ft
Latitude: 28 ON
Design TD (OF)
29
15
Outdoor: Heating
Cooling
Relative humidity (%)
Moisture difference (gr/lb)
30
2.4
50
56.9
D bulb °F
Daily range (T) 41
115 ( L )
Infiltration:
Wet bulb (OF) -
Wind speed (mph) 15.0
77
7.5
Method
Construction qualify
Sim lified
p
Average
Fireplaces
0
Construction descriptions
Or
Area U-value Insul R
Htg HTM
Loss Clg HTM Gain
ft' BtuMtz`F ftz`FBtuh
Btuh/ftz
Bluh Btu"Btuh
Walls
1613-19ad: Knee wall, asphalt shingles roof mat, r-19 kw ins, 1/2" gypsum
board int fnsh
Blk wall, stucco ext, r-4 ext bd ins, 8" thk, 1/2" gypsum board int fnsh
Partitions
12C-Osw. Frm wall, 1/2" gyp.bd ext, r-13 cav ins, 1/2" gypsum board int
fnsh, 2'k4" wood frm, 16" o.c. stud
ne
20
0.049
19.0
1.42
28
2.59
52
se
20
0.049
19.0
1.42
28
2.59
52
sw
20
0.049
19.0
1.42
28
2.59
52
nw
20
0.049
19.0
1.42
28
2.59
52
all
80
0.049
19.0
1.42
114
2.59
207
ne
611
0.201
4.1
5.83
3561
4.06
2481
se
317
0.201
4.1
5.83
1846
4.06
1286
sw
534
0.201
4.1
5.83
3113
4.06
2168
nw
129
0.201
4.1
5.83
751
4.06
523
all
1591
0.201
4.1
5.83
9272
4.06
6458
270
0.091
13.0
2.64
713
1.31
354
Windows
2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/8"
ne
thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1.33 ft overhang
(5.3 ft window ht, 0.8 ft sep.); 6.67 ft head ht
se
sw
1 OC-v: 2 glazing, clr low-e outr, air gas, vnl frm mat, cir innr, 1/4" gap, 1/8"
all
se
thk; NFRC rated (SHGC=0.70); 12 ft overhang (6.7 it window ht, 0.5 ft
sep.); 6.67 ft head ht
2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/8"
se
thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 12 ft overhang (5.3
ft window ht, 0.25 ft sep.); 6.67 ft head ht
2A-2ov: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/8"
sw
thk; NFRC rated (SHGC=0.23); 50% drapes, medium; 1.33 It overhang.
(3.2 ft window ht, 0.8 ft sep.); 6.67 ft head ht
2A-2ov:_ 2 glazing, clr low-e outr, air gas, vnl frm mat, dr innr, 1/4" gap, 1/8" nw
thk; NFRC rated (SHGC=0.21); 50% drapes, medium; 1.3 ft overhang
(5.3 ft window ht, 0.83 ft sep.); 6.67 ft head ht
49
0.330
0
9.57
469
17.7
868
33
0.330
0
9.57
313
15.6
509
49
0.330
0
9.57
469
15.6
763
131
0.330
0
9.57
1251
16.4
2140
18
0.550
0
16.0
285
16.2
289
33
0.330
0
9.57
313
8.52
279
7 '
0.330
0
9.57
66
14.0
97
33
0.330
0
9.57
313
16.6
543
1 ' - wrilghtsoft- 2021-Mar-0909,05:47
�-•,�-Y Right-Sute®Uriversal2021 21.0.02 RSU23828
terstorel820DGR\Lotl228fk5WatdrstorL-182ODGR.nQ Calc=MJ8 Front Door faces: NW Paget
2B-2fv: 2 glazing, clr low-e outr, air gas, vnl frm mat, clr innr, 1/4" gap, 1/8" nw 5 0.330
thk; NFRC rated (SHGC=0.31); 9 ft overhang (1 ft window ht, 0.5 ft sep.);
6.67 ft head ht
2B-2fv: 2 glazing, clr low-e outr, air gas, vnl fnn mat, clr innr, 1/4" gap, 1/8" nw 13 0.330
thk; NFRC rated (SHGC=0.31); 50%drapes, medium; 9 ft overhang (6.7
ft window ht, 2 ft sep.); 6.67 ft head ht
Doors
11 JO: Door, mtl fbrgl type nw 20 0.600
Ceilings
166-30ad: Attic ceiling, asphalt shingles roof mat, r-30 cell ins, 1/2" 1835 0.032
gypsum board int fnsh
• Floors
22A-tpl: Bg floor, light dry soil, on grade depth 212 0.989
t wrightsoft®
•ww•..�m. Right-Sute®Uriversal2021 21.0.02 RSU23828
ACCN terstorie1820DGR\Lot122BIk5Waterstone1820DGR.np Calc=MJ8 FroM Door faces: NW
0 9.57
48
26.3
132
0 9.57
128
22.1
296
6.3
17.4
350
17.6
353
30.0
0.93
1703
1.69
3100
0
28.7
6080
0
0
2021-Mar-09 09.05:47
Page 2
- wrightsoft® Project Summary
Entire House
DEL AIR HTG, A/C & REFRIG. INC
531 CODISCO WAY, SANFORD, FL 32771 Phone:407-333-2665 Fax:407-333-3853 Web:WWW.DELAIR.COM
Prolect Information
For: ADAMS HOMES
5350 San Benedetto Place, Fort Pierce, FL 34951
Job: Lot 122 Block 5 Waterston...
Date:
By: DCS
Notes:
JA8-18-15
Change to 3.0 ton 2/16/16 S. Finch
RVSD 12/7/16 JA
L. S. 3-9-21 VWK
Design Information
Weather: St Lucie Co Intl, FL, US
Winter Design
Conditions
Summer Design Conditions
Outside db
Inside db
41 OF
70 OF
Outside db
Inside db
90
OF
OF
Design TD
29 OF
Design TD
75
15
'F
Daily range
L
Relative humidity
50
%
Moisture difference
57
gr/Ib
Heating Summary
Sensible Cooling Equipment Load
Sizing
Structure
Ducts
24339 Btuh
Structure
20299
Btuh
Central vent (0 cfm)
4220 Btuh
0 Btuh
Ducts
Central vent (0 cfm)
5777
0
Btuh
Btuh
none
Humidification
0 Btuh
Blower
0
Btuh
Piping
0 Btuh
Equipment load
28559 Btuh
Use manufacturer's data
y
Infiltration
Rate/swin multipplier
EquipmeNsensibleload
1.00
26076
Btuh
Method
Construction quality
Simplified
Average
Latent CoolingEquipment Load Sizin g
Fireplaces
0
Structure
3364
Btuh
Ducts
Central vent (0 cfm)
1403
0
Btuh
Btuh
Area (ft2)
Heating Coolingg
1820 1820
(none)
Equipment latent load
4767
Btuh
Volume (ft3)
18350 18350
Air changes/hour
Equiv. AVF (cfm)
0.38 0.20
116
Equipment Total Load (Sen+Lat)
30842
Btuh
61
Req. total capacity at 0.75 SHR
2.9
ton
Heating Equipment Summary
Cooling Equipment Summary
Make Carrier
Trade CARRIER
Make Carrier
Trade CARRIER
Model 25HBC537AP03
AHRI ref 204837926
Cond 25HBC537AP03
Coil FX4DNF0371-00
Efficiency
Heating Input
8.5 HSPF
AHRI ref 204837926
Efficiency 12.5 EER,16
SEER
Heating output
34600 Btuh @ 47°F
Sensible cooling
Latentcooling
26250
8750
Btuh
Btuh
Temperature rise
Actual airflow
27 OF
1167 cfm
Total cooling
Actual airflow
35000
1167
Btuh
cfm
Airflowfactor
Static pressure
0.041 cfm/Btuh
0.40 in H2O
Airflowfactor
Static pressure
0.045
cfm/Btuh
Space thermostat
Capacity balance point = 36 OF
Load sensible heat ratio
0.40
0.85
in H2O
Backup:
Input = 8 kW, Output = 26788 Btuh,100 AFUE
Calculations approved byACCA to meet all requirements of Manual J 8th Ed
- wrightsoft- 2021-M0909:05:47
�� • � �• Right-Sute®Uriversa12021 21.0.02 RSU23828 ar-
terstone1820DGR\Lotl22Blk5WaterstorL182ODGR.rLp CaIc=W8 Front Door faces: NW Page 1
'�- wrightsoft Right-JO Worksheet
Entire House
DEL AIR HTG, A/C & REFRIG. INC
531 CODISCO WAY, SANFORD, FL 32771 Phone:407-333-2665 Fax:407-333-3853 Web: W W W.DELAIR.COM
Job: Lot 122 Block 5 Waterston 1...
Date:
By: DCS
,L� Calculations approved b ACCA to meet all requirements of Manual J 8th Ed.
A& -*-�-
` Righ-Sute®Uriversal 2021 21.0.02 RSU23828 2021-Mar-09 09.05:47
terstorel820DGR\Lotl22Blk5Waterstorel82ODGR.rLip Calc=WB Frond Door faoes:NW Page
- wrightsoft* Right-M Worksheet
Entire House
DEL AIR HTG, A/C & REFRIG. INC
531 CODISCO WAY, SANFORD, FL 32771 Phore:407-333-2665 Fax:407-333-3853 Web: W W W.DELAIR.COM
Job: Lot 122 Block 5 Waterston 1...
Date:
By: DCS
1
Room name
BATH 2
BDRM3
2
Exposed wall
6.0 It
13.0 it
3
Room height
10.0 ft heaUcool
10.0 It heat/cool
4
Room dimensions
13.0 x 6.0 It
13.0 x 13.0 ft
5
Room area
78.0 ftz
169.0 ftz
Ty
Construction
U-value
Or
HTM
Area (ftz)
Load
Area (ftz)
Load
number
(Btum -f
(Btuh/ftz)
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/PiS
Heat
Cool
0.
60
Blk wall, stucco ext
0.201
ne
5.83
4.06
60
350
244
130
114
663
461
_
2A2ov
6619ad _
0330
;, 0 049
ne
' se_1.42-
9.57
17.70
µ259
0
"J ° 000Q0
0
0�
0
16
0
'.0
156
289
a 0.
11
Blk wall, stu000 ext
0201
se
5.83
4.06
0
0
0
0
0
_ ..
0
�_Q
0
0
10C-v
0.550
se
15.95
1620
0
0
0
0
0
0
0
0
2A-2ov
0.330
se
9.57
15.57
0
0
0
0
0
0
0
0
2A 2ov
0.330
se
9.57
8.52
0
0
0
0
0
0�0
0
,0
0���
0
^' 0
_
- _ 0
�. _. : rQ
.�^_.-_�0
.yam 10
W
.. a�:0 049
sw
�. 142.
r--
2.5.9
Blk wall, stu000 ext
2A-2ov
0201
0.330
sw
sw
5.83
9.57
4.06
13.95
0
0
0
0
.0,w
0
0
0
0
0
0
0
_W,
2A 2ov _
W166t19ad ,,
0.330
.-.�.._.-,�--�-
w 0049
sw
wnw
9.57
142'
15.57
, �2.59_0
0
0
,0
_ 0
'-�0_Q
0
0
0
0
0
0
0
0
0
0
Blk wall, stucco ext
2A-2ov
0
0
~µ 0»0
0
0
0
0
0
0
0.201
0.330
nw
nw
5.83
9.57
.4.06
16.61
0
0
0
0
0
0
2B-2fv
0.330
nw
9.57
26.32
0
0
0
26-21v
0.330
nw
9.57
22.09
0
0
0
0
0
0
0
0
0
0
0
0
0
11J0
0600
nw
1740
1758
0
0
0
0
0
0
0
P
12C Osw _
_ U091
264
] 3T
0
p
.r., `; 0=
0
.0
C
16B 30ad
r 0032a
093
1 69
78
78
72
132
n 169
169
� �--�-- -
._:._�-"•13
157
.�.....�:,;373
286
.c,,,..,,->.,-,::a
n
..'-ws�.ar ".�.,.si
d?i:. `•R
»'.:._t'u,:',:
><
..u...a_,.._>...-.�.a...�-
....
..
.»,.i..+_-«...
_.........
...mac,-.....-.
nv-S.a...
.n.....-.
-...
T......
_„n-_..-.
.__._.
'T'2•'"`:7
inn-•-.
w+._.+++_-"Y
,^"'.'C
-1..�
,�....�,.,....a.-.......
.. ;.y
.............-..1��u.._.«....
v 'x�
,r......wa w
,;.::
.�3.�,..a
-�,�1 %
._4:....a.2Y_w:s'
^T."i�`
..,...o�..t
L E•.r"1.�^.F
..a_..«:...
n..,,-'^`*rl
^`ye_""TM,^^-.m+7
py
..
_..,....
....,._.�
..
...,---+.....a ....,.w*.w...:_.L....:n...-
...._..�-
....,
...a.....n.,f.�.;...
l ut:.a,......a.
.. ..« n
,._...e............
.....u1.
.....T.
,..
6
c) AED excursion
-11
23
Envelope loss/gain
594
365
1349
1013
12
a) Infiltration
115
32
249
70
b) Room ventilation
0
0
0
0
13
Internal gains: Occupantsr?a 230
0
0
0
Applianoes�other
0
0
300
Subtotal (lines 6 to 13)
709
397
1598
- 1383
Less extemalload
0
0
Lesstransfer
0
0
0
0
0
0
Redistribution
0
0
0
0
14
15
Subtotal
Duct loads
709
397
1598
1383
17 %
28 %
123
113
17 %
28%
277
394
Total room load
Air required (cfm)
832
510
1875
1777
34
231
77
80
Calculations approved bvACCA to meet all requirements of Manual J 8th Ed
Righ-Sute®Uriversal202121.0.02RSU23828 2021-Mar-0909:05A7
...terstore1820DGR1Lotl22Blk5Waterstoml82ODGR.rip Calc=MJB Front Door faces: NW Paget
-- wrightsoft9 Right-JO Worksheet
Entire House
DEL AIR HTG, A/C & REFRIG. INC
531CODISCOWAY,,SANFORD,FL32771Phone:407-333-2665Fax:407-333-3853 Web:WWW.DELAIR.COM
Job: Lot 122 Block 5 Waterston 1...
Date:
By: DCS
1
2
3
4
5
Room name
Exposed voll
Room height
Room dimensions
Room area
DINING/FOYER
25.0 ft
10.0 It heaV000l
1.0 x 276.0 it
276.0 ft2
DENBDRM4
31.0 It
10.0 ft heaV000l
13.0 x 13.0 ft
169.0 ftz
Ty
Construction
number
U-value
(Btuh/ftz-'F)
Or
HTM
(Btuhflt2)
Area (ftz)
or perimeter (ft)
Load
(Btuh)
Area (ft)
or perimeter (ft)
Load
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/PS
Heat
Cool
6
11
!/v_
VI/
16619ad_ _
Blk wall, stucco ext
2A 2ov
316&19ad M _.,
Blk wall, stucco e)d
10C-v
2A-2ov
_
:11 k�uvallstuo ext
2A-2ov
2A 2ov
16B 19ad^`
Blk wall stucco ext
2A 2ov
2B-2fv
26-2ty
11J0
12C OsN +
1613-30ad
0 0;049
0.201
0.330
n . �.
....�w�:-0 ,049
0.201
0.550
0.330
0209
0.330
0.330
�' Q,049
0.201
0.330
0.330
0.330
0.600
_ . b 091
0.032
ne
ne
_
se
se
se
_
sw
sw
�nw
nw
nW
nw
nw
nw
' a` -
5.83
9.57
_
5.83
15.95
9.57
9.57
� . j 42i
5.83
9.57
9.57
z 1:42
5.83
9.57
9.57
9.57
17AO
�' 2 64'
093
4.06
17.70
4.06
1620
15.57
8.52
. 259
4.06
13.95
15.57
4.06
16.61
26.32
22.09
17.b8
MMX
169
110
33
0
0
0
0
, °w 0
0
0
0
-
130
0
r ...
Q
758
0
0.
77
_ 0
451
313
314
579
130
0
528
0
-G
W
Vh
'_W ,,1�
_.7
P
C
0
0
0
0
, ..•"#Y'w 0
0
0
0
32
0
0
0
- 20
W70
276
0
0
0
0
�`• 0
0
0
_ 0
184
0
48
128
350
;•185
256
0
0
0
0
.0
0
0
0
128
0
132
296
353
92
466
0_
0
0
0
0
50
0
0_
130
33
0
0
0
w,?,.�,0
w 169
0
0
0
0
0
50
0
0
97
•0
0
0
0
� „-,0
169
0
0
0
0
` i _ ..p;
291
0
0
567
313
0
0
0
�..,.,� ,Q.
157
0
0
0
0
_.. 0.
203
0
0
395
543
0
0
0
,.�; „,.....Q
286
70
0
5
13
20
: � '`:O
276
-,.
..n....w.........>_..,.........
<,:.>=
4:,.Z„_.,.,ow,.-
°
w-b;.✓....e�._.,..ro.1'.�..,..ts...,
.,.mu' .,fi. ..:..,.>:P
....vu..;x'
� .r...
>,bin :.>_,
wrs:a: "'.,..w..,..,'
r., m
_.a�.
......_..-"z.^"�
'3-' �
.w ..G,� A
v..�....._��..._,ax_...Iwb•:f:.e'..-
a.d'a.,...�.'.
'..3..-..J '�Jk`}'���N
...,..
_° ...rw.«..
m.......,..¢tw
._..,r
�
�.-�}�~
....ter
a
n«�,,,J•
w..k.4as".
wd:...... +.-_u ':�..�a.-..x....:,-
,....»..tw:sdw»»
."-._ice.......-....w-�..
-.w
.,...n
..
6
c) AED excursion
-261
223
Envelope loss/gain
2631
2333
2975
2177
12
a) Infiltration
b) Room ventilation
345
0
97
0
595
0
166
0
13
Internal gains: Occupants@ 230
Appliancestother
1
280
0
0
0
300
Subtotal (lines 6 to 13)
2976
2660
3570
2643
14
15
Less extemalload
Less transfer
Redistribution
Subtotal
Duct loads
17%
28 %
0
0
0
2976
516.
0
0
0
2660
757
17 %
28 %
0
0
0
3570
619
0
0
0
2643
752
Total roam load
Air required (cfm)
3492
143
3417
153
4189
171
3395
152
Calculations approved byACCA to meet all requirements of Manual J 8th Ed
tl+= .Pwffl 0
2021-Mar-09 09 age 3
Right-Sute®lJriversal 2021 21.0.02 RSU23828 Page 3
terstorel820DGR\Lotl22Blk5Waterstorel82ODGR.rLp Calc=MJB Front Door faces: NW
- wrightsoft® Right-JO Worksheet
Entire House
DEL AIR HTG, A/C & REFRIG. INC
531 CODISCOWAY,,SANFORD,FL32771 Phone:407-333-2665 Fax:407-333-3853 Web:WWW.DELAIR.COM
Job: Lot 122 Block 5 Waterston 1...
Date:
By: DCS
1
Room name
FAMILY RM
WTR BDRM
2
Exposedvdl
13.0 ft
41.0 ft
3
Room height
10.0 ft heaV000l
10.0 ft heaV000l
4
Room dimensions
13.0 x 22.0 ft
14.0 x 17.0 ft
5
Room area
286.0 ftz
238.0 ftz
Ty
Construction
U-value
Or
HTM
Area (W)
Load
Area (ftz
Load
number
(Btuh/ftz`F)
(Btuh/ft2
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
I Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
Wow
�16&19ad;�,_;
w�,0,049
Y;�e�:
Blk wall, stucco eM
0.201
ne
5.83
4.06
0
0
0
0
100
100
583
406
2A 2ov
0.330
ne
9.57
17.70
0
0_
0
0
0
0
0
0
.
�W_.�,`:
�16B•19ad��•�.
,��;_0.;049
•�se�.
41 2
_
�2:59
��,20
_
_.�„ �..�;w2Q':._.�-28
e.52
�."---.._..._,_Q
�_�..:.�.0,
- - -
_'w0
°�•0;
11
VhBlk
wall, stu000 ext
se
5.83
4.06
130
79
0.201
463
323
140
124
_a
,,:;'y.,....
721
502
10C-v
0.550
se
15.95
1620
18
18
285
289
0
0
0
0
2A 2ov
0,330
se
9.57
15.57
0
0
0
0
16
4
156
254
2A
0.330
se
9.57
8.52
33
33
313
279
0
0
0
0
AM
"6&12ov 9atl0
0.49.
Zswr'
_
Blk wall, stucco ext
0201
sw
5.83
4.06
0
0
0
0
170
154
896
624
2A 2ov
0.330
sw
9.57
13.95
0
0
0
0
0
0
0
0
_W ry
2A 2ov
36B 19ad''
0.330
.. 0,049
sw
�nw_,
9.57
,_..; 142
15.57
2;5920
0
0
0
0
16
4
156
254
Blk wall, stu000 ext
2A-2ov
0.201
0.330
nw
nw
5.83
9.57
4.06
16.61
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
213-2(v
0.330
nw
"9.57
26.32
0
0
0
0
0
0
26-2fv
0.330
nw
9.57
22.09
0
0
0
0
0
0
0
0
0
0
600
nw
17.40
17.58
0
0
0
0
0
0
0
0
P
12CdOsw {a :
r� '09j
2,64
_ 1.3 j
m0
�.r r ,, 0
0
G 0
key 0
0
0
C
�F
166 30ad
0A32
'
093,
169
286
402
286
265
483
238
238
221
22A ipf _ .,_,_,,�_,.,v,,�_.
_•,,,�; ..0.989
�
----h-7;----max-
,;,.*�„--
T
;---�
�--'- yy-;�;
>---'-T-�;-.-'.
-n-.».-,_
�„-,-----T-•-e
�
--,-,.--.,._
_
___m__.
�_ _
�_ue
��
_•''
a_
_
7-�
_
_
d�.:d.
uw.
,....s....-.x.�
:_.,.,. o-,.,
z..aa.,..,.._•,.b'K.�
,.m,...s'+,...��3,.......+.�:w.�,.,.«
_ .............
._w.
...,......«'r'
6
c) AED excursion
-71
-92
Envelope loss/gain
1813
1510
3909.
2350
12
a) Infiltration
403
113
787
220
b) Roomventilation
0
0
0
0
13
Internal gains: Oocupants@ 230
3
690
1
230
Appliances/other
300
600
Subtotal (lines 6 to 13)
2216
2612
4696
3400
Less extemalload
0
0
0
0
Lesstransfer
0
0
0
0
Redistribution
0
0
0
0
14
Subtotal
2216
2612
4696
3400
15
Dud loads
17 %
28 %
384
744
17%
28 %
814
968
Total room load
Air required (cfm)
2600
3356
55iO
4368
1061
150
1
2251
195
Calculations approved bVACCAto meet all requirements of Manual J 8th Ed
wrigt�lsoft- Aftk flight-Sute®Uriversal 2021 21.0.02 RSU23828 2021-Mar-09 09:05A7Page 4
terstorel820DGR'Lotl22Blk5Waterstore182ODGR.rLp Calc=MJ8 Front Door faces: NW
- - wrightsofV Right-M Worksheet
Entire House
DEL AIR HTG, A/C & REFRIG. INC
531 CODISCOWAY,,SANFORD,FL32771 Phore:407-333-2665 Fax:407-333-3853 Web:WWW.DELAIR.COM
Job: Lot 122 Block 5 Waterston 1...
Date:
By: DCS
1
2
3
4
5
Room name
E)posedwall
Room height
Room dimensions
Room area
M BATH
12.0 It
10.0 it heat/cool
1.0 x 119.0 ft
119.0 ftz
M WIC
0 It
10.0 ft heat/cool
7.0 x 7.0 ft
49.0 ftz
Ty
Conslruction
number
U-value
(Btuh/ftz )
Or
HTM
(Btuh/ftz)
Area (ftz)
or, perimeter (it)
Load
(Btuh)
Area (ft')
or perimeter (ft)
Load
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
11
W
V)/
L�
V _;�;
<W �
W
C _
16619ad -w
Blk wall, stucco eM
2A-2ov
166-19ad,T
Blk wall, stucco ext
10C-v
2A-2ov
2A 2ov
21166-19ad=,._"jai=,
Blk wall, stucco eM
2A 2ov
2A 2ov
;j,6619ad _v
--
0A49
40.201
0.330
0_049
0201
0.550
0.330
0.330
=Up
0201
0.330
0.330
�0.049
0.201
0.330
0230
0.330
0.600
,. 0,0912,64
0.032
'
:ne
ne
ne
_se._
se
se
se
se
_:swz
sw
sw
sw
_nw
nw
nw
nw •
nw
nw
-,":�:.'
1,.42,
5.83
9.57
142;
5.83
15.95
9.57
9.57
2M,42.
5.83
9.57
9.57
-A
5.83
9.57
9.57
9.57
1740
0.93
..,,'"'......
..� "�
..
.._...�.�.ti0
_
.._,�5;-.._0
_
�- 0
- -
.r �..._:� 5
_
0
_� __
. �.0
_ _
<._.. _ 9
=,.__,.._..._
_ _ _ - 0.
4.06
17.70
,. _<2:59
4.06
1620
15.57
8.52
_..a._,2:59
4.06
13.95
15.57
Lw2.59
4.06
16.61
26.32
22.09
1758
t.3'1,
1.69
0
0
_IL.
0
0
_ . _ - . - 0
0
0
0
0
0
:.:=::m_
0
0
0
0
0
,0
0
0
- _.:0
0
0
11 ._ �0
0
0
0
0
n�='
120
7
0
_ ' 0
0
0
0
0
0
0
0
0
0
0
0
0
:..,„.,..._..
0
0
0
0
=J
0
0
0
0
==0
0
0
0
0
_...=
0
0
0
0
113
3
0
:. ' - 0
659
66
_ 0
__.�0
459
97
0
;. 9
0
0
0
'0_
0
0
0
0
0
0
_
0
0
0
-_«
Blk wall, stu000 ext
2A-2ov "
26-2W
28-21v
11J0
12C Osw:-',m-- -
161330ad w
0
0
0
0
0
:� "0
0
0
0
0
0
. a0
0.
0.
0
0
0
0
_ 0
0
0
0
0
w _0._
0
0
0
0
0
0
0
0
0
0
0
: 0.:'
0
0
0
0
0
r 0::.:
0
0
0
0
0
Q'•
83
_v»..,.0
_ 119
'77
_- ,119
110
201
49
49
_ 0
45
- -, ., p
....3.
-.x...�._..-.. m..,-.«.w.�,
_..w....
..,.....k�
.,.. .s.....ai
....,._-.,... �
� ..ar,..W...a:
..,
..o
_..�..�..«+.�:s
»..,...F �......,...
_ .....x..
..
...w,.aA...�c
.ter....,..,.-...,;
3:„.._o.....'.--....._'�.:...,.s...a..�:.:.,a.E:
�waL..<�ula.:...a
_..:.a.:>..�a...,..uw.&,3..,.,...s.�:..<...:.-,_...._......
t
.`._,.
....-...
7
Z..........s 'ti3
��.....
�`<.._.'
w--..
..-..,.,.:.d.�.._..
..r.�:�1oi.,.......,r.........m...
_s+.a.-.....
-
..
..
§
�'^^^w^> i<'1<" '%'•`
.w+...,.g..;+..m
r„".
w..- P",w;`fl
'^" .;
m ."'i"^"'
".gym""
-.a-�
w '^rt�
_.
n+�..urst.,.i..:uS.'t�...d_...L+.L....v+..r{..w..n.a-
.a
...a4
..w..,+.ame.�
<.r.L..:.i..✓
u.Pa•.....
..._..vKw.".._.._...2.^r.-_NvA.r.i
:.=+.ta-�
...+.u.2+ek..�;«.-�
..:"^T^ ..».,e
wu Vprt ..--.-..v-_... »nr-s.
-�....._3.
.�..a
.emu
...�.�.»..�y,�..
^.•-+;x..»
......,
r--,-•.+.
...
6
c) AED excursion
36
-2
Envelope loss/gain
1180
793
45
81
12
a) Infiltration
b) Room ventilation
230
0
64
0
0
0
0
0
13
Internal gains: Occupants@ 230
Applianoes%ther
0
0
0
0
0
0
Subtotal (lines 6 to 13)
1410
858
45
81
14
15
Less extemalload
Lesstranster
Redistribution
Subtotal
Duct loads
171%
28%
0
0
0
1410
245
0
0
0
858
244
17%
28%
0
0
0
45
8
0
0
0
81
23
Total room load
Air required (cfm)
1655
68
1102
49
53
2
104
5
Calculationsapproved bvACCA to meet all requirements of Manual J 8th Ed
-* wrfigf�tsoft
2021-Mar-09 �09Ue 5� Right-Sute®Uriversal 2021 21.0.02 RSU23828 Page 5
terstane1820DGR1Lot1228Ik5Waterstore1820DGR.nQ Calc=MJB Front Door faces: NW
- +- wrightsofr Right-M Worksheet
Entire House
DEL AIR HTG, A/C & REFRIG. INC
531 CODISCO WAY, SANFORD, FL 32771 Phone: 407-333-2665Fax:407-333-3853 Web: W W W.DELAIR.COM
Job: Lot 122 Block 5 Waterston 1...
Date:
By: DCS
1
2
3
4
5
Room name
Exposed wall
Room height
Room dimensions
Room area
KrrCHENMOOK
29.0 ft
10.0 ft heaV000l
1.0 x 246.0 It
246.0 ft2
LAUNDRY
6.0 It
10.0 It heall000l
6.0 x 6.0 ft
36.0 ft2
Ty
Construnumber
BU-value
( IF)
Or
HTM
(Btuh/ftz)
Area (ft2)
or perimeter (ft)
Load
(Btuh)
Area (ft2)
or perimeter (ft)
Load
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
1.1
W „ ,
t-G
'.. =
�BIk
�W�,,,�;;:
P
C
�F �'� '
16B 19ad"•
Blk wall, stucco ext
2A 2ov
K:166 19ad : � w��..�
wall, stu000 exd
10C-v
2A-2ov
2A 2ov
a16B�19ad_-.�,_.,_,_„„w.
Blk wall, stucco exd
2A 2ov
2A 2ov
Bilk wall, stucco exd
2A-2ov
2B-2fv
2B-2N
11J0
12C Osw e0.09.1.
1613-30ad
22A QW:��......- '
•' „� ^ d
0,049
0201
0.330
._____�. , OAS
0.201
0.550
0.330
0.330
-.�..:.0049
0201
0.330
_0.330
Q049
0.201
0.330
0.330
0.330
0.600
0.032
w�. � _.: 0989
ne:
ne
ne
sew°
se
se
se
se
_swM
sw
sw
sw
J?w�'_
nw
nw
nw
nw
nw
,
:....�
._._. 1,42:
5.83
9.57
1:.42
5.83
15.95
9.57
9.57
,,.e 1,42;
5.83
9.57
9.57
t:42,„v259�.,0,�._
5.83
9.57
9.57
9.57
1740
- w2.64
093
''• 28 68
...� :
4.06
17.70
=259
4.06
1620
15.57
8.52
..�.a2.59
.0
0
_. ,t ;.0
0
0
0
0
�.,.�,,..,::;k0
0
0
0
�0
0
0
I = 0
�
0
0
�� "_ 0
�0
0
0
Z- . 0
0
0
0
0
.a-s;:°�_�.._:0
0
0
y �0
0
0
" �
0
0
0
0
'.�.._ ,�:.0;
0
0
0
0
0
0
.w.___._•:;.0.
0
0
0
,.,,.6.�� U
0
0
0
0
_.:r�.0�..a�r>,_.a0
0
0
0
0
0
0
0
_`"`.-.` .r;0
_
4.06
13.95
15.57
4.06
16.61
2622
22.09
17.58
_ _ 131'
169
""� "" _-
a...�. OOQ
150
0
33
117
0
8
•:0
684
0
313
476
0
`•< 509
0
0
0
0
0
0
"'-------.-.'"•.._
0
0
0
0
0
0
0
0
0
0
0
14Q
246
� ,•s» -._
246
0
0
-0
0
. "_ ' 0
140
0
0
0
0
0
369
228
��•-s-
ti'� , ;`832
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
183
416
�?, ., 0
_60
-� 36
„, 36
60.
36
-� ,.....-,--�.-
158_
3.3
_
W _
79
61
i
�, 246
_ „,..��29
o.... ..;_...
�,..,..�r; .._..
v ..�.�..
, k17,
-_,_.A.--
`»." a .r.._�.._ ::�,,.:s„_s. ,r+
..........x�.u,>a,_,..za».i.;:
-U....,,._ .,s:
;e�.s.. .`
e.�..,�r „n„ _•
7�,....,.
4 .ems a.
L..F,..,,v...
'�aa"..�...:Ptiww.a........
.. 1"+..+,_. a.......
.......�-,
3',,..-....e �.u..w.w.�.
RSRi
.«...�..,.x'.a....:a,
.aww....-�
'.uw....,.L.....w.1v.��+,......».
...4•.�...•
,». �
,Nr,..,,,a
_ ,a, 'L?-'sw
_.......i..'i.,eaM-..
..,.......w.<
»»..�..sa..
>��...
�.,W�.;�v 2.-...
�.
_
w....-a..:.».
uym.........d....._..,..:.1.-..,. '..�...,:.
a.,......,,:s'�...,:.,.,e.,.
�._:a..
;...t....,,._...-..::v...,,...ri...-x
ea...,., l..n.»;'^.a:.,
...»n,..�*':.d
-+...Y.,:..,i:,�w....
...,.. +w::eea..._:.u.�n.-
c
....waa...__ .ds.»,
•tea..-1-::w,w
w..k...w.s..•o3-.,r
ter.
:�.�.�..a.J...�....
«.m....._.
..-.
.�._-...�...:
�,.a
�..` ..._�.
^-n+,.an
'.--,'•-•--n».....
,..ram._"^
..t^'-
..�,.�...:.�:..b.-
....,�.
_._..
�..
_....
m •x.-
- ;.«..c,e-.
17
..:a=
6
c) AED excursion
176
-20
Envelope losstgain
2426
1761
364
120
12
a) Infiltration
b) Room ventilation
288
0
80
0
0
0
0
0
13
Intemalgains: Occupants@ 230
Applianoes/other
0
0
1200
0
0
600
Subtotal (lines6to13)
2714
3041
364
720
14
15
Less eMemalload
Less transfer
Redistribution
Subtotal
Ductloads
17%
28%
0
0
0
2714
471
0
.0
0
3041
865
17%
28%
0
0
0
364
63
0
0
0
720
205
Total room load
Air required (cfm)
3185
130
3906
175
427
17
925
41
Calculations approved byACCA to meet all requirements of Manual. J 8th Ed
-�' wr7gF�tsoTt'°
«.. .�,vT , 2021-Mar-0909:05:47
�� Right-Sute®Uriversal 2021 21.0.02 RSU23828
terstone1B20DGR\Lot122Blk5Waterstone1820DGR.np Calc=MJB Front Door faces: NW Page 6
Duct System Summary Job: Lot 122 Block 5 Waterston...
-i - wrightsoft, Date:
Entire House By: DCs
DEL AIR HTG, A/C & REFRIG. INC
531 CODISCO WAY, SANFORD, FL 32771 Phore:407-333-2665 Fax:407-333.3853 Web: W W W.DELAIR.COM
Project• •
For: ADAMS HOMES
5350 San Benedetto Place, Fort Pierce, FL 34951
External static pressure
Pressure losses
Available static pressure
Supply/ return available pressure
Lowest friction rate
Actual airflow
Total effective length (TEL)
Heating
0.40
in H2O
0.06
in H2O
0.34
in H2O
0.170 / 0.170
in H2O
0.300
in/100ft
1167
cfm
113 ft
Supply Branch Detail Table
Cooling
0.40 in H2O
0.06 in H2O
0.34 in H2O
0.170 / 0.170 in H2O
0.300 in/100ft
1167 cfm
Name
Design
(Btuh)
Htg
(cfm)
Clg
(cfm)
Design
FR
Diam
(in)
H x W
(in)
Duct
Mal
Actual
Ln (ft)
Ftg.Egv
Ln (ft)
Trunk
BATH 2
h 832
34
23
0.394
4.0
Ox 0
VI Fx
16.3
70.0
BDRM2
h 4740
194
144
0.366
8.0
Ox0
VIFx
22.9
70.0
BDRM 3
c 1777
77
80
0.433
6.0
Ox 0
VI Fx
8.6
70.0
DEN/BDRM4
h 4189
171
152
0.409
7.0
Ox0
VIFx
13.2
70.0
DININWFOYER
c 3417
143
153
0.444
7.0
Ox 0
VIFx
6.5
70.0
FAMILYRM
c 3356
106
150
0.330
8.0
Ox 0
VIFx
17.9
85.0
sti
KrrCHENNOOK
c 3906
130
175
0.323
8.0
Ox0
VIFx
20.1
85.0
sti
LAUNDRY
c 925
17
41
0.316
4.0
Ox 0
VI Fx
22.7
85.0
st1
M. BATH
h 1655
68
49
0.317
5.0
Ox 0
VI Fx
22.2
85.0
st1
M. W Ic
c 104
2
5
0.318
4.0
Ox 0
VI Fx
21.9
85.0
sti
MSTR BDRM
h 5510
225
195
0.300
8.0
Ox 0
VI Fx
28.2
85.0
sti
Supply Trunk Detail Table
Name
Trunk
Type
Htg
(cfm)
Clg
(cfm)
Design
FR
Veloc
(fpm)
Diam
(in)
H x W
(in)
Duct
Material
Trunk
sti
PeakAVF
549
616
0.300
576
14.0
0 x 0
VinlFlx
-*- wrightsoft®
� , • •_. m Right-Sute®Uriversal 2021 21.0.02 RSU23828
terstone1820DGR\Lot122BIk5Waterstore1820DGR.np CaIc=MJ8 FrortDoortaoes:NW
2021-Mar-09 09:05:48
Page 1
Return Branch Detail Table
Name
Grille
Size (in)
Htg
(cfm)
Clg
(cfm)
TEL
(ft)
Design
FR
Veloc
(fpm)
Diam
(in)
H x W
(in)
Stud/Joist
Opening (in)
Duct
Mat
Trunk
rbi
Ox 0
1167
1167
0
0
0
0
Ox 0
VIFx
-�- wrightsoft®
Right-Sute®Uriversal 2021 21.0.02 RSU23828
terstone1820DGR\Lot122BIk5Waterstone1820DGR.np Calc=MJB Front Door faces: NW
2021-Mar-09 09:05:48
Page 2
2020 - AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
TABLE 402.4.1.1
AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA
Project Name: Lot 122 Block 5 Waterstone 1820 DGR Builder Name: ADAMS HOMES
Street: 5350 San Benedetto Place Permit Office:
City, State, Zip: Fort Pierce , FL , 34951 Permit Number:
Y
Owner: Jurisdiction: 661000
w
Design Location: FL, ST_LUCIE_CO_INTL
U
COMPONENT
AIR BARRIER CRITERIA
INSULATION INSTALLATION CRITERIA
General
A continuous air barrier shall be installed in the building envelope.
Air -permeable insulation shall
requirements
The exterior thermal envelope contains a continuous air barrier.
not be used as a sealing material.
Breaks or joints in the air barrier shall be sealed.
Ceiling/attic
The air barrier in any dropped ceiling/soffit shall be aligned with
The insulation in any dropped ceiling/soffit
the insulation and any gaps in the air barrier shall be sealed.
shall be aligned with the air barrier.
Access openings, drop down stairs or knee wall doors to
unconditioned attic spaces shall be sealed.
Walls
The junction of the foundation and sill plate shall be sealed.
Cavities within corners and headers of frame walls
The junction of the top plate and the top of exterior walls shall be
shall be insulated by completely filling the cavity
sealed.
with a material having a thermal resistance of R-3
Knee walls shall be sealed.
per inch minimum..
Exterior thermal envelope insulation for framed
walls shall be installed in substantial contact and
continuous alignment with the air barrier.
Windows, skylights
The space between window/doorjambs and framing, and
and doors
skylights and framing shall be sealed.
Rim joists
Rim joists shall include the air barrier.
Rim joists shall be insulated.
Floors
The air barrier shall be installed at any exposed edge of
Floor framing cavity insulation shall be installed to
(including
insulation.
maintain permanent contact with the underside of
above -garage
subfloor decking, or floor framing cavity insulation
and cantilevered
shall be permitted to be in contact with the top side
floors)
of sheathing, or continuous insulation installed on
the underside of floor framing and extends from the
bottom to the top of all perimeter floor framing
members.
Crawl space walls
Exposed earth in unvented crawl spaces shall be covered with
Where provided instead of floor insulation, insulation
a Class I vapor retarder with overlapping joints taped.
shall be permanently attached to the crawlspace walls.
Shafts, penetrations
Duct shafts, utility penetrations, and flue shafts opening to
exterior or unconditioned space shall be sealed.
Batts in narrow cavities shall be cut to fit, or narrow
Narrow cavities
cavities shall be filled by insulation that on
installation readily conforms to the available cavity
spaces.
Garage separation
Air sealing shall be provided between the garage and conditioned spac
as.
Recessed lighting
Recessed light fixtures installed in the building thermal envelope
Recessed light fixtures installed in the building
shall be sealed to the finished surface.
thermal envelope shall be air tight and IC rated.
Plumbing and wiring
Batt insulation shall be cut neatly to fit around, wiring
and plumbing in exterior walls, or insulation that on
installation readily conforms to available space shall
Pytt-nd behind pupwria and wiring,
Shower/tub
The air barrier installed at exterior walls adjacent to showers and
Exterior walls adjacent to showers and tubs shall
on exterior wall
tubs shall separate them from the showers and tubs.
be insulated.
Electrical/phone box or
The air barrier shall be installed behind electrical or communication
exterior walls
boxes or air -sealed boxes shall be installed.
HVAC register boots
HVAC supply and return register boots that penetrate building
thermal envelope shall be sealed to the sub -floor, wall covering or
Concealed
When required to be sealed, concealed fire sprinklers shall only be
sprinklers
sealed in a manner that is recommended by the manufacturer.
Caulking or other adhesive sealants shall not be used to fill voids
u. u 11OP 1-1 uI luy wcuo anon uc in du;uiudnce wigs Me provisions or iuu-4uu.
3/9/2021 9:17 AM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1
FORM R405-2020
RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST
Florida Department of Business and Professional Regulation
Simulated Performance Alternative (Performance) Method
Applications for compliance with the 2020 Florida Building Code, Energy Conservation via the
Residential Simulated Performance Alternative shall include:
❑ This checklist
❑ Form R405-2020 report
❑ Input summary checklist that can be used for field verification (usually four pages/may be greater)
❑ Energy Performance Level (EPL) Display Card (one page)
❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7
❑ Mandatory Requirements (five pages)
Required prior to CO:
❑ Air Barrier and Insulation Inspection Component Criteria checklist (Table R402.4.1.1 - one page)
❑ A completed 2020 Envelope Leakage Test Report (usually one page); exception in R402.4
allows dwelling units of R-2 Occupancies and multiple attached single family dwellings to
comply with Section C402.5
❑ If Form R405 duct leakage type indicates anything other than "default leakage", then a completed
2020 Duct Leakage Test Report - Performance Method (usually one page)
3/9/2021 9:16:14 AM EnergyGauge@ USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1
Envelope Leakage Test Report (Blower Door Test)
Residential Prescriptive, Performance or ERI Method Compliance
2020 Florida Building Code, Energy Conservation, 7th Edition
Jurisdiction: 661000
Permit #:
Job Information'
Builder: ADAMS HOMES Community: Lot: NA
Address: 5350 San Benedetto Place
City: Fort Pierce State: FL Zip: 34951
Air Leakage Test Results "Passing results must meette�ther the Performance; Presciiptrve, or ERI:Mefhod
ro m
PRESCRIPTII/E METHOD The building or dwelling urnt shaft be,tested and venfied as having; an air leakage rate of not, exceeding
changes per`hour at a pressure of0 2•mch w g(50 Pascals) in C[natate Zortes,l and 2
.$� ,f PERFORMANCE,oc,ERl METHOD The buildingore�Ung urot shalt be tested�ar�d �enfied as hawriqan air`�leakage rate of notexceeding`
Fhe�selected ACN(50) value, as shown on For``m R405 U20 (Pe�rformarlcej'or t406 2020,(ERI) section lafaeled as' nfiltration;.=sub,section AGH50.
" _ ' t ACH(50) specified on Form R405 2020 Energy Calc'(Perfo marine) or R406.202,0 (ERI) r.< 7.000
x 60 _ 18200 = Method for calculating building volume:
CFM(50) Building Volume ACH(50)
O Retrieved from architectural plans
F]PASS Code
• software calculated
When ACH(50) is less than 3, Mechanical Ventilation installation O Field measured and calculated
must be verified by building department.
R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals)
Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section
489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration
control measures.
2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control
measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
.Company 1,
esting
1 4
Company Name: Phone.
I hereby verify that the above Air Leakage results are in accordance with the 2020 7th Edition Florida Building Code
Energy Conservation requirements according to the compliance method selected above.
Signature of Tester: Date of Test:
Printed Name of Tester: .
License/Certification #: Issuing Authority:
3/9/2021 9:17:13 AM EnergyGauge@ USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1
Florida Building Code, Energy Conservation, 7th Edition (2020)
Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods
ADDRESS: 5350 San Benedetto Place Permit Number:
Fort Pierce, FL , 34951
MANDATORY REQUIREMENTS - See individual code sections for full details.
IV
SECTION R401 GENERAL
R401.3 Energy Performance Level (EPL) display card (Mandatory)The building official shall require that an energy performance level (EPL)
display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law
❑ (Section 553.9085, Florida Statutes) requires the EPL display card to be included as an addendum to each sales contract for both presold and
nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components
installed in a dwelling unit. The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans
and specifications submitted to demonstrate code compliance for the building. A copy of the EPL display card can be found in Appendix RD.
SECTION R402 BUILDING THERMAL ENVELOPE
❑ R402.4 Air leakage (Mandatory). The building thermal envelope shall be constructed to limit air leakage in, accordance with the requirements of
Sections R402.4.1 through R402.4.5.
Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to
comply with Section C402.5.
❑ R402.4.1 Building thermal envelopeThe building thermal envelope shall comply with Sections R402.4.1.1 and
R402.4.1.2. The sealing methods between dissimilar materials shall allow for differential expansion and contraction.
❑ R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance
with the manufacturer's instructions and the criteria listed in Table R402.4.1.1, as applicable to the method of construction. Where required
by the code official, an approved third party shall inspect all components and verify compliance.
❑ R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air
changes per hour in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Testing shall be conducted in
accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 pascals). Testing shall be conducted by either
individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i) or
an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code
official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope.
Exception: Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existing
buildings in which the new construction is less than 85 percent of the building thermal envelope.
During testing:
1. Exterior windows and doors, fireplace and stove doors shall be closed; but not sealed, beyond the intended weatherstripping or
other infiltration control measures.
2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended
infiltration control measures.
3. Interior doors, if installed at the time of the test, shall be open.
4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed.
5. Heating and cooling systems, if installed at the time of the test, shall be turned off.
6. Supply and return registers, if installed at the time of the test, shall be fully open.
❑ R402.4.2 Fireplaces. New wood -burning fireplaces shall have tight -fitting flue dampers or doors, and outdoor combustion air. Where
using tight -fitting doors on factory -built fireplaces listed and labeled in accordance with UL 127, the doors shall be tested and listed for the
fireplace. Where using tight -fitting doors on masonry fireplaces, the doors shall be listed and labeled in accordance with UL 907.
❑ R402.4.3 Fenestration air leakage. Windows, skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm
per square foot (1.5 Us/m2), and swinging doors no more than 0.5 cfm per square foot (2.6 L/s/m2), when tested according to NFRC 400 or
AAMA/ WDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacturer:
Exception: Site -built windows, skylights and doors.
3/9/2021 9:16 AM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 5
MANDATORY REQUIREMENTS - (Continued)
R402.4.4 Rooms containing fuel -burning appliances. In Climate Zones 3 through 8, where open combustion air ducts provide combustion air to
open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope or
enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirements
of Table R402.1.2, where the walls, floors and ceilings shall meet not less than the basement wall R-value requirement. The door into the room shall be
fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion air duct shall be insulated where it
passes through conditioned space to a minimum of R-8.
Exceptions:
1. Direct vent appliances with both intake and exhaust pipes installed continuous to the outside.
2. Fireplaces and stoves complying with Section R402.4.2 and Section R19,06 of the Florida Building Code, Residential.
R402.4.5 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage
between conditioned and unconditioned spaces. All recessed luminaires shall be IC -rated and labeled as having an air leakage rate not
more than 2.0 cfm (0.944 Us) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa),pressure differential. All recessed
luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering.
R403.1 Controls. SECTION R403 SYSTEMS
R403.1.1 Thermostat provision (Mandatory). At least one thermostat shall be provided for each separate heating and cooling system.
❑ R403.1.3 Heat pump supplementary heat (Mandatory). Heat pumps having supplementary electric -resistance heat shall have controls
that, except during defrost, prevent supplemental heat operation when the heat pump compressor can meet the heating load.
❑ R403.3.2 Sealing (Mandatory) All ducts, air handlers, filter boxes and building cavities that form the' primary air containment passageways
for air distribution systems shall be considered ducts or plenum chambers, shall be constructed and sealed in accordance with Section
C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below.
Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5) or
(7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (1), Florida Statutes, to be "substantially leak free" in
accordance with Section R403.3.3.
R403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent
of the design airflow rate when tested in accordance with ASHRAE 193.
R403.3.3 Duct testing (Mandatory). Ducts shall be pressure tested to determine air leakage by one of the following methods:
1. Rough -in test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the system,
including the manufacturer's air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise
sealed during the test.
2. Postconstruction test: Total leakage shall be measured with a pressure differential of 0.1• inch w.g. (25 Pa) across the entire
system, including the manufacturer's air handler enclosure. Registers shall be taped or otherwise sealed during the test.
Exceptions:
1. A duct air leakage test shall not be required where the ducts and air handlers are located entirely within the building
thermal envelope.
2. Duct testing is not mandatory for buildings complying by Section 405 of this code. Duct leakage testing is required for Section
R405 compliance where credit is taken for leakage, and.a duct air leakage Qn to the outside of less than 0.080 (where Qn =
duct leakage to the outside in cfm per 100 square feet of conditioned floor area tested at 25 Pascals) is indicated in the
compliance report for the proposed design.
A written report of the results of the test shall be signed by the party conducting the test and provided to the code official.
R403.3.5 Building cavities (Mandatory). Building framing cavities shall not be used as ducts or plenums.
R403.4 Mechanical system piping insulation (Mandatory). Mechanical system piping capable of carrying fluids above 105°F (41°C)
or below 55°F (13°C) shall be insulated to a minimum of R-3.
R403.4.1 Protection of piping insulation. Piping insulation exposed to weather shall be protected from damage, including that
caused by sunlight, moisture, equipment maintenance and wind, and shall provide shielding from solar radiation that can cause
degradation of the material. Adhesive tape shall not be permitted.
R403.5.1 Heated water circulation and temperature maintenance systems (Mandatory). If heated water circulation systems are
installed, they shall be in accordance with Section R403.5.1.1. Heat trace temperature maintenance systems shall be in accordance with
Section R403.5.1.2. Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible.
R403.5.1.1 Circulation systems. Heated. water circulation systems shall be provided with a circulation pump. The system return pipe shall
be a dedicated return pipe or a cold water supply pipe. Gravity and thermosiphon circulation systems shall be prohibited. Controls for
circulating hot water system pumps shall start the pump based on the identification of a demand for hot water within the occupancy. The
controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and when there is no
demand for hot water.
.❑ R403.5.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE 515.1 or UL 515. Controls for such, systems shall
automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance with the
times when heated water is used in the occupancy.
3/9/2021 9:16 AM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 2 of 5
MANDATORY REQUIREMENTS - (Continued)
R403.5.5 Heat traps (Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have
heat traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a
downward and upward bend of at least 3 % inches (89 mm) in the hot water distribution line and cold water line located as close as possible
to the storage tank.
R403.5.6 Water heater efficiencies (Mandatory).
R403.5.6.1.1 Automatic controls. Service water -heating systems shall be equipped with automatic temperature controls capable
of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature
setting range shall be from 100°F to 140°F (38°C to 60°C).
R403.5.6.1.2 Shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to
electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main burner(s) of
combustion types of service water -heating systems to be turned off.
❑ R403.5.6.2 Water -heating equipment. Water -heating equipment installed in residential units shall meet the minimum efficiencies of
Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment installed.
Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the appropriate
water -heating category. Solar water heaters shall meet the criteria of Section R403.5.6.2.1.
R403.5.6.2.1 Solar water -heating systems. Solar systems for domestic hot water production are rated by the annual solar energy
factor of the system. The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of
Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, Test Methods for Solar Collectors,
and SRCC Standard TMA, Solar Domestic Hot Water System and Component Test Protocol. Collectors_ in installed solar
water -heating systems should meet the following criteria:
1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal; and
2. Be installed at an orientation within 45 degrees of true south.
R403.6 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that meets the requirements of the
Florida Building Code, Residential, or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation
including: Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or gravity dampers that
close when the ventilation system is not operating.
R403.6.1 Whole -house mechanical ventilation system fan efficacy.When installed to function as a whole -house mechanical
ventilation system, fans shall meet the efficacy requirements of Table R403.6.1.
Exception: Where an air handler that is integral to tested and listed HVAC equipment is used to provide whole -house mechanical
ventilation, the air handler shall be powered by an electronically commutated motor.
R403.6.2 Ventilation air. Residential buildings designed to be operated at a positive indoor pressure or for mechanical ventilation
shall meet the following criteria:
1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation for Acceptable
Indoor Air Quality, shall be the maximum rates allowed for residential applications.
2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics,
crawlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas.
3. If ventilation air is drawn from enclosed space(s), then the walls of the space(s) from which air is drawn shall be
insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R-19, space permitting, or R-10
otherwise.
R403.7 Heating and cooling equipment.
El on
Equipment sizing (Mandatory). Heating and cooling equipment shall be sized in accordance with ACCA Manual S based
on the equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation
methodologies, based on building loads for the directional orientation of the building. The manufacturer and model number of the
outdoor and indoor units (if split system) shall be submitted along with the sensible and total cooling capacities at the design
conditions described in Section R302.1. This Code does not allow designer safety factors, provisions for future expansion or other
factors that affect equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical
ventilation such as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall have
an efficiency rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is
installed.
TABLE R403.6.1
WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY
FAN LOCATION
AIRFLOW RATE MINIMUM
(CFM)
MINIMUM EFFICACY a
(CFM/WATT)
AIRFLOW RATE MAXIMUIV
(CFM)
HRV or ERV
Any
1.2 cfm/watt
Any
Range hoods
Any
2.8 cfm/watt
Any
In -line fan
Any
2.8 cfm/watt
Any
Bathroom, utility room
10
1.4 cfm/watt
<90
Bathroom, utility room
90
2.8 cfm/watt
Any
For SI: 1 cfm = 28.3 L/min. a. When tested in accordance with HVI Standard 916
3/9/2021 9:16 AM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 3 of 5
MANDATORY REQUIREMENTS - (Continued)
❑ R403.7.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less
than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in
Section R403.7, or the closest available size provided by the manufacturer's product lines. The corresponding latent capacity of the
equipment shall not be less than the calculated latent load.
The published value for AHRI total capacity is a nominal, rating -test value and shall not be used for equipment sizing. Manufacturer's
expanded performance data shall be used to select cooling -only equipment. This selection shall be based on the outdoor design dry-bulb
temperature for the load calculation (or entering water temperature for water -source equipment), the blower CFM provided by the expanded
performance data, the design value for entering wet -bulb temperature and the design value for entering dry-bulb temperature.
Design values for entering wet -bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load
calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space.
Exceptions:
1. Attached single- and multiple -family residential equipment sizing may be selected so that its cooling capacity is less than the
2. calculated total sensible load but not less than 80 percent of that load.
When signed and sealed by a Florida -registered engineer, in attached single- and multiple -family units, the capacity of
equipment may be sized in accordance with good design practice.
R403.7.1.2 Heating equipment capacity.
❑ R403.7.1.2.1 Heat pumps. Heat pump sizing shall be based on the cooling requirements as calculated according to Section
R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if
the design heating load is 1.15 times greater than the design cooling load.
❑ R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design
requirements calculated according to the procedure selected in Section R403.7.1.
❑ R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners
shall not be less than the design load calculated in accordance with Section R403.7.1.
❑ R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an
intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to
prevent continuous space cooling or heating within that space by one or more of the following options:
1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas.
2. A variable capacity system sized for optimum performance during base load periods is utilized.
R403.8 Systems serving multiple dwelling units (Mandatory). Systems serving multiple dwelling units shall comply with Sections
❑ C403 and C404 of the Florida Building Code, Energy Conservation —Commercial Provisions in lieu of Section R403.
❑ R403.9 Snow melt and ice system controls (Mandatory) Snow- and ice -melting systems, supplied through energy service to the building,
shall include automatic controls capable of shutting off the system when the pavement temperature is above 50°F (10°C), and no
precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40°F (4.8°C).
R403.10 Pools and permanent spa energy consumption (Mandatory). The energy consumption of pools and permanent spas
❑
shall be in accordance with Sections R403.10.1 through R403.10.5.
R403.10.1 Heaters. The electric power to heaters shall be controlled by a readily accessible on -off switch that is an
integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 mm) of the heater. Operation
of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the
power to the heater. Gas -fired heaters shall not be equipped with continuously burning ignition pilots.
❑ R403.10.2 Time switches. Time switches or other control methods that can automatically turn off and on according to a preset schedule
shall be installed for heaters and pump motors. Heaters and pump motors that have built-in time switches shall be in compliance with this
section.
Exceptions:
1. Where public health standards require 24-hour pump operation.
2. Pumps that operate solar- and waste -heat -recovery pool heating systems.
3. Where pumps are powered exclusively from on -site renewable generation.
3/9/2021 9:16 AM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 4 of 5
R403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor -retardant cover on or at
u the water surface or a liquid cover or other means proven to reduce heat loss.
Exception: Where more than 70 percent of the energy for heating, computed over an operation season, is from site -recovered
energy, such as from a heat pump or solar energy source, covers or other vapor -retardant means shall not be required.
❑ R403.10.4 Gas- and oil -fired pool and spa heaters. All, gas- and oil -fired pool and spa heaters shall have a minimum thermal
efficiency of 82 percent for heaters manufactured on or after April 16, 2013, when tested in accordance with ANSI Z 21.56. Pool
heaters fired by natural or LP gas shall not have continuously burning pilot lights.
R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance
with AHRI 1160, Table 2, Standard Rating Conditions -Low Air Temperature. A test report from an independent laboratory is
required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard.
R403.11 Portable spas (Mandatory).The energy consumption of electric -powered portable spas shall be controlled by the
requirements of APSP-14.
R403.13 Dehumidifiers (Mandatory If installed, a dehumidifier shall conform to the following requirements:
1. The minimum rated efficiency of the dehumidifier shall be greater than 1.7 liters/ kWh if the total dehumidifier capacity for the house
is less than 75 pints/day and greater than 2.38 liters/kWh if the total dehumidifier capacity for the house is greater than or equal to 75 pints/day.
2. The dehumidifier shall be controlled by a sensor that is installed in a location where it is exposed to mixed house air.
3. Any dehumidifier unit located in unconditioned space that treats air from conditioned space shall be insulated to a minimum of R-2.
4. Condensate disposal shall be in accordance with Section M1411.3.1 of the Florida Building Code, Residential.
R403.13.1 Ducted dehumidifiers. Ducted dehumidifiers shall, in addition to conforming to the requirements of Section R403.13,
conform to the following requirements:
1. If a ducted dehumidifier is configured with return and supply ducts both connected into the supply side of the cooling system, a backdraft
damper shall be installed in the supply air duct between the dehumidifier inlet and outlet duct.
2. If a ducted dehumidifier is configured with only its -supply duct connected into the supply side of the central heating and coolirig system,
a backdraft damper shall be installed in the dehumidifier supply duct between the dehumidifier and central supply duct.
3. A ducted dehumidifier shall not be ducted to or from a central ducted cooling system on the return duct side upstream from the
central cooling evaporator coil.
4. Ductwork associated with a dehumidifier located in unconditioned space shall be insulated to a minimum of R-6.
SECTION R404
ELECTRICAL POWER AND LIGHTING SYSTEMS
F1 R404.1 Lighting equipment (Mandatory). Not less than 90 percent of the lamps in permanently installed luminaires shall have an
efficacy of at least 45 lumens -per -watt or shall utilize lamps with an efficacy of not less than 65 lumens -per -watt.
R404.1.1 Lighting equipment (Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights.
3/9/2021 9:16 AM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 5 of 5