Loading...
HomeMy WebLinkAboutTruss51 r a k *PLEASE, VERIFY* *VERIFY ROOF PEAK LOCATION *VERIFY DORMER DIMENSIONS *ROOF PLANES VARY SLIGHTLY FROM PLANS *VERIFY TRUSS LOADING BREAKDOWN (TOLL, TCDL, BCLL, BCDQ 70' 14'4" 30'8" 14'4" 11'4" 7' 11 '4, 701 7 $� w nv i. urtvrr w FOR 0 TLOOKERS 13'6" 12'6"- I L— * NOTE: ALL TRUSS TO WALL AND/OR TRUSS TO LEDGER CONNECTIONS BY BUILDER. c o z (UNLESS NOTED OTHERWISE) H ° 'N H a E .R w ; * NOTE: ALL CEILING DROPS BELOW BEAM ARE BY BUILDER. (UNLESS NOTED OTHERWISE) 2 H o ° h O Ey y y * NOTE: THIS TRUSS PLACEMENT DIAGRAM IS TO SHOW w O. ` o w TRUSS I.D. AND TRUSS LOCATION ONLY. THE BUILDING ° _ ' _ E E ~ o DESIGNER IS RESPONSIBLE FOR THE STRUCTURAL N ? a $ 2 a STABILITY OF THE ENTIRE STRUCTURE. REFER TO THE = L m 8 a o o y m INDIVIDUAL TRUSS ENGINEERING DRAWINGS FOR ~ E _ GRAVITY AND UPLIFT LOADS. W 4E m 2 c C oc o FOR BRACING &ERECTION DETAILS REFER TO BCSI-03 o t o v y at., o AND/OR ENGINEER OF RECORD. CL C " °_! ' d 8 s aEv 2 mj•�'� T v W t y C °=_ �. a R a p -oO v ° REPRESENTS THE LEFT SIDE a) t H o,� o = OF EACH TRUSS DRAWING a r ( NOTE: REFER TO SIMPSON CONNECTOR .8 y 2 ; R 6,2 a E Ez'y O 2wF �-o REVIEWED FOR CODE COMPLIANCE ST. LUCIE COUNTY BOCC FILE COPY d CATALOG FOR INSTALLATION DETAILS) c = 0, A LUS24 H HHUS46 ` Q--- s R •� aio a m 5= y E B LUS26 J THA422 R--- 00 i; uo N v ° 9 N H C HUS26 K MUS26 S--- 7) 'EO N .0= G CU; w mMO 2 CJ me '� D HUS28 L THJA26 T -- uyidvw Co 3 'N r o D E a E HHUS26-2 M HGUS28-2 U - - - ci ° c C60 c as '7 � aNy F HHUS28-2 N MUS28 V - - - ya 8°G 'mR� _,°ENv 0N p00 EG LUS46 P -- X --- 2 HBB HANGER BY BUILDER BBB BEAM BY BUILDER 8 2 O': ,°c.9'i °aa� CC.--L =. LSTA12 @ TC & BC * NOTE: LSTA STRAP N._Q.O ; 6 o INDICATED TORE USED IN m m a z E c 1 Zt LSTA12 @ TC CONCORDANCE WITH B w 2 s 6 .21 Zb LSTA12 @ BC m CORNERSET DETAIL. w N o r o r s y 0 0-- 0' y 2D 8 LOADING ROOF FLOOR WIND LOAD a LIVE LOAD 20 ASCE 7-1i H o 0 8 m 0:�c-.-c5mo� 00 ~ U DEAD LOAD 15 - 160 C ',c O 2 �.rn N o a 3 rn °. p* W a, 0. W (6 a 1=0 0 w :Fi 2 'oo 1,m - E0 M DEAD LOAD 10 - Closed =a) m1D g ; r TOTAL LOAD 45 - FBC 7th Ed. 2020 Res. o -6 �j c N' w0 'O N '.-°'2 m c o cE. Z DURATION FACTOR 1.25 TPI 2014 w s in 8 c 6 v o v y, �. CO N.'E R n REV DATE BY REMARKS R 1 S -a O _dE2m'E.4.c 8 z" * 1 6/16/21 BS REVISED OVERHANGS Z 2= d 0 ;`, N> R p R y p2 41 at.. g.. c. 3 Y t m c 25 `m o (D 0 y N N - G N t7i =0 w o.�0N«d..E°c �_ s ry Q O p C - T. a ❑ rn._ R Hc2d�'c-rn�R.'oc • h�p• c c _ C It is understood that above APPROVED 7 E 46 (/i m 8 d a conditions have been reviewed & L moo ° °'t - w w are acceptable for the fabrication APPROVED AS NOTED L at trusses, elevations,pitches, overhangs, fascias,ceiling REVISE AND RESUBMIT H e .0 =o 9 0 0 0 elevations/pitches, bearing m ; me2 aw'E e8 conditions &all detail pertaining ❑REJECTED I = N o.= 8 s a to this truss placement plan. No of '5 o OP c 2 ', a 42 ; ° CM back charges will be accepted Y N y0,. =ac w 2 ° a ° o V without previous written approval DATE o ° ; y 9 o N from an A-1 Roof Trusses O y d R R '82 R 0 E E' S o a o` 0" representative. REVIEWED BY 8 •o 2 d f cm- ;" 46 o m {a N Vi C 0 PLAN DATE ARCH: --/--/---- STRUCT /--/--- ; d R = — r = o m m0 ate: )0W ofR A' at..2 C'T -N N'� ft, CUSTOMER TREFELNER CONSTRUCTION ; y � � y aci E S 'c JOB NAME LANGEL RESIDENCE o 3 0 c c c o co. ov'O R c C ya 0M C R° N 0y a,:L.- � c� 3 y E w a _'-W CM % W m.o. C C.Qt.- OPTION(S) ,- .0 H Wa me 8 wo M 0.5 ,a 0 tll OS 2 C E gm a Of � :Fvo Meat COMMUNITY o'D c Z= 8 o r /LOT# NoBAMOHo@ y H 5 2 w y R c. �. c I_ g d CITY ap'216="°yd3 U.O.t N y N 0 h w 0 COUNTY ST. LUCIE ° D CCW Z CO c pn y m m m y a 3 BLDG. BLDG. ,°a = Q a C_R@�9_ O of TYPE # aE d R 5 ma m (D 2 10d d JOB # 85072 MASTER T e y o y m c d `m DRAWN SCALE .mc.R.mi.E=A'v -5 S o N E y W DATE 4120/21 C� C- a)c o a m 0 e' 3 9° BS NTS = ' z _ ^ a� aNC.N yt.O 22y.. N° z E> a 3 v° v50 Z E o� 8 uRa �" w o a m c m 2 'E Jz CO 2a Rom. i0a d„= W ,� O L g�zo 8'O. �20� N N V 0-0 d pR. . Q N � Rco�Fbm W a 0'O .S 0 1 RE: Job 85072 Lumber design values are in accordance with ANSI/TPI 1-2014 section 6.3 These truss designs rely on lumber values established by others. A-1 Roof Trusses 4451 St Lucie Blvd Site Information: Fort Pierce, FL 34946 Customer Info: TREFELNER CONSTRUCTION Project Name: LANGEL RESIDENCE Lot/Block: Model: Address: 10610 PINE NEEDLE DR., ST. LUCIE, FL. Subdivision: City: County: St Lucie State: FL Name Address and License # of Structural Engineer of Record, If there is one, for the building. Name: License #: Address: City: General Truss Engineering Criteria Design Loads (Individual Truss Design Drawings Show Special Loading Conditions): Design Code: FBC 7th Ed, 2020 Res. / TPI 2014 Design Program: Alpine Engineered Products Wind Code: ASCE 7-16 Wind Speed: 160 Roof Load: 45.0 psf Floor Load: 0.0 psf This package includes 54 individual, dated Truss Design Drawings and 16 Additional Drawings. With my seal affixed to this sheet, I hereby certify that I am the Truss Design Engineer and this index sheet conforms to 61 G15-31.003,section 5 of the Florida Board of Professional Engineers Rules. No. Seq # Truss Name Date No. Seq # Truss Name Date No. Seq # Truss Name Date 1 2573 A01 G 6/16/21 13 2537 A13 6/16121 25 2522 B07 6/16/21 2 2472 A02 6/16/21 14 2513 A14 6/16/21 26 2513 BOBG 6/16/21 3 2476 A03 6116/21 15 2528 A15 6/16/21 27 2588 C01GE 6116/21 4 2480 A04 6/16/21 16 2594 A16G 6116121 28 2591 CO2GE 6/16/21 5 2487 A05 6/16/21 17 2606 A17 6/16121 29 2580 CO3 6/16/21 6 2491 A06 6/16/21 18 2593 A18GE 6/16/21 30 2583 C04 6/16/21 7 2491 A07 6/16/21 19 2585 B01GE 6/16/21 31 2586 C05 6/16/21 8 12531 A08 6/16/21 1 20 12537 B02 6/16/21 1 32 12567 C06GE 6/16/21 9 2729 A09 6/16/21 21 2543 B03 6/16/21 33 2597 D01 6/16/21 10 2499 A10 6/16/21 22 2576 B04G 6/16/21 34 2886 D02 6/16/21 11 2503 1 Al 6/16/21 23 2582 B05G 6/16/21 35 2649 E01 6116121 12 2534 1 Al2 6/16/21 24 2525 1 B06 6/16 136 2495 1 HJ7 6/16/21 rhetruss drawings) referenced have been prepared byAlpine Engineered Products, Inc. undermydireci supervision used onthe parameters provided byAr1 Hoot I nrsses, Lri1 Truss Design Engineer's Name: Manuel Martinez My license renewal date for the state of Florida is February 28,2023. NOTE: The seal on these drawings indicate acceptance of professional engineering responsibirdy solely forthe truss components shown. Thesullabil ty and use ofconponerds forany particularbugding Isthe responsibility ofthe budding r�, igner, perANSVrP41 Sec. 2. roiTruss Design Drawing(s)(TDD[s]) referenced have been prepared based on the construction 0cuments (also referred to attimes as'Structural Engineering Documents) provided bythe Building Desgnerindkidi ng the nature and characterofthe work. j9ne design criteria therein have been transferred to Manuel Martinez PE by [Al Roof Trusses orspecific location]. These TDDs (also referred to attimes as'Structural Delegated' Engineering Documents') wespecialty structural component designs and may be pad ofthe projects deferred orphased submittals. As a Truss Design Engineer(Le, specialty Engiteer),the seal here and on the TDD represents an acceptance of professional engineering responsibillLy forthe design of the single Truss depicted on the TDD only. The Building Designer is responsible for and shag coordinate and review the TDDs for compatibility with the'vwritten engineering requirements. Please review ad TDDs and all related notes. Manuel 11,Digitaill signed by t,•• n, Marti nez �OQb'4�0' =9•. STATE OF S4ONA11 11;���� smuao SE MFB3 I812BC701052B64EACE5CA Manuel Martinez, P.E. 4620 ParkView Dr: SL Cbud, FL 34771 Page 1 of 2 RE: Job 85072 No. Seq # Truss Name Date 37 2466 J1 6116/21 38 2537 J11 6/16121 39 2543 J11A 6/16/21 40 2484 J2 6/16/21 41 2469 J3 6/16/21 42 2487 J4 6116/21 43 2472 J5 6/16/21 44 12490 J6 6/16/21 45 2525 J7 6/16/21 46 2498 J7A 6/16/21 47 2504 J7B 6/16/21 48 2540 J7C 6/16/21 49 12522 J8 6/16/21 50 2534 J8A 6/16/21 51 2516 PB01 6/16/21 52 2519 PB02 6/16/21 53 2529 V03 6/16/21 54 2526 V07 6/16/21 55 STDL01 STD. DETAIL 6/16/21 56 STDL02 STD. DETAIL 6/16/21 57 STDL03 STD. DETAIL 6/16/21 , 58 STDL04 STD. DETAIL 6116/21 59 STDL05 STD. DETAIL 6/16/21 60 STDL06 STD. DETAIL 6/16/21 61 STDL07 STD. DETAIL 6/16/21 62 STDL08 STD. DETAIL 6/16/21 63 STDL09 STD. DETAIL 6/16/21 64 STDL10 STD. DETAIL 6/16/21 65 STDL11 STD. DETAIL 6116/21 66 STDL12 STD. DETAIL 6/16/21 67 STDL13 STD. DETAIL 6/16/21 68 STDL14 STD. DETAIL 6/16/21 69 STDL15 STD. DETAIL 6/16/21 70 STDL16 STD. DETAIL '6/16/21 Lumber design values are in accordance with ANSI/TPI 1-2014 section 6.3 These truss designs rely on lumber values established by others. Page 2 of 2 Manuel Martinez, P.E. # 047182 4620 ParkView Dr St Cloud, FL 34771 Job: Truss Truss Type Qty Ply 06/16/2021 85072 A01G GABL 1 2 �® Seal #: 2573 1658 165/ ,55. a5� 165t 165f 1650 119'10-� 165a i 'an ♦ ' i 1 155� ,55.+ I^YN -9ge i9" 74' } 77 =i -5X6 to J K L MN 12 11.5X4 F G AF P E 4Xa0(R) 14X6(CRSS)(R) A� AT 3X3 W17 .y 83X10 X w v u T aun,,.s vBXB -5X6 mW �6X6 �6" 1'9N0 �yL_ y1 �1y�, �ly� yy f^�.- 2' .; r �42Y z�--z}--�?�i-'r�"" 1429 7� 1421' 2 ?42Y 3060 3061 306. 142! 4 142/ 1420 1420 1420 ling Criteria (psf) Wind Criteria L: 20.00 Wind Std: ASCE 7-16 L: 15.00 Speed: 160 mph L: 0.00 Enclosure: Closed L: 10.00 Risk Category: 11 EXP: C Kzt: NA Ld: 45.00 Mean Height 25.00 ft CLL: 0.00 TCDL: 5.0 psf t 0.00 BCDL: 5.0 psf I Duration: 1.25 MWFRS Parallel Dist 0 to h/2 :ing: 24.0 " C&C Dist a: 3.36 ft Loc. from endwall: not in 5.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x6 SP 2400f-2.0E; Webs: 2x4 SP #3; W1,W17 2x8 SP 240of-1.8E; W2, W11,W14,W15 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Natlnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @11.25" D.C. Bot Chord: 1 Row @12.00" o.c. Webs : 1 Row @ 4" D.C. Use equal spacing between rows and stagger nails in each row to avoid splitting. (1)1/2" bolts may be used for (2) 0.131"x3", min. nails on The Bottom Chord Only. Plating Notes All plates are 1.5X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 0.00 9.79 TC 24 19.08 26.42 BC 116 0.00 33.58 Apply pudins to any chords above or below fillers at 24" OC unless shown otherwise above. Hangers / Ties (J) Hanger Support Required, by others Snow Criteria (Pg,Pf in PSF) DeflICSI Criteria Pg: NA Ct: NA CAT. NA PP Deflection in loc Udefl U# Pf. NA Ce: NA VERT(LL): -0.163 O 999 360 Lu: NA Cs: NA VERT(CL): 0.305 O 999 240 Snow Duration: NA HORZ(LL): 0.072 O - - HORZ(TL): 0.136 O - - Building Code: Creep Factor. 2.0 FBC 7th Ed. 2020 Res. Max TC CSI: 0.785 TPI Std: 2014 Max BC CSI: 0.991 Rep Fac: Varies by Ld Case Max Web CSI: 0.968 FT/RT:10(0)/10(10) Weight: 753.2 lbs Plate Type(s): VIEW Ver. 21.01.01A.0521.20 1I1rA110 Loading Truss designed to support 1-0-0 top chord outlookers and cladding load not to exceed 8.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads and reactions based on MWFRS. Left end vertical exposed to wind pressure. Deflection meets U360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See Al Std Detail for gable wind bracing and other requirements. ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL Y 5111 A A A /3379 1211 S 5327 /- /- A /3417 /- Wind reactions based on MWFRS Y Brg Width = - Min Req = - S Brg Width = - Min Req = - Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 1428 -2028 I - J 906 -1393 B - C 1428 -2028 J - K 906 -1393 C - D 2043 - 3095 K - L 906 -1393 D - E 1779 -2629 L - M 906 -1394 E - F 1766 -2580 M - N 919 -1380 F - G 1759 -2520 N - O 987 -1533 G - H 1774 -2629 O - P 1020 -1604 H - I 1766 -2597 P - Q 1051 -1669 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. Y- X 0 -53 V- U 2286 -1476 X - W 3035 -2028 U - T 4286 -1476 W - V 3035 -2028 T - S 80 - 50 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A-Y 1613 -2476 AI -AK 288 -489 A - X 3090 - 2094 AJ-AK 548 - 796 B - X 88 - 389 AL AM 201 -259 X - C 985 -1652 AL- T 739 -1203 C - V 302 -427 AM -AN 201 -259 D-Z 291 -466 AN -AO 201 -259 Z -AA 291 -491 T -AS 2170 -1457 AA -AB 292 -492 AO-T 193 -218 G -AB 40 - 299 AO- M 154 -176 V -AD 1549 -1226 AO -AP 197 - 252 AB- V 143 -439 AP-AQ 198 -253 AB -AC 287 -483 AQ-AR 200 -255 AC -AD 287 -482 AR -AS 200 -249 AE-AF 1579 -1246 AT- R 274 - 379 AE-AG 287 -490 AT- Q 2377, -1579 AF-1 1597 -1230 R - Q 1653 -2609 AG -AI 288 -489 R - S 1654 -2609 1-AH 504 -708 Maximum Gable Forces Per Ply (Ibs) Gables Tens.Comp. Gables Tens. Comp. "WARNING' Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the MD, only Alpine connector plates shag be used for the Too to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any Too represents an acceptance of the professional engineerin Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, underTPI.1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use ofthe Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specially Engineer is NOT the St Cloud, FL 34771 Budding Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses -Reproduction of this document, in any form, Is prohibtted without the written permission of A-1 Roof Trusses. Truss Truss Type A01 G I GABL Qiy Ply 1 2 Seal #: 2673 rl E-Z 5 -64 F-AA 17 -18 H -AC 0 -29 AF-AG 19 -14 AH-J 39 -156 AI-AJ 11 -49 K AM 12 -191 L-AN 54 -32 AP- N 166 -119 AQ- O 41 -4�, AR- P 24 -64 "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER"), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER'1 ACKNOWLEDGMENT" form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional angineefinj Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building Is the responsibility of the Owner, the Owner's authorized agent or the Building Designer, In the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field # 047182 use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. TheSpecialtyEngineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 0 2016 A-1 Roof Tmsses— Repmduclion of this document. in any form, is prohibited without the written pennission of A-1 Roof Tmsses. Job: Truss Truss Type Qty Ply 06/16/2021 85072 A02 COMN 1 1 Seal #: 2472 T3"11 - 11'9"5 A T4" T2" S5DX8 97XB 12 1111O.5X4 C 6 � T2 F 1114X4(R) (a) (a) �5X6 �7X6 B (a) (a' T y1B (a) n (a) (a) i1N 1 M 61 L K J I H 6G 103X6 =5X6 =3X6 =4XB =H0308 E4X8 3T7" Loading Criteria (psi) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-16 Pg: NA Ct: NA CAT: NA PP Deflection in loc L/defi L/# Gravity Non -Gravity TCDL: 15.00 Speed: 160 mph Pf. NA Ce: NA VERT(LL): -0.085 C 999 360 Loc R+ / R- / Rh / Rw 11.1 / RL M 1571 A A /953 1802 /240 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): 0.185 C 999 240 BCDL: 10.00 Risk Category: 11 Snow Duration: NA HORZ(LL): -0.028 A - - G 1613 /- /- /908 /854 /- Des Ld: 45.00 EXP. C Kzt: NA HORZ(TL): 0.058 A - - Wind reactions based on MWFRS BuildingC ode: NCBCLL: 10.00 Mean Height 25.00 ft Creep Factor. 2.D M Br Width = - 9 Min Re q = - Soffit 0.00 TCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.869 G Brg Width = - Min Req = - Load Duration: 1.25 BCDL: 5.0 psf MWFRS Parallel Dist 0 to h/2 TPI Std: 2014 Max BC CSI: 0.967 Maximum Top Chord Forces Per Ply (Ibs) Spacing: 24.0 " C&C Dist a: 3.36 ft Rep Fac: Yes Max Web CSI: 0.877 Chords Tens.Comp. Chords Tens. Comp. A - B 1240 -1898 D - E 846 - 906 Loc. from endwall: not in 9.00 ft FT/RT:10(0)/10(10) Weight: 235.2 Ibs GCp): 0.18 Plate Type(s): B - C 1150 -1842 E - F 780 -1096 VIEW Ver: 21.01.01A.0521.20 Wind Duration: 1.60 WAVE HS C - D 1332 -1773 Lumber Top chord: 2x4 SP M-30; T2,T3 2x4 SP #2; Maximum Bot Chord Forces Per Ply (Ibs) Bot chord: 2x4 :SP 2400f-2.DE + SP M-31:; Chords Tens.Comp. Chords Tens. Comp. M - L 182 -240 J -1 1217 -831 B1 2x4 SP #2; Webs: 2x4 SP #3; W6 2x4 SP #2; L - K 1966 -1439 I - H 1217 - 831 Bracing K- J 1966 -1439 H- G 0 0 (a) Continuous lateral restraint equally spaced on member. Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. Puriins A-M 1142 -1514 J-D 977 -619 In lieu of structural panels or rigid ceiling use purlins A - L 2302 -1503 D - H 458 -591 to laterally brace chords as follows: L - B 938 -1145 H - E 347 -170 Chord Spacing(in oc) Start(ft) End(ft) B - J 508 -515 H - F 1265 -822 TC 24 0.00 7.31 TC 24 19.08 26.42 C - J 499 - 454 F - G 1065 -1521 BC 65 0.00 33.58 Apply purins to any chords above or below fillers at 24" OC unless shown otherwise above. Hangers / Ties (J) Hanger Support Required, by others Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. "WARNING— Please thoroughly review the "A-1 ROOF TRUSSES ('SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (Too) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine Design Engineering Specialty Engineer), the TDD the Manuel Martinez, P.E. connector plates shag be used for the TDD to be valid. As a Truss (i.e. seal on any represents an acceptance of professional engineerin responsibility for the design of the single Truss depicted on the TDD only, underTPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building Is the # 047182 responsibility ofthe Owner, the Owner's authorized agent or the Building Designer, in the content ofthe IRC, the IBC, local building code and TPIA. The approval of the TDD and any field use ofthe Truss, including handling, storage, installation and bracing shall be the responsibility ofthe Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPIA. Copyright 02016 A-1 Roof Trusses —Reproduction of this document, In any form, Is prohibited without the written permission of A-1 Roof Trusses, Job: Truss Truss Type Qty rillTsoceal 6/16/2021 + 85072 A03 COMN 1 #: 2476 47.11 0 T F 91 14'5"5 33'7 Loading Criteria (pst) Wind Criteria Snow Criteria (Pg,Pf in PSF) TCLL: 20.00 Wind Std: ASCE 7-16 Pg: NA Ct: NA CAT: NA TCDL: 15.00 Speed: 160 mph Pf: NA Ce: NA BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA BCDL: 10.00 Risk Category: If Snow Duration: NA EXP: C Kzt: NA Ld: 45.00 Des Ld:: Des Mean Height: 25.00 ft .00 TCDL: 5.0 psf Building Code: Soffit: 0.00 BCDL: 5.0 psf FBC 7th Ed. 2020 Res. Load Duration: 1.25 MWFRS Parallel Dist: h/2 to h TPI Std: 2014 Spacing: 24.0 " C&C Dist a: 3.36 ft Rep Fac: Yes Loc. from endwaif: not in 9.00 ft FT/RT:10(0)/10(10) GCpi: 0.18 Plate Type(s): Wind Duration: 1.60 IWAVE Lumber Top chord: 2x4 SP #2; T5 2x4 SP M-30; Bot chord: 2x4 SP #2; B1 2x4 SP M-30; Webs: 2x4 SP #3; W7 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use puffins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 0.00 4.64 TC 24 19.08 26.42 BC 82 0.00 33.58 Apply puffins to any chords above or below fillers at 24" OC unless shown otherwise above. Hangers / Ties (J) Hanger Support Required, by others Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. T4' 7 2" %7X6(R) #/5X6(R) E F t t S, I Defl/CSI Criteria ♦ Maximum Reactions (Ibs) PP Deflection in loc Udefl U# Gravity Non -Gravity VERT(LL): 0.070 M 999 360 Loc R+ / R- / Rh / Rw / U / RL VERT(CL): 0.164 M 999 240 N 1571 /- /- /995 /532 /298 HORZ(LL): 0.027 1 - - H 1615 /- /- 1910 /593 A HORZ(TL): 0.064 1 - - Wind reactions based on MWFRS Creep Factor. 2.0 N Brg Width = - Min Req = - Max TC CSI: 0.769 H Brg Width = - Min Req = - Max BC CSI: 0.967 Maximum Top Chord Forces Per Ply (Ibs) Max Web CSI: 0.843 Chords Tens.Comp. Chords Tens. Comp. Weight: 231.0 Ibs A - B 2 -29 D - E 1057 -1514 B - C 1204 -2139 E - F 838 - 889 VIEW Ver. 21.01.01A.0521.20 C - D 1021 -1532 F - G 773 -1082 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. N - M 1798 -1374 K - J 1266 - 821 M - L 1827 -1184 J -1 1266 -821 L-K 1827 -1184 1-H 0 0 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A - N 198 -144 E - K 712 -248 N - B 1433 - 2223 E - I 455 - 676 B-M 218 0 1-F 326 -142 M-C 374 0 I-G 1241 -811 C - K 490 -752 G - H 1058 -1513 -WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER"), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT' torn. Verify design parameters and read notes on this Truss Design Drawing (Too) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. Asa Truss Design Engineering [i.e. Specialty Engineer), the seal on any Too represents an acceptance ofthe professional engineering Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # U47182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terns areas defined in TPI-1. Copyright 02010 A-1 Roof Trusses- Reproduction of this document In any font Is prohibited without the written pemdssion of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 85072 A04 COMN 1 1 Seal #: 2480 �E 1 1-- 37 T4" T2" =i 05X8 /B5X6(R) E F =4X8 =3X4 =3X6 =3X4 a3X6 =08 ling Criteria (psf) Wind Criteria 20.00 Wind Std: ASCE 7-16 L: 15.00 Speed: 160 mph L: 0.00 Enclosure: Closed L: 10.00 Risk Category: li EXP: C Kzt: NA Ld: 45.00 Mean Height 25.00 it CLL: 10.00 TCDL: 5.0 psf t 0.00 BCDL: 5.0 psf I Duration: 1.25 MWFRS Parallel Dist: h/2 to h :ing: 24.0 " C&C Dist a: 3.36 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W8 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 19.08 26.42 BC 75 0.00 33.58 Apply purins to any chords above or below fillers at 24" OC unless shown otherwise above. Hangers / Ties (J) Hanger Support Required, by others Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. -,4X4 1 1 337" Snow Criteria (Pg,Pf in PSF) Pg: NA Ct NA CAT. NA Pf. NA Ce: NA Defl/CSI Criteria PP Deflection in loc Udefl U# VERT(LL): 0.072 M 999 360 ♦ Maximum Reactions (Ibs) IGravity Non -Gravity Loc R+ / R- / Rh / Rw / LI / RL O 1552 /- /- /1013 /522 /356 Lu: NA Cs: NA VERT(CL): 0.167 M 999 240 Snow Duration: NA HORZ(LL): 0.026 1 - - H 1601 A /- /911 /599 /- HORZ(TL): 0.060 1 - - Creep Factor. 2.0 Max TC CSI: 1.000 Wind reactions based on MWFRS O Brg Width = - Min Req = - H Brg Width = - Min Req = - Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes Max BC CSI: 0.960 Max Web CSI: 0.859 Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 1013 -1785 D - E 1058 -1509 FT/RT:10(0)/10(10) Weight 231.0 Ibs Plate Type(s): B - C 1184 -2098 E - F 831 - 880 VIEW Ver: 21.01.01A.0521.20 WAVE C - D 1189 -1884 F - G 772 -1071 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. O-N 217 -356 K-J 1249 -816 N - M 1804 -1354 J -1 1249 - 816 M-L 1762 -1170 I-H 0 0 L - K 1762 -1170 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A - O 909 -1535 E - K 746 - 280 A - N 2003 -1108 E - I 443 - 661 N-B 652 -917 I-F 341 -150 B - M 204 -77 I - G 1229 -804 M- D 338 0 G- H 1059 -1497 D - K 506 -740 "WARNING" Please thoroughly review tha"A-1 ROOF TRUSSES("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (rDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine Engineer), TDD of the engineerinE Manuel Martinez, P.E. connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty the seal on any represents an acceptance professional responsibility for the design of the single Truss depicted on the TDD only, underTPI-1. The design assumptions, loading wndifions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the)RC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, Installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses —Reproduction of this dowment, in any form, Is prohibited without the writtenpennission of A•1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 85072 A05 SPEC 1 1 Seal #: 2487 �O_ l­- 3'9' 164' 1 74" i217" SEAT PLATE REQ. i. 13'0"2 ling Criteria (psf) Wind Criteria L: 20.00 Wind Std: ASCE 7-16 L: 15.00 Speed: 160 mph L: 0.00 Enclosure: Closed L: 10.00 Risk Category: II EXP: C Kzt: NA Ld: 45,00 Mean Height: 25.00 ft CLL: 10.00 TCDL: 5.0 psf t: 0.00 BCDL: 5.0 psf I Duration: 1.25 MWFRS Parallel Dist: h/2 to h :ing: 24.0 " C&C Dist a: 4.70 ft Loc. from endwall: not in 13.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top'chord: 2x4 SP #2; T5 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W2,W5,W16 2x4 SP #2; W11 2x4 SP M-30; W17 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 6X8 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 19.08 26.42 BC 54 0.00 13.13 BC 50 12.87 33.52 BC 52 33.27 44.58 BC 36 44.58 47.58 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "WARNING" note below. o5X8 F a i Aw - 12 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): .-3X6(Bt) M SEAT PLATE REQ. - j 2' 20'3"2 lip 11'0"12 i 3' --1 Defl/CSI Criteria PP Deflection in loc Udefl L/# VERT(LQ: 0.295 H 999 360 VERT(CQ: 0.556 H 962 267 HORZ(LL): 0.170 M - - HORZ(TL): 0.348 M - - Creep Factor. 2.0 Max TC CSI: 0.748 Max BC CSI: 0.999 Max Web CSI: 0.997 Weight: 320.6 Ibs VIEW Ver. 21.01.01A.0521.20 Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflection meets U360. Right cantilever is exposed to wind Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL Y 2062 /- A /1695 /1137 /577 M 2371 A A /2399 /1142 A Wind reactions based on MWFRS Y Brg Width = 8.0 Min Req = 2.4 M Brg Width =12.0 Min Req = 2.8 Bearings Y & M are a rigid surface. Bearings Y & M require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 188 -76 G - H 6333 -4627 B - C 4790 -3051 H -1 6228 -4634 C - D 5043 - 3204 I - J 4833 -3592 D - E 5054 -3115 J - K 4826 -3726 E - F 4267 -2634 K - L 240 -194 F - G 3630 -2243 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. Y - X 2329 -2983 R - Q 48 -54 X - W 80 - 88 P - N 3447 -4240 V- T 2803 -3944 Q- O 0 0 W- U 0 0 N- M 336 -294 T - S 2270 -3242 M - L 185 -165 S - R 2270 - 3242 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A - Y 186 -124 F - R 477 - 304 Y - B 4367 -2968 R - G 460 - 530 B - X 647 - 815 R - P 2324 -3081 , X - C 463 -514 G - P 2701 -3166 .X - V 2634 - 3672 P - Q 235 -192 C - V 168 -225 P - H 472 -466 V - W 121 -257 P -1 786 -1100 - V - E 525 -1117 1- N 1078 -995 E - T 1243 -804 N - K 3410 -4470 F - T 762 -1881 M - K 2692 -2211 -`r r, je -WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER"), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT' form. Verity design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance ofthe professional engineeflnE Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field # 047182 use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 41)20 ParkVleW Dr guidelines of the Building Component Safety Information (BBC[) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilifies and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPIA. Copyright 0 2016 A-1 Roof Trusses- Repmduchon of this document in any foml is prohibited without the written permission of A-1 Roof busses. Job: Truss Truss Type Qty Ply 06/16/2021 _ 85072 A06 SPEC 1 1 Seal #: 2491 �- 3'9" --{ 15'4" 'I" T4° -{- 217 05x8 E5X8 F G 12 6 E (a) I W 1.5X4 03X6 D (a) T5 3 12 C (a) (a) (B) I� (a) 183X6 J g7X6(SRS B T 01.5X3A (a m T a) 6X70 '16X612 =H0510 T S R QPO B4 BX41X6=7XB 113X6N�Y B X6(R) =5 0SX4 3 - X7 N 12 SEAT PLATE REQ. i 13'0"2 Loading Criteria (psi) Wind Criteria Snow Criteria (Pg,Pf in PSF) TCLL: 20.00 Wind Std: ASCE 7-16 Pg: NA Ct: NA CAT: NA TCDL: 15.00 Speed: 160 mph Pt NA Ce: NA BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA BCDL: 10.00 Risk Category: II Snow Duration: NA EXP: C Kzt NA Des Ld: 45.00 Mean Height 25.00 ft NCBCLL: 10.00 TCDL• 5.0 psf Building Code: Soffit 0.00 BCDL: 5.0 psf FBC 7th Ed. 2020 Res. Load Duration: 1.25 MWFRS Parallel Dist hl2 to h TPI Sid: 2014 Spacing: 24.0 " C&C Dist a: 4.70 ft Rep Fac: Yes Loc. from endwali: not in 13.00 ft FT/RT:10(0)/10(10) GCpi: 0.18 Plate Type(s): Wind Duration: 1.60 1ArGVF 1.Ic Lumber Top chord: 2x4 SP #2; T5 2x4 SP M-30; Bot chord: 2x4 SP #2; B4 2x4 SP M-30; Webs: 2x4 SP #3; W6,W16 2x4 SP #2; W17 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 3X4 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 19.08 26.42 BC 58 0.00 13.13 BC 54 12.88 33.52 BC 75 33.27 44.58 BC 36 44.58 47.58 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide Clearance. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "WARNING" note below. -3X6(B1) ZZ SEAT PLATE REQ. 457" - - r 2' -1 . 20'3"2 48 11'0'12 3' ---{ IICSI Criteria Deflection in loc Udefi U# 2T(LL): 0.324 H 999 360 2T(CL): 0.582 H 919 267 RZ(LL): 0.198 M - RZ(rL): 0.387 M - - ep Factor. 2.0 (TC CSI: 0.852 ( BC CSI: 0.995 ( Web CSI: 0.963 ight: 316.4 Ibs EW Ver: 21.01.01A.0521.20 Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflection meets U360. Right cantilever is exposed to wind Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL Y 2070 /- /- /1770 /991 /577 M 2379 /- /- 12489 /1001 /- Wind reactions based on MWFRS Y Brg Width = 8.0 Min Req = 2.4 M Brg Width =12.0 Min Req = 2.9 Bearings Y & M are a rigid surface. Bearings Y & M require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 186 - 77 G - H 4282 - 4647 B - C 3131 -3066 H -1 4152 -4664 C - D 3581 - 3773 I - J 3410 - 3651 D - E 3592 -3685 J - K 3404 -3742 E - F 2777 -2934 K - L 239 -204 F - G 2475 -2508 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. Y - X 2339 -2079 R - Q 110 - 94 X - W 27 -16 P - N 3464 - 2896 V- T 3309 - 2763 Q- O 0 0 W-U 0 0 N-M 316 -298 T - S 2538 -1894 M - L 196 -165 S - R 2538 -1894 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Camp. A-Y 182 -124 F-R 276 -316 Y - B 2842 - 2981 R - G 266 - 282 B - X 683 -435 R - P 2449 -1760 X - C 591 -1080 G - P 2335 - 2134 X - V 2852 - 2588 P - Q 237 - 213 C - V 741 -393 P - H 538 -459 V - W 120 -103 P -1 798 - 533 V - E 729 - 995 I - N 678 -1004 E - T 1277 -1073 N - K 3537 - 3178 F - T 852 -1251 M - K 1995 - 2217 -WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any Too represents an acceptance of the professional engineednE Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047� 82 responsibility of the Owner, the Owners authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use ofthe Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced.for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright ®2016 A-1 Rool'Trumes- Reproduction of this document, In any form, is prohibited without the written permission of A-1 Roof Trusses. Job: 85072 Truss Truss Type A07 SPEC Qty I Ply 1 06/16/2021 Seal #: 2491 I---- 3'9" 154' iT4' i217 r T m1.5x i 17 T SEAT PLATE REQ. oW �sW F G L. =oAtu IMOM - 12 4TT" i---13'0"2 10 20'4"10 Loading Criteria (psf) Wind Criteria TCLL: 20.00 Wind Std: ASCE 7-16 TCDL: 15.00 Speed: 160 mph BCLL: 0.00 Enclosure: Closed BCDL: 10.00 Risk Category: II EXP. C Kzt: NA Des Ld: 45.00 Mean Height: 25.00 ft NCBCLL: 10.00 TCDL: 5.0 psf Soffit: 0.00 BCDL: 5.0 psf Load Duration: 1.25 MWFRS Parallel Dist: h/2 to h Spacing: 24.0 " C&C Dist a: 4.70 ft Loc. from endwall: not in 13.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; B3 2x6 SP #2; Webs: 2x4 SP #3; W6,W15 2x4 SP #2; W16 2x6 SP #2; Rt Slider: 2x4 SP #3; block length = 1.500' Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 19.08 26.42 BC 54 0.00 13.13 BC 58 12.89 33.52 BC 55 33.52 44.58 BC 36 44.58 47.58 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "WARNING" note below. Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf. NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): 47'7" Defl/CSI Criteria PP Deflection in loc Udefl U# VERT(LL): 0.306 R 999 360 VERT(CL): 0.612 S 873 267 HORZ(LL): 0.206 N - - HORZ(TQ: 0.430 N - - Creep Factor. 2.0 Max TC CSI: 0.933 Max BC CSI: 0.993 Max Web CSI: 0.997 Weight: 298.9 Ibs Ver. 21.01.01 A.0521.20 Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflection meets U360. Right cantilever is exposed to wind Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. SEAT PLATE REQ. j2 11'0"12 3' ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL X 2062 /- /- 11695 /1137 /577 N 2371 /- /- /2399 /1142 A Wind reactions based on MWFRS X Big Width = 8.0 Min Req = 2.4 N Brg Width = 12.0 Min Req = 2.8 Bearings X & N are a rigid surface. Bearings X & N require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 188 - 76 G - H 3753 - 3229 B - C 3637 - 3052 H -1 4940 - 4524 C - D 5137 -4541 1-1 3827 -3432 D - E 5148 -4452 J - K 3823 -3566 E - F 3862 - 3264 K - L 248 - 217 F - G 3477 -2798 L - M 191 -146 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. X - W 2330 -2492 R - Q 3976 -3949 W - V 20 -19 Q - P 3978 - 3953 U - S 3994 -4099 P - O 3295 - 3294 V- T 0 0 O- N 337 - 307 S - R 2833 -2820 N - M 207 -177 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A - X 184 -124 F - R 280 - 335 X - B 3341 -2969 R - G 1059 -1287 B - W 646 -548 R - H 1506 -1511 W - C 1487 -1637 P - H 1136 -1119 W - U 3092 - 3321 P -1 825 - 839 C - U 1443 -1341 1-0 929 - 996 U - V 120 -103 O - K 3296 -3573 U - E 1114 -1447 N - K 2383 -2213 E - S 1708 -1491 L - M 83 -95 F - S 985 -1399 -WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER"), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYEY) ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any Too represents an acceptance of the professional engineerin Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPIA. The approval of the TDD and any field # 047182 use of the Truss, Including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. A0 notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties Involved. The Specialty Engineer Is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any budding. All capitalized terms are as defined in TPI-1. Copyright m 2016 A-1 Roof Trusses- Reproduction of this document, in any fom% is prohibited without the wdlten pemdssion of A-1 Roof Tmsses. Job: Truss Truss Type Qty Ply 06/16/2021 85072 A08 SPEC 1 1 Seal #: 2531 I-- 3'9" 15'4" + T4" 217' -i 55F 6 ss5r'X6 12 6 � E (a) (a) H (a) 3 p CD (a) (a W12 J %4X4 (a) =H0710 = T V T lip S R 83 QO 01.5X3 O T gEp<(;�� ) a W13 I -4X10 �H051. 111.5X4P T a) K14X10 21I, 1 j z�Z --7X1 N L=_3X6(B1) 1 1 Y_ill X6 = x III SX4 3 � 6 = 12 SEAT PLATE REQ. SEAT PLATE REQ. 457" _ _ j 2' -� � - 13'97 1"6 19,1012 '(' 1 VTA j- 3' 477' -� Loading Criteria (pst) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-16 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Gravity Non -Gravity TCDL: 15.00 Speed: 160 mph Pf: NA Ce: NA VERT(LL): 0.404 S 999 360 Loc R+ / R- / Rh / Rw / U / RL Y 2062 /- /- /1695 /1138 /584 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): 0.798 T 670 267 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.295 M - - M 2371 /- /- /2399 11141 A Des Ld: 45.00 EXC Kzt: NA HORZ L 0.613 M - - )� Wind reactions based on MWFRS Building Code: NCBCLL: 10.00 Mean Height 25.00 IttT Creep Factor. 2.0 Y Brg Width = 8.0 Min Req = 2.4 Soffit 0.00 TCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.854 M Brg Width = 12.0 Min Req = 2.8 Load Duration: 1.25 BCDL: 5.0 psf MWFRS Parallel Dist h/2 to h TPI Std: 2014 Max BC CSI: 0.983 Bearings Y & M are a rigid surface. Bearings Y & M require a seat plate. Spacing: 24.0 " C&C Dist a: 4.70 It Rep Fac: Yes Max Web CSI: 0.995 Maximum Top Chord Forces Per Ply (Ibs) Loc. from endwall: not in 13.00 ft FT/RT:10(0)/10(10) Weight: 317.1 Ibs Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.18 Plate Type(s): VIEW Ver: 21.01.01A.0521.20 A - B 188 -76 B - C 3638 -3052 G - H 4208 - 3699 H - 1 6050 -5582 Wind Duration: 1.60 WAVE HS Lumber Wind C - D 6179 - 5585 I - J 6034 - 5660 Top chord: 2x4 SP #2; T4 2x4 SP M-30; Wind loads based on MWFRS with additional C&C D - E 6201 - 5568 J - K 4219 - 3937 Bot chord: 2x4 SP #2; B2,B3 2x6 SP #2; member design. E - F 4327 -3753 K- L 219 -158 Webs: 2x4 SP #3; W6,W17 2x6 SP #2; W12,W13, Left end vertical exposed to wind pressure. Deflection F - G 3889 -3235 W16 2x4 SP #2; meets U360. Bracing Right cantilever is exposed to wind Maximum Bot Chord Forces Per Ply (Ibs) (a) Continuous lateral restraint equally spaced on Wind loading based on both gable and hip roof types. Chords Tens.Comp. Chords Tens. Comp. Y _ X 2331 -2485 R - O 5009 -4917 member. Right bottom chord exposed to wind. Plating Notes X - W 21 -21 Q - P 0 -2 V - T 4921 -5024 P - N 277 -333 All plates are 4X6 except as noted. W- U 0 0 N- M 293 -257 Purlins T - S 3271 -3237 M - L 152 -143 S - R 5008 -4914 In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) Maximum Web Forces Per Ply (Ibs) TC 24 19.08 26.42 Webs Tens.Comp. Webs Tens. Comp. BC 54 0.00 13.13 BC 53 12.90 33.20 A - Y 184 -123 F - S 317 - 355 BC 75 . 32.98 44.58 Y - B 3343 - 2971 S - G 1241 -1500 BC 36 44.58 47.58 B - X 647 - 548 S - H 2O96 - 2033 Apply purlins to any chords above or below fillers X - C 2012 -2135 H - 0 1556 -1604 at 24" OC unless shown otherwise above. X - V 3376 -3610 P - O 259 -255 C - V 2319 -2235 O - J 1559. -1501 Loading V - W 120 -103 O - N 3475 -3425 Truss passed check for 20 psf additional bottom V - E 1473 -1812 J - N 1298 -1398 chord live load in areas with 42"-high x 24"wide E - T 2188 -1954 N - K 3548 - 3842 clearance. F - T 1177 -1600 M - K 2344 - 2205 Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "WARNING" note below. -WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (rDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shag be used for the TDD to be valid. As a Truss Design Engineering (.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerinE Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, underTPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owners authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, instatiation and bracing shag be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TP14 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terns are as defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses- Reproduction of this document, in any form, is prohib@ed withoutthe written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 85072 A09 SPEC 1 1_ Seal #: 2729 I-3'9" 15'4" I T4" i 21Y 55X8 F G w. 12 =3xs(Bq SEAT PLATE REQ. SEAT PLATE REQ. 457" r 13V2 �{� 19'10"2 -}" 1174 ling Criteria (psf) Wind Criteria L: 20.00 Wind Std: ASCE 7-16 L: 15.00 Speed: 160 mph L: 0.00 Enclosure: Closed L: 10.00 Risk Category: II EXP: C Kzt: NA Ld: 45.00 Mean Height: 25.00 ft CLL: 10.00 TCDL: 5.0 psf t: 0.00 BCDL: 5.0 psf I Duration: 1.25 MWFRS Parallel Dist: h to 2h :ing: 24.0 " C&C Dist a: 4.70 ft Loc. from endwall: not in 13.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP M-30; T1 2x4 SP #2; T5, T6 2x4 SP 2400f-2.0E + SP M-31; Bot chord: 2x6 SP 2400f-2.OE; B1 2x4 SP #2; B4, B5 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #2; W1,W2,W3,W4,W9,W10, W15 2x4 SP #3; W17 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 5X6 except as noted. Purlins In lieu of structural panels or rigid ceiling use purins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 19.08 26.42 BC 54 0.00 13.13 BC 64 12.92 33.19 BC 75 32.98 44.58 BC 36 44.58 47.58 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Additional Notes WARNING: Fumish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "WARNING" note below. 4TT' Snow Criteria (Pg,Pf (n PSF) Defl/CSI Criteria Pg:'NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Pf: NA Ce: NA VERT(LL): 0.568 P 941 360 Lu: NA Cs: NA VERT(CL): 1.157 T 462 267 Snow Duration: NA HORZ(LL): 0.502 M - - HORZ(TL): 1.056 M - - Building Code: Creep Factor. 2.0 FBC 7th Ed. 2020 Res. Max TC CSI: 0.847 TPI Std: 2014 Max BC CSI: 0.993 Rep Fac: Yes Max Web CSI: 0.995 FT/RT:10(0)/10(10) Weight: 308.7 lbs; Plate Type(s): MEW Ver.'20.02.01A.1209.11 tnrevc ue Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflection meets U360. Right cantilever is exposed to wind Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ / R- / Rh / Rw / U / RL Y 2062 /- /- /1695 11138 /584 M 2371 /- /- /2399 11141 /- Wind reactions based on MWFRS Y Brg Width = 8.0 Min Req = 2.4 M Brg Width = 12.0 Min Req = 2.0 Bearings Y & M are a rigid surface. Bearings Y & M require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 188 -76 G - H 4767 -4294 B - C 3638 -3052 H -I 8241 -7934 C - D 8559 -7926 1- J 4043 -3634 D - E 8570 -7837 J - K 4037 -3768 E - F 4915 -4365 K - L 232 -186 F - G 4403 - 3780 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. Y - X 2331 -2485 R - O 7039 -6902 X-W 25 -26 Q-P 0 -2 V - T 7009 -7158 P - N 198 -245 W-U 0 0 N-M 313 -281 T - S 3822 - 3782 M - L 179 -158 S - R 3822 - 3782 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A - Y 183 -123 F - R 343 -385 Y - B 3343 -2970 R - G 1456 -1751 B - X 646 -546 R - H 3557 -3515 X - C 2686 -2770 H - O 2469 - 2626 X - V 3799 -4059 P - O 263 -252 C - V 4309 -4270 0-1 3702 -361,a V - W 119 -102 O - N 3655 - 3593 ^ V - E 2714 -3077 I - N 1836 -1935 E - T 3791 - 3518 N - K 3436 -3727 F - T 1444 -1864 M - K 2357 -2204 -WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER', GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER) ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, onlyAlpine connector plates shag be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal an any TDD represents an acceptance of the professional engineedn Manuel Martinez, P.E. responsibility for the.design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 0471$2 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4621) Park1/iBW Dr guidelines of the Building Component Safety Information (BSCI),published by TPI and SBCA are referenced for general guidance. TPI-,defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terns are as defined in TPI-1. Copyright 02016 A-1 Roof Trusses -Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 85072 A10 SPEC 1 1 Seal #: 2499 �- 3'9° o5X8 F a5X6 G 217 M SEAT ,god T7� RED. SEAT PLATE REQ. i- 13'l1"2 Loading Criteria (psf) Wind Criteria TCLL: 20.00 Wind Std: ASCE 7-16 TCDL: 15.00 Speed: 160 mph BCLL: 0.00 Enclosure: Closed BCDL: 10.00 Risk Category: II EXP: C Kzt: NA Des Ld: 45.00 Mean Height 25.00 It NCBCLL: 10.00 TCDL: 5.0 psf Soffit 0.00 BCDL: 5.0 psf Load Duration: 1.25 MWFRS Parallel Dist h to 2h Spacing: 24.0 " C&C Dist a: 4.70 ft Loc. from endwall: not in 13.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; 132,133 2x4 SP M-30; Webs: 2x4 SP #3; W12,W13,W16 2x4 SP #2; W17 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 4X6 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 19.08 26.42 BC 93 0.00 13.13 BC 57 12.91 33.20 BC 75 32.98 44.58 BC 36 44.58 47.58 Apply purins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Additional Notes WARNING: Furnish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "WARNING" note below. Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Faa Yes FT/RT:10(0)/10(10) Plate Type(s): 19'10"2 477' DefUCS1 Criteria PP Deflection in loc Udefi U# VERT(LQ: 0.377 P 999 360 VERT(CQ: 0.738 Q 666 245 HORZ(LL): 0.295 M - - HORZ(TL): 0.640 M - - Creep Factor. 2.0 Max TC CSI: 0.965 Max BC CSI: 0.972 Max Web CSI: 0.998 Weight 292.6 Ibs VIEW Ver: 21.01.01A.0521.20 Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflection meets U360. Right cantilever is exposed to wind Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. 1174 1 3' ---i ♦ Maximum Reactions (Ibs), or'=PLF Gravity Non -Gravity Loc R+ / R- / Rh ! Rw / U / RL Z 111 A /- /45 /58 /584 AA"- /-22 A /36 /28 /- Y 2214 A A /1791 /1192 /- M 2195 /- /- /2251 /1043 /- Wind reactions based on MWFRS Z Brg Width = 8.0 Min Req = 1.5 AA Brg Width = 32.0 Min Req = - Y Brg Width = 8.0 Min Req = 2.6 M Brg Width = 12.0 Min Req = 2.7 Bearings Z, AA, Y, & M are a rigid surface. Bearings Z; AA, Y, & M require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 109 - 93 G - H 3692 - 3270 B - C 1986 -1640 H - I 5728 - 5462 C - D 4765 -4430 I - J 3755 -3397 D - E 4776 -4342 J - K 3746 - 3532 E - F 3573 -3116 K - L 226 -173 F - G 3424 -2848 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. Z - Y 919 -1143 S - R 2701 - 2562 Y - X 500 - 524 R - O 4835 - 4637 X-W 12 -12 Q-P 0 -2 W-U 0 0 P-N 188 -230 V - T 3904 -3769 N - M 297 - 263 T - S 2701 - 2562 M - L 166 -151 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A-Z 127 -98 F-R 513 -299 Y - B 2212 -2015 R - G 1079 -1267 B - X 1637 -1804 R - H 2271 - 2233 X - C 1951 -2089 H - O 1698 -1730 X - V 1856 -1795 P - O 242 - 232 C - V 2523 -2432 0-1 1727 -1618 V - W 171 -158 O - N 3249 - 3142 V - E 913 -1096 I- N 1280 -1404 E - T 1474 -1399 N - K 3195 - 3435 F - T 745 -1062 M - K 2148 - 2033 "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine be be As Truss Design Engineering Specialty Engineer), the TDD an acceptance of the engineerin Manuel Martinez, P.E. connector plates shall used for the TDD to valid. a (i.e. seal on any represents professional responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TKA. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses- Reproduction of this document in any form, is prohibited without the written permission of A.1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 85072 A11 HIPS Seal #: 2503 T T " 1 1 198"4 i74" E5X8 E X 1113X6 __SX8 III INX4 3 C�_ 12 F SEAT PLATE REQ. 42'2"4 SEAT PLATE REQ. - j 2' - ( i97"6 �= 19,192 -I- 1174 T=-3' --I 442'4 Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria TCLL: 20.00 Wind Std: ASCE 7-16 Pg: NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# TCDL: 15.00 Speed: 160 mph Pf: NA Ce: NA VERT(LL): 0.337 O' 999 360 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): 0.649 P 761 247 BCDL: 10.00 Risk Category: II Snow Durations NA HORZ(LL): 0.251 L - - Des Ld: 45.00 C Kz. HORZ(TL): 0.535 L - - Building C ode: ! NCBCLL: 10.00 MeaEXPn Height:: 2500 ft Creep Factor. 2.0 Soffit: 0.00 TCDL: 5.0 psf BCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TG CSI: 0.981 Load Duration: 1.25 MWFRS Parallel Dist: h to 2h TPI Std: 2014 Max BC CSI: 0.994 Spacing: 24.0 " C&C Dist a: 4.36 It Rep Fac: Yes Max Web CSI: 0.921 Loc. from endwall: not in 13.00 ft FT/RT:10(0)/10(10) Weight: 278.6 Ibs GCpi: 0.18 Plate Type(s): VIEW Ver. 21.01.01A.0521.20 Wind Duration: 1.60 1A/AVI= uc ' Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; 62,133 2x4 SP M-30; Webs: 2x4 SP #3; W11,W12,W15 2x4 SP #2; W16 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 5X6 except as noted. Purlins In lieu of structural panels or rigid ceiling use puriins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 15.69 23.02 BC 91 0.00 9.74 BC 60 9.51 29.81 BC 75 29.58 41.19 BC 36 41.19 44.19 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24%wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflection meets L/360. Right cantilever is exposed to wind Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL X 1921 /- /- /1598 /1062 /578 L 2223 A A /2257 /1061 1- Wind reactions based on MWFRS X Brg Width = 7.2 Min Req = 2.3 L Brg Width = 12.0 Min Req = 2.7 Bearings X & L are a rigid surface. Bearings X & L require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 2140 -1799 F - G 3615 - 3194 B - C 4577 -4219 G - H 5302 - 5015 C - D 4590 -4141 H -1 3897 -3544 D - E 3526 -3068 I - J 38M -3678 E - F 3354 -2780 J - K 212 -138 Maximum Sot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. X - W 492 -528 Q - N 4437 -4242 W-V 16 -18 P-O 0 -2 U - S 3709 -3590 O - M 225 -269 V- T 0 0 M- L 276 -239 S - R 2659 - 2511 L - K 134 -137 R - Q 2659 - 2511 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A-X 2112 -1883 Q-F 1041 -1231 A - W 1817 -2042 Q - G 1953 -1917 W - B 1921 -2053 G - N 1485 -1508 W - U 1973 -1913 O - N 234 -227 B - U 2203 -2125 N - H 1229 -1125 U - V 170 -177 N - M 3257 -3153 U - D 819 -1030 H - M 1104 -1239 D - S 1355 -1254 M - J 3295 - 3528 E - S 743 -1062 L - J 2157 -2060 E - Q 472 - 296 "WARNING- Please thoroughly review the "A-1 ROOF TRUSSES r'SELLER'l, GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER'S ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerin Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. Ali notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty. Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 02016 Al Roof Trusses- Reproduction of this document, in any forrR is prohibited without the written permission of A-1 Roof Tmsses. Job: Truss Truss Type Qty Ply 06/16/2021 85072 Al2 SPEC 1 1 Seal #: 2534 o_ i 166"4 ir4^ -{- A5x8 D E aaxe ®4X10 N1.5X4 2 SEAT PLATE REC. i--- 9716 1P 20'4"10 Loading Criteria (psf) Wind Criteria TCLL: 20.00 Wind Std: ASCE 7-16 TCDL: 15.00 Speed: 160 mph BCLL: 0.00 Enclosure: Closed BCDL: 10.00 Risk Category: II EXP. C Kzt: NA Des Ld: 45.00 Mean Height: 25.00 ft NCBCLL: 10.00 TCDL: 5.0 psf Soffit: 0.00 BCDL: 5.0 psf Load Duration: 1.25 MWFRS Parallel Dist h to 2h Spacing: 24.0 " C&C Dist a: 4.36 it Loc. from endwall: not in 13.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B2 2x6 SP #2; B3 2x8 SP 2400f-1.8E; Webs: 2x4 SP #3; W14 2x4 SP #2; W15 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 5X6 except as noted. Purlins In lieu of structural panels or rigid ceiling use puffins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 15.69 23.02 BC 91 0.00 9.74 BC 68 9.50 ' 30.12 BC 56 30.12 41.19 BC 36 41.19 44.19 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Dw Criteria (Pg,Pf in PSF) Defl/CSI Criteria NA Ct: NA CAT: NA PP Deflection in loc Udefl U# NA Ce: NA VERT(LL): 0.236 M 999 360 NA Cs: NA VERT(CL): 0.437 M 999 247 )w Duration: NA HORZ(LL): 0.143 K - - HORZ(TL): 0.300 K - - ilding Code: Creep Factor. 2.0 3 7th Ed. 2020 Res. Max TC CSI: 0.843 Std: 2014 Max BC CSI: 0.985 3 Fac: Yes Max Web CSI: 0.986 RT:10(0)/10(10) Weight: 294.0 lbs to Type(s): VIEW Ver: 21.01.01A.0521.20 %= Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflection meets U360. Right cantilever is exposed to wind Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. 1m3X6(B7) _ SEAT PLATE REG. j 2 --1 11'0" 12 =)=- 3' --1 ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ / R- / Rh / Rw / U / RL U 1921 /- A /1598 /1062 /570 K 2223 A /- 12258 /1062 /- Wind reactions based on MWFRS U Brg Width = 7.2 Min Req = 2.3 K Brg Width = 12.0 Min Req = 2.7 Bearings U & K are a rigid surface. Bearings U & K require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 2235 -1892 F - G 4418 - 4012 B - C 3765 -3336 G - H 4401 -4063 C - D 3219 -2728 H -1 3645 -3629 D - E 3067 - 2463 I - J 212 -139 E - F 3296 - 2854 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. U - T 494 - 519 O - N 3581 - 3454 T - S 20 - 20 N - M 3582 - 3458 R - P 2923 -2845 M - L 3301 -3246 S-Q 0 0 L-K 275 • -240 P - O 2356 -2239 K - J 134 -136 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Camp. A - U 2093 -1876 D - O 439 - 280 A - T 1841 -2064 O - E 907 -1079 T - B 1684 -1815 O - F 1414 -1423 T - R 1929 -1889 M - F 1075 -1056 B - R 1497 -1443 M - H 424 - 378 R - S 142 -148 H - L 641 -749 R - C 463 - 587 L - I 3248 - 3482 C - P 846 -728 K -1 2160 - 2063 D - P 643 -926 "WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER"), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine . connector plates shag be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineedn Manuel Martinez, P.E. responsibildy for the design of the single Truss depicted on the TDD only, underTPF1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shag be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specially Engineeris NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 02016 A-1 Roof Trusses -Reproduction of this document, in any forth, Is. prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 85072 A13 SPEC 1 1 Seal#: 2537 15'8.4 iT4" i 212- e5X8 65X10 D E nano =4X10 III1.5X4 12 SEAT PLATE REC. 4474 ling Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Deft/CSI Criteria L: 20.00 Wind Std: ASCE 7-16 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# L: 15.00 Speed: 160 mph Pf: NA Ce: NA VERT(LL): 0.265 F 999 360 L: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): 0.497 F 995 247 L: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.151 K - - Ld: 45.00 EXP: C Kzt: NA HORZ(TL): 0.311 K - - Building Code: CLL: 10.00 Mean Height 25.00 ft Creep Factor. 2.0 TCDL: 5.0 psf t: 0.00 BCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.758 1 Duration: 1.25 MWFRS Parallel Dist: h to 2h TPI Std: 2014 Max BC CSI: 0.998 :ing: 24.0 " C&C Dist a: 4.42 ft Rep Fac: Yes Max Web CSI: 0.991 Loc. from endwall: not in 13.00 ft FT/RT:10(0)/10(10) Weight: 301.0 lbs GCpi: 0.18 Plate Type(s): VIEW Ver. 21.01.01A.0521.20 Wind Duration: 1.60 WAVE Lumber Top chord: 2x4 SP #2; T4 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W15 2x4 SP #2; W16 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 5X6 except as noted. Puffins In lieu of structural panels or rigid ceiling use puriins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 15.69 23.02 BC 91 0.00 9.74 BC 59 9.49 30.19 BC 55 29.93 41.19 BC 36 41.19 44.19 Apply puriins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflection meets U360. Right cantilever is exposed to wind Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. SEAT PLATE REQ. -- j 2 --( 11' i 3' --1 ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ / R- / Rh / Rw / U / RL W 1921 /- A /1598 /1062 /569 K 2223 /- /- /2258 /1062 A Wind reactions based on MWFRS W Brg Width = 7.2 Min Req = 2.3 K Brg Width =12.0 Min Req = 2.7 Bearings W & K are a rigid surface. Bearings W & K require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 2236 -1892 F - G 4519 -4131 B - C 3219 -2766 G - H 4501 -4210 C - D 2934 -2416 H -1 3631 -3412 D - E 2807 - 2172 I - J 243 - 203 E-F 4710-4199 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. W-V 494 -518 P-O 90 -96 V-U 21 -19 N-L 3154 -3097 T- R 2416 -2355 O- M 0 0 U- S 0 0 L- K 326 -293 R - Q 2077 -1975 K - J 196 -169 Q - P 90 - 96 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A - W 2093 -1876 Q - E 411 -370 A - V 1842 - 2065 Q - N 2130 -1991 V - B 1309 -1430 E - N 2223 -2261 V-T 1748 -1718 N-0 238 -214 B - T 1012 -973 N - F 467 -467 T - U 142 -148 N - H 690 -618 T - C 296 -355 H - L 803 - 918 C - R 596 -508 L -1 3131 - 3379 " D - R 532 -787 K -1 2188 -2066 D - Q 425 -265 "WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER"), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT" form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerin Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPIA. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the At 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss,including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. Ali notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses-Repmduclion of this tlocumerd, in any form, is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type City Ply 06/16/2021 _ 85072 A14 HIPS 1 1 Seal #: 2513 �- 0s5X6 1T T m _L63-2 1 V I 15'8"4 m5X8 -Z6X8 E F mym misxa 21'2" s t=- -=5X6 12 SEAT PLATE REQ. SEAT PLATE REQ. 42'24 -- - - -�- z I' 976 180 20'3"2 .11% 11'0"12 -i 3' ---{ ling Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria L: 20.00 Wind Std: ASCE 7-16 Fig: NA Ct: NA CAT: NA PP Deflection in loc L/defi L/# L: 15.00 Speed: 160 mph Pf: NA Ce: NA VERT(LL): 0.257 G 999 360 L: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): 0.481 G 999 247 L: 10.00 Risk Category: 11 Snow Duration: NA HORZ(LL): 0.139 L - - Ld: 45.00 EXP: C Kzt: NA L 0.282 L (T ) Building Code: CLL: 10.00 Mean Height: 25.00 itHORZ Creep Factor. 2.0 TCDL: 5.0 psf t 0.00 BCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.717 1 Duration: 1.25 MWFRS Parallel Dist h to 2h TPI Std: 2014 Max BC CSI: 0.976 ang: 24.0 " C&C Dist a: 4.36 ft Rep Fac: Yes Max Web CSI: 0.997 Loc. from endwall: not in 13.00 ft FT/RT:10(0)/10(10) Weight: 303.8 Ibs GCpi: 0.18 Plate Type(s): VIEW Ver: 21.01.01A.0521.20 Wind Duration: 1.60 WAIX Lumber Top chord: 2x4 SP #2; T4 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W10,W15 2x4 SP #2; W16 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 3X6 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 15.69 23.02 BC 91 0.00 9.74 BC 63 9.48 30.12 BC 55 29.88 41.19 BC 36 41.19 44.19 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflection meets L/360. Right cantilever is exposed to wind Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL X 1921 /- /- /1598 11062 1571 L 2223 A /- /2257 /1062 /- Wind reactions based on MWFRS X Brg Width = 7.2 Min Req = 2.3 L Brg Width =12.0 Min Req = 2.7 Bearings X & L are a rigid surface. Bearings X & L require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 2140 -1800 F - G 4705 - 4193 B - C 2815 -2377 G - H 4511 -4201 C - D 2828 -2298 H -1 3653 -3299 D - E 2727 - 2189 I - J 3646 - 3433 E - F 2612 -1958 J - K 242 -200 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. X - W 491 -520 Q - P 45 -47 W-V 70 -67 O-M 3171 -3111 U-S 2064 -2010 P-N 0 0 V-T 0 0 M-L 323 -290 S - R 1872 -1779 L - K 193 -167 R - Q 1872 -1779 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A-X 2112-1883 Q-F 4B7 -619 A - W 1818 - 2042 Q - O 2035 -1904 W - B 972 -1073 F - O 2546 - 2552 W - U 1516 -1485 0 - P 235 - 212 B - U 662 -640 O - G 463 -463 U - V 171 -179 O - H 663 - 593 U - D 194 -153 H - M 790 - 907 D - S 416 - 378 M - J 3146 - 3392 E - S 458 -693 L - J 2186 -2066 E - Q 408 -254 "WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER' ), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (rDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shag be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerin Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TKI. The design assumptions, loading conditions, suitability and use ofthis Truss for any Building is the # Q47182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines ofthe Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms areas defined in TPI-1. Copyright ® 2016 A-1 Roof Trusses -Reproduction of this document. In any form, is prohibited without the wr tten permission of A-1 Roof Trusses. Job: Truss Truss Type 85072 A15 SPEC l- 3'9" 15'4" i7'4" N7X6(R) D Qty Ply 5 1 o5X6 E 06/16/2021 Seal #: 2528 21'2" =9Ao cons =JA4 =4Ao =3Ao - 12 SEAT PLATE REC. ling Criteria (psf) Wind Criteria L: 20.00 Wind Std: ASCE 7-16 L: 15.00 Speed: 160 mph L: 0.00 Enclosure: Closed L: 10.00 Risk Category: II EXP: C Kzt: NA Ld: 45.00 Mean Height: 25.00 ft CLL: 10.00 TCDL: 5.0 psf t: 0.00 BCDL: 5.0 psf I Duration: 1.25 MWFRS Parallel Dist: h/2 to h :ing: 24.0 " C&C Dist :a: 4.70 ft Loc. from endwall: not in 13.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W8 2x4 SP #2; W15 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 3X6 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 19.08 26.42 BC 75 0.00 33.38 BC 75 33.40 44.58 BC 36 44.58 47,58 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on li with additional C&C member design. Left end vertical exposed to wind pressure. Deflection meets U360. Right cantilever is exposed to wind Wind loading based on both gable and hip roof types. Right bottom chord exposed to wind. 33'6"4 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf. NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Iding Code: 7th Ed. 2020 Res. Std: 2014 Fac: Yes RT:10(0)/10(10) SEAT PLATE REQ. SEAT PLATE REC. ---} 12'4" - j 2 -1 4TT' I/CSI Criteria Deflection in loc Udefl U# RT(LL): 0.069 S 999 360 RT(CL): 0.162 S 999 240 RZ(LL): 0.025 O - - RZ(TL): 0.059 O - - ep Factor. 2.0 (TC CSI: 0.833 ( BC CSI: 0.767 c Web CSI: 0.795 ght: 309.4 Ibs Plate Type(s): WAVE IVIEWVer. 21.01.01A.0521.20 Additional Notes WARNING: Fumish a copy of this DWG to the installation contractor. Special care must be taken during handling, shipping and installation of trusses. See "WARNING" note below. 11'0"12 l- 3' -1 ♦Maximum Reactions,(lbs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL U 1523 A /- /999 /620 /575 N 2177 A A /1458 /829 A K 769 /- /- /932 /344 /- Wind reactions based on MWFRS U Brg Width = 8.0 Min Req = 1.8 N Brg Width = 8.0 Min Req = 2.6 K Brg Width =12.0 Min Req = 1.5 Bearings U, N, & K are a rigid surface. Bearings U, N. & K require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 1049 -1722 F - G 293 -125 B - C 1263 -2081 G - H 652 -571 C - D 1111 -1461 H - I 646 -633 D-E 880 -784 I-J 250 -215 E - F 306 - 31 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. U - T 468 -540 P - O 1194 -378 T - S 1736 - 861 O - N 28 -19 S - R 1766 - 774 M - L 430 - 245 R - Q 1766 -774 L - K 288 -265 Q - P 1194 - 378 K - J 210 -198 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A - U 899 -1499 O - M 859 -227 A - T 1923 -1125 E - M 975 -1386 T-B 650 -896 M-N 1515 -2117 B - S 139 -76 M - F 492 -496 S- C 317 0 M- G 803 -668 C - Q 519 -747 G - L 273 -32Z D - Q 728 -246 L - I 754 -676 D - O 489 -751 K - I 669 -640 O - E 523 - 287 `"WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'l, GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER'S ACKNOWLEDGMENT" form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specially Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerin Manuel Martinez, P.E. responsibility for the design of the single Truss depicted an the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 0471$2 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPIA. Copyright 0 2016 A-1 Roof Trusses- Reproduction of Nis dowmeM, in any form, is prohibited without the written peoNssion of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 11611612021 85072 A16G COMN 1 2 Seal #: 2594 I"__ 37 15'4" TV -I- 71"4 -I SEAT PLATE REG. 33'6.4 2' 2' 2' y 1 4.3 249.9 12M 122 1223# 1� 7425# Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria TCLL: 20.00 Wind Std: ASCE 7-16 Fig: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# TCDL: 15.00 Speed: 160 mph Pf: NA Ce: NA VERT(LL): 0.174 N 999 360 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): 0.391 N 999 240 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.060 C - - Des Ld: 45.00 C Kzt: NA HORZ(TL): 0.134 C - - Building Code: NCBCLL: 0.00 Mcan Height 25.00 ft ea Cree Factor. 2.0 p Soffit 0.00 TCDL: 5.0 psf BCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0:664 Load Duration: 1.25 MWFRS Parallel Dist 0 to h/2 TPI Std: 2014 Max BC CSI: 0.975 Spacing: 24.0 " C&C Dist a: 3.35 ft Rep Fac: Varies by Ld Case Max Web CSI: 0.987 Loc. from endwall: not in 9.00 it FT/RT:10(0)/10(10) Weight 595.0 Ibs GCpi: 0.18 Plate Type(s): VIEW Ver: 21.01.01A.0521.20 Wind Duration: 1.60 VdAVF HG Lumber Top chord: 2x6 SP #2; T4,T5 2x4 SP #2; Bot chord: 2x8 SP 2400f-1.8E; Webs: 2x4 SP #3; W1,W10 2x6 SP #2; W2 2x4 SP #2; W5,W6,W8 2x4 SP M-30; Bracing (a) Continuous lateral restraint equally spaced on member. Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @ 4.00" D.C. Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. (1)1/2" bolts may be used for (2) 0.131"x3", min. nails on The Bottom Chord Only. Special Loads -(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 61 pif at 0.00 to 61 pif at 3.75 TC: From 64 pif at 3.75 to 64 pif at 19.08 TC: From 61 plf at 19.08 to 61 pif at 26.42 TC: From 64 pif at 26.42 to 64 plf at 33.52 BC: From 10 pif at 0.00 to 10 pif at 8.72 BC: From 20 plf at 8.72 to 20 pif at 33.52 PLB: From 30 pif at 10.83 to 30 pif at 15.53 PLB: From 30 plf at 19.37 to 30 pif at 23.61 PLB: From 30 pif at 30.07 to 30 plf at 33.06 BC: 1223 lb Conc. Load at 1.38, 3.38, 5.38, 7.37 BC: 7425 lb Conc. Load at 8.72 Additional Notes The maximum concentrated load is 7426# Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 19.08 26.42 BC 113 0.00 33.52 Apply purins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads and reactions based on MWFRS. Left end vertical exposed to wind pressure. Deflection meets U360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. I 1 SEAT PLATE REG. ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ / R- / Rh / Rw / U / RL O 11192 /- A A /4939 /- P 4168 A /- /- /1617 /- Wind reactions based on MWFRS 0 Brg Width = 8.0 Min Req = 4.6 P Brg Width = 7.3 Min Req = 1.7 Bearings O & P are a rigid surface. Bearings 0 & P require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 94 -184 E - F 1098 - 2750 B - C 3434 -8252 F - G 526 -1330 C - D 3420 - 8222 G - H 611 -1521 D - E 3397 - 8185 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. O - N 6157 -2585 L - K 2409 -953 N - M 4590 -1891 K - J 2409 - 953 M- L 4590 -1891 J -1 0 0 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp A - 0 73 -137 F - L 2585 - 970 O - B 3122 -7476 F - J 757 -1911 B - N 1403 - 550 J - G 420 -105 C - N 58 -152 J - H 1838 -727 N - E 5387 -2265 H -I 823 -2029 E - L 1399 -3251 "WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (Too) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TOD, only Alpine be for TDD be As Truss Design Engineering Specialty Engineer), the TDD the engineeTinE Manuel Martinez, P.E. connector plates shall used the to valid. a (i.e. seal on any represents an acceptance of professional responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use ofthis Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specially Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. copyright 0 2016 A-1 Roof Trusses- Reproduction of this document, in any form. Is Prohibited without the wditen pemniesion of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06116/2021 _ 85072 A17 COMN 8 1 Seal #: 2606 13X4(A7) SEAT PLATE REQ. l­-2'j 217 r4^ i192'12 —� 55X6 F 36'8"12 =5X6 G m1.5X3 Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-16 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl L/# Gravity Non -Gravity TCDL: 15.00 Speed: 160 mph Pf: NA Ce: NA VERT(LL): 0.082 E 999 360 Loc R+ / R- / Rh / Rw / LI / RL p 1928 /- /- /1433 /625 /421 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): 0.193 E 999 240 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.028 J - - J 1757 /- A /1010 1615 A Des Ld: 45.00 EXP: C Kzt: NA 0.066 J - - Wind reactions based on MWFRS Building Code: NCBCLL: 10.00 Mean Height: 15.04 itHORZ(TL): TCDL: 5.0 psf Creep Factor. 2.0 P Brg Width = 8:0 Min Req = 2.3 Soffit: 0.00 BCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.868 J Br Width = - Min Re — g q — " Load Duration: 1.25 MWFRS Parallel Dist: 0 to h/2 TPI Std: 2014 Max BC CSI: 0.972 Bearing P is a rigid surface. Bearing P requires a seat plate. Spacing: 24.0 " C&C Dist a: 3.87 ft Rep Fac: Yes Max Web CSI: 0.877 Loc. from endwall: Any FT/RT:10(0)/10(10) Weight: 257.6 Ibs Maximum Top,Chord Forces Per Ply (Ibs) GCpi: 0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp. IVIEWVer.20.02.01A.1209.11 A-B 111 -126 E-F 1795 -2001 B - C 1591 -2433 F - G 1235 -1276 Wind Duration:1.60 IWAVE Lumber Top chord: 2x4 SP #2; C - D 1493 -2066 G - H 1230 -1491 Bot chord: 2x4 SP #2; B3 2x4 SP 24OOf--2.OE + D - E 1527 -2045 H - I 132 -68 SP M-31; Webs: 2x4 SP #3; W1 2x6 SP #2; W7 2x4 SP #2; Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. Bracing (a) Continuous lateral restraint equally spaced on A - P 138 -84 M - L 1470 -1054 member. P - O 470 -696 L - K 1470 -1054 O - N 2082 -1679 K - J 932 -673 Purlins N - M 2082 -1679 In lieu of structural panels orrigid ceiling use purlins to laterally brace chords as follows: Maximum Web Forces Per Ply (Ibs) Chord Spacing(in oc) Start(ft) End(ft) Webs Tens.Comp. Webs Tens. Comp. TC 24 21.17 28.50 BC 75 0.00 38.73 P - B 1312 -1804 F - K 463 -440 Apply purlins to any chords above or below fillers B - O 1813 -1022 K - G 269 -66 at 24" OC unless shown otherwise above. O - C 270 -210 K- H 619 -235 C - M 456 -428 H - J 1273 -1763 Hangers / Ties E - M 568 -402 I - J 171 -152 (J) Hanger Support Required, by others M - F 869 -767 Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. —WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT' forth. Verify design parameters and read notes on this Truss Design Drawing (Too) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any Too represents an acceptance ofthe professional engineefin.1 Manuel Martinez, P.E. responsibility for the design of the single Truss depicted an the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field # 047182 use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkVieW Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by aContract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPIA. Copyright Q 2016 A4 Roof Trusses- Reproduction of this document In any form, Is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 _ 85072 A18GE GABL Seal #: 2593 Loading Criteria (psf) TCLL: 20.00 TCDL: 15.00 BCLL: 0.00 BCDL: 10.00 Des Ld: 45.00 NCBCLL: 10.00 Soffit 0.00 Load Duration: 1.25 SDacina: 24.0 " 217" + 74" ilV2"12 ra5X6 =5X6 ni n o n —1113X4 AP AO AN AM AL AK AJ At AH AG AF AE AD AC AB AAizs3xJ m3X4 sa3X6 102X4 =3X8Oil .5X4 ns5X6m3X8 1113X3 111.5X4 l— 2' i 36'812 Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height 25.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist 0 to h/2 C&C Dist a: 3.87 ft Loc, from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; T1 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W1 2x6 SP #2; W2 2x4 SP M-30; W7 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X3 except as noted. (**) 1 plate(s) require special positioning. Refer to scaled plate plot details for special positioning requirements. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 21.17 28.50 BC 75 0.00 38.73 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss designed to support 2-0-0 top chord outlookers and cladding load not to exceed 8.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Additional Notes See Al Std Detail for gable wind bracing and other requirements. Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf. NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): 38'8"12 DetllCS1 Criteria PP Deflection in loc Udefl U# VERT(LQ: -0.215 D 999 360 VERT(CQ: 0.339 D 999 240 HORZ(LL): -0.114 D - - HORZ(TQ: 0.166 D - - Creep Factor. 2.0 Max TC CSI: 0.671 Max BC CSI: 0.340 Max Web CSI: 0.614 Weiaht: 457.8 Ibs Ver: 20.02.01 A.1209.11 Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. ♦ Maximum Reactions (Ibs), or *=PLF Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL Z* 237 /- /- /105 f78 /24 AO /-203 Wind reactions based on MWFRS Z Brg Width = 440 Min Req = - Bearing AQ is a rigid surface. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A- B 188 -120 M- N 738 - 9 B - C 167 -375 N - O 667 -70 C - D 180 -294 O - P 667 -70 D - E 172 -214 P - Q 667 -70 E - F 207 -161 Q - R 667 -70 F - G 170 -275 R - S 654 -64 G - H 269 - 305 S - T 607 - 95 H - I 242 -195 T - U 391 - 69 1-1 277 -144 U - V 198 -70 J - K 343 -106 V - W 87 -70 K - L 491 - 76 W - X 232 - 60 L-M 651 -49 X-Y 110 -77 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A -AQ 105 -103 AI-AH 403 -183 AQ-AP 144 -88 AH-AG 403 -183 AP -AO 714 -256 AG-AF 403 -183 AO -AN 714 -256 AF-AE 403 -183 AN -AM 414 -446 AE-AD 88 -32 AM -AL 414 -446 AD -AC 88 -32 AL -AK 414 -446 AC -AB 88 -32 AK-AJ 403 -183 AB -AA 88 -32 AJ-AI 403 -183 AA- Z 88 -32 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. AQ- B 808 -1118 BE- N 38 - 313 B-AR 759 -232 N-BF 78 -91 AR -AS 770 -23B BG-BH 77 -92 AS -AT 811 -263 BI-BJ 77 -91 AT -AP 810 -263 BK-AE 77 -92 AP- F 629 -930 AE- R 0 -276 F -AU 772 - 313 AE-BL 437 -197 AV-AW 700 -268 BL-BM 364 -150 AX-AY 738 -291 BN-BO 379 -162 AZ -BA 701 -269 BP-BQ 366 -154 BA -AK 769 -310 BR-W 347 -143 "WARNING— Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER r'BUYER') ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine be for the Too to be As Truss Design Engineering Specialty Engineer), the Too an acceptance the engineerinc, Manuel Martinez, P.E. connector plates shall used valid. a (i.e. seal on any represents of professional responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specially Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terns areas defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses— Reproduction of this document, in any fora4 Is prohibitetl without the written permission of A-1 Roof Trusses. Truss Truss Type Qty Ply 06/16/2021 A18GE GABL 1 1 �t Seal #: 2593 K-AK 371 -358 W-BS 76 -208 AK -BB 52 -313 BT-Z 83 -228 BC -BD 44 -274 Y-Z 155 -172 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. Gables Tens. Comp. C-AR 51 -39 AH-BG 0 -463 D -AS 212 -196 BH- P 0 -524 E-AT 0 -21 AG-BI 0 -529 AU- G 275 -358 BJ- Q 0 -508 AO -AV 173 -264 AF-BK 0 -507 AW- H 340 - 360 S -BL 107 -166 AM-AX 282 -294 BM -AD 696 -576 AY-1 469 -519 T -BN 669 -527 AL -AZ 545 -606 BOAC 436 -431 BA- J 125 -143 U -BP 448 -450 BB-AJ 531 -385 BQ-AB 260 -316 L-BC 486 -361 V-BR 277 -329 BD -AI 273 -336 BS-X 299 -337 M -BE 316 -320 AA-BT 316 -362 BF- O 0 -471 "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT' form. Verify design parameters and read moles on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine be As Truss Design Engineering Specialty Engineer), the seal on any TDD an acceptanceof the engineerinj Manuel Martinez, P.E. connector plates shall be used for the TDD to valid. a (i.e. represents professional responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitabilityand use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a'Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses — Reproduction of this document, in any form, is prohibded wdhout the written pernission of A-1 Roof Tmsses. Job: Truss Truss Type Qty Ply 06/16/2021 85072 B01GE GABL 1 1 Seal #: 2585 s'r s'2" F=4X4 SEAT PLATE REQ. 2' i14'4" 2' Loading Criteria (psf) TCLL: 20.00 TCDL: 15.00 BCLL: 0.00 BCDL: 10.00 Des Ld: 45.00 Des Ld:: 45.00 Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height 25.00 ft Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code:. TCDL: 5.0 psf Soffit 0.00 BCDL: 5.0 psf FBC 7th Ed. 2020 Res. Load Duration: 1.25 MWFRS Parallel Dist 0 to h/2 TPI Std: 2014 Spacing: 24.0 " C&C Dist a: 3.00 ft Rep Fac: Varies by Ld Case Loc. from endwall: Any FT/RT:10(0)/10(10) GCpi: 0.18 Plate Type(s): Wind Duration: 1.60 IWAVE Lumber Top chord: 2x4 SP #2; Bot chord- 2x4 SP #2; Webs: 2x4 SP #3; W1 2x6 SP #2; Plating Notes All plates are 1.5X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 18.33 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss designed to support 1-0-0 top chord outiookers and cladding load not to exceed 8.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&C member design. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. Additional Notes See Al Std Detail for gable wind bracing and other requirements. 18'4" Defl/CSI Criteria ♦ Maximum Reactions (Ibs), or.=PLF PP Deflection in loc L/defl L/# Gravity Non -Gravity VERT(LL): 0.034 T 816 360 Loc R+ / R- / Rh / Rw / U / RL T 305 A /- /258 /266 /302 VERT(CL): 0.056 T 502 240 HORZ(LL): 0.026 H - - T• 150 /- /- /80 /65 /- HORZ(TL): 0.032 H - - Wind reactions based on MWFRS Creep Factor. 2.0 T Brg Width = 8.0 Min Req = 1.5 Max TC CSI: 0.179 T Brg Width = 164 Min Req = - Max BC CSI: 0.189 Bearings T & T are a rigid surface. Bearing T requires a seat plate. Max Web CSI: 0.315 Weight: 109.2 Ibs Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. VIEW Ver: 21.01.01A.0521.20 A - B 282 -154 F - G 498 0 B-C 291 -115 G-H 334 -18 C - D 286 - 61 H -1 278 - 56 D - E 334 - 24 I - J 279 -108 E- F 499 0 J- K 275 -153 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-T 192 -235 P-O 217 -243 T - S 203 -245 O - N 212 -240 S - R 207 -242 N - M 206 -236 R - Q 213 -243 M - L 198 -231 Q - P 217 -243 L - K 191 -228 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. B - T 306 -206 L - J 305 -206 Maximum Gable Forces Per Ply (Ibs) Gables Tens.Comp. Gables Tens. Comp. C-S 201 -141 O-G 328 -298 D - R 260 - 232 N - H 260 - 232 E - Q 328 -298 M -1 201 -135 F - P 0 -423 —WARNING— Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verily design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any Too represents an acceptance of the professional engineerint Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPIA. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shag be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 PafkVl@W Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties ofthe Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineeris NOT the St Cloud, .FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright ®2016 A-1 Roof Trusses —Reproduction of this document, in any form Is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 85072 B02 COMN 1 1 '. Seal #: 2537 1 as2X4(A1) 97 C 1114X6(R) 9.2„ ti SEAT PLATE REG. SEAT PLATE REG. I""'_ 2' j 14'4" j 2' Loading Criteria (psf) Wind Criteria TCLL: 20.00 Wind Std: ASCE 7-16 TCDL: 15.00 Speed: 160 mph BCLL: 0.00 Enclosure: Closed BCDL: 10.00 Risk Category: 11 EXP: C Kzt: NA Des Ld: 45.00 Mean Height: 25.00 ft NCBCLL: 10.00 TCDL: 5.0 psf Soffit: 0.00 BCDL: 5.0 psf Load Duration: 1.25 MWFRS Parallel Dist: 0 to h/2 Spacing: 24.0 " C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W1 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use puriins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 18.33 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA- CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): 18'4" Defl/CSI Criteria PP Deflection in Ioc Udefl L/# VERT(LL): 0.006 C 999 360 VERT(CL): 0.013 C 999 240 HORZ(LL): -0.004 B - - HORZ(TQ: 0.005 B - - Creep Factor. 2.0 Max TC CSI: 0.677 Max BC CSI: 0.324 Max Web CSI: 0.126 Weiaht: 98.0 Ibs 20.02.01A.1209.11 ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ / R- / Rh / Rw 11.1 / RL H 888 A /- /669 /448 /268 F 888 /- A /669 /448 /- Wind reactions based on MWFRS H Brg Width = 8.0 Min Req = 1.5 F Brg Width = 8.0 Min Req = 1.5 Bearings H & F are a rigid surface. Bearings H & F require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 148 -144 C - D 468 - 600 B - C 468 -600 D - E 148 -144 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-H 117 -62 G-F 120 -86 H-G 288 -314 F-E 117 -62 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. H - B 748 -778 G - D 351 -78 B - G 347 -78 D - F 748 -778 C-G 152 -21 -WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT" forth. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shallbeused forthe TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerinj Manuel Martinez, P.E. responsibility for the design of the single Truss depicted an the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses —Reproduction of this document, in any form, is prohibited withoutthe written permission of A-1 Roof Trusses Job: Truss Truss Type Qty Ply 06/16/2021 85072 B03 COMN 2 1 '.M Seal #: 2543 9'2"-j- T2" =j C/s4X8(R1) 12 8 F7 n m io 03XB B D t404 T 2X4(A1)A W1 or 1 F H 12X =5X6 013X6 SEAT PLATE REQ. SEAT PLATE REQ. �-- 2' W4" J 164" Loading Criteria (pst) Wind Criteria Snow Criteria (Pg,Pf in PSF) Deft/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-16 Pg: NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# Gravity Non -Gravity TCDL: 15.00 Speed: 160 mph Pf. NA Ce: NA VERT(LL): 0.007 C 999 360 Loc R+ / R- / Rh / Rw / L1 / RL G 987 /_ /_ 1737 /277 /288 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): 0.017 C 999 240 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.004 B - - H 713 /- /- /449 /227 /- Des Ld: 45.00 EXP: C Kzt: NA HORZ L 0.006 B - - �) Wind reactions based on MWFRS Building Code: NCBCLL: 10.00 Mean Height 25.00 It Creep Factor. 2.0 G Brg Width = 8.0 Min Re 1.5 Soffit. 0.00 TCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.967 H Brg Width = 8.0 Min Req = 1.5 BCDL: 5.0 psf Bearings G & H are a rigid surface. Load Duration: 1.25 MWFRS Parallel Dist h/2 to h TPI Std: 2014 Max BC CSI: 0.515 Bearings G & H require a seat plate. Spacing: 25.9 " C&C Dist a: 3.00 It Rep Fac: No Max Web CSI: 0.350 Maximum Top Chord Forces Per Ply (Ibs) Loc. from endwall: not in 9.62 ft FT/RT:10(0)/10(10) Weight 91.0 lbs Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.18 Plate Type(s): VIEW Ver. 20.02.01A.1209.11 A- B 170 -136 C - D 346 -707 B - C 356 -705 Wind Duration: 1.60 WAVE Lumber Top chord: 2x4 SP #2; Maximum Bot Chord Forces Per Ply (Ibs) Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W1 2x6 SP #2; Chords Tens.Comp. Chords Tens. Comp. A - G 117 -77 F - E 73 - 55 Purlins G - F 279 - 343 In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) Maximum Web Forces Per Ply (Ibs) TC 24 0.00 9.17 Webs Tens.Comp. Webs Tens. Comp. G - B 545 - 872 F - D 410 - 97 TC 24 9.17 16.33 BC 75 0.00 16.33 Apply purlins to any chords above or below fillers B - F 432 -78 D - E 351 -648 at 24" OC unless shown otherwise above. C - F 192 -16 Wind Wind loads based on MWFRS with additional C&C member design. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER', GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine be be As Truss Design Engineering Specialty Engineer), the TOD the engineerin Manuel Martinez, P.E. connector plates shall used for the TDD to valid. a (i.e. seal on any represents an acceptance of professional responsibility for the design of the single Truss depleted on the TDD only, underTPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use or the Truss, including handling, storage, installation and bracing shall be the responsibility ofthe Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms areas defined in TPI-1. Copyright 02016 A-1 RoolTrusses-Reproduction of this document, In any form, is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 85072 B04G COMN 1 2 E Seal #: 2576 �_ Loading Criteria (psf) TCLL: 20.00 TCDL: 15.00 BCLL: 0.00 BCDL: 10.00 Des Ld: 45.00 NCBCLL: 0.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " 92' i 77 --{ ti SEAT PLATE REQ. SEAT PLATE REQ. i 16'4' Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 25.00 It TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x8 SP 2400f-1.8E; Webs: 2x8 SP 2400f-1.8E; W2,W4 2x4 SP #3; W3 2x4 SP #2; Nailnote Nail Schedule:0.131"x3", min. nails Top Chord: 1 Row @12.00" o.c. Bot Chord: 2 Rows @ 5.00" o.c. (Each Row) Webs : 1 Row @ 4" o.c. Use equal spacing between rows and stagger nails in each row to avoid splitting. (1) 1/2" bolts may be used for (2) 0.131"x3", min. nails on The Bottom Chord Only. Special Loads -(Lumber Dur.Fac =1.25 / Plate Dur.Fac.=1.25) TC: From 76 pif at 0.00 to 76 plf at 9.17 TC: From 38 plf at 9.17 to 38 pif at 13.23 TC: From 76 pif at 13.23 to 76 pif at 16.33 BC: From 20 pif at 0.00 to 20 pif at 9.17 BC: From 10 pif at 9.17 to 10 pif at 16.33 BC: 5111 lb Conc. Load at 9.30 BC: 1571 lb Conc. Load at 11.23,13.23 BC: 1552 lb Conc. Load at 15.23 Purlins In lieu of structural panels or rigid ceiling use puriins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.00 16.33 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): 14'4" 1'11.3 __2' V { 51119 1571V 1571M 15 Defl/CSI Criteria PP Deflection in loc Udell L/# VERT(LL): -0.058 F 999 360 VERT(CL): 0.105 F 999 240 HORZ(LL): -0.005 D - - HORZ(TQ: 0.007 D - - Creep Factor. 2.0 Max TC CSI: 0.569 Max BC CSI: 0.582 Max Web CSI: 0.808 Weight: 240.8 Ibs Ver. 21.01.01A.0521.20 Wind Wind loads and reactions based on MWFRS. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. T 1 ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL G 4452 A A /- /2604 A H 6695 A A A /3381 A Wind reactions based on MWFRS G Brg Width = 8.0 Min Req = 1.8 H Brg Width = 8.0 Min Req = 2.8 Bearings G & H are a rigid surface. Bearings G & H require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 81 -35 C - D 1684 -2890 B - C 1690 -2898 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - G 41 -25 F - E 505 -247 G - F 292 -200 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. G - B 1376 -2347 F - D 1875 -1130 B - F 2122 -1195 D - E 1194 -2011 C - F 2934 -1653 -WARNING- Please thoroughly reviewthe "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT' form. Verity design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal an any TDD represents an acceptance of the professional engineefin Manuel Martinez, P.E. responsibility for the design of the single Truss depicted an the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the - # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 02016 A-1 Roof Trusses - Reproduction of this document, in any tom; is prohlbded without the written permission of A-1 Roof Trusses. Job: 85072 Truss Truss Type Qty I Ply B05G I MONO 1 1 2 06/16/2021 Seal #: 2582 1 Loading Criteria (psf) TCLL: 20.00 TCDL: 15.00 BCLL: 0.00 BCDL: 10.00 Des Ld: 45.00 NCBCLL: 0.00 Soffit: 0.00 Load Duration: 1.25 SDacina: 24.0 " M_% i 9'10 i-iT1°4-�i SEAT PLATE REQ. SEAT PLATE REG. �---- 2.1 WY4 -r Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height. 25.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwail: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP M-30; T2 2x4 SP #2; Bot chord: 2x8 SP 2400f-1.8E; Webs: 2x8 SP 2400f-1.8E; W2,W4 2x4 SP #3; W3 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Nailnote Nail Schedule:0.131"x3", min, nails Top Chord: 1 Row @12.00" D.C. Bot Chord: 2 Rows @ 5.00" D.C. (Each Row) Webs : 1 Row @ 4" D.C. Use equal spacing between rows and stagger nails in each row to avoid splitting. (1) 1/2" bolts may be used for (2) 0.131"x3", min. nails on The Bottom Chord Only. Special Loads -(Lumber Dur.Fac =1.25 / Plate Dur.Fac.=1.25) TC: From 66 plf at 0.00 to 66 plf at 16.27 BC: From 20 plf at 0.00 to 20 plf at 9.17 BC: From 10 plf at 9.17 to 10 pif at 16.27 PLB: From 15 plf at 9.99 to 15 plf at 12.59 BC: 5327 lb Conc. Load at 9.30 BC: 1613 lb Conc. Load at 11.23 BC: 1615 lb Conc. Load at 13.23 BC: 1601 lb Conc. Load at 15.23 Plating Notes All plates are 4X4(A1) except as noted. 3w Criteria (Pg,Pf in PSF) NA Ct: NA CAT: NA NA Ce: NA NA Cs: NA )w Duration: NA Iding Code: 7th Ed. 2020 Res. Std: 2014 Fee: Varies by Ld Case 2T:10(0)/10(10) e Type(s): 5327a 181 1615M 1601 Defl/CSI Criteria PP Deflection in loc Udefl U# VERT(LL): -0.058 G 999 360 VERT(CQ: 0.109 G 999 240 HORZ(LL): -0.005 F - - HORZ(TL): 0.009 F - - Creep Factor. 2.0 Max TC CSI: 0.537 Max BC CSI: 0.718 Max Web CSI: 0.953 Weiaht: 280.0 Ibs EW Ver. 21.01.01A.0521.20 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 9.17 16.27 BC 120 0.00 16.27 Apply pudins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. I 1 ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ / R- / Rh / Rw / U / RL H 4534 /- /- /- 12514 /- 1 6995 /- /- /- /3515 /- Wind reactions based on MWFRS H Brg Width = 8.0 Min Req = 1.9 1 Brg Width = 7.2 Min Req = 2.9 Bearings H & I are a rigid surface. Bearings H & I require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-B 105 -63 C-D 0 0 B-D 1700-3013 D-E 0 0 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - H 79 - 52 G - F 1814 -1022 H - G 334 - 203 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. H - B 1362 -2435 D - F 1569 -2783 B - G 2192 -1208 E - F 53 - 96 G - D 3562 -1993 "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER CBUYEFr) ACKNOWLEDGMENT" form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TOD, only Alpine be for TDD be As Truss Design Engineering Specialty Engineer), the Too an acceptance of the engineering Manuel Martinez, P.E. connector plates shall used the to valid. a (i.e. seal on any represents professional responsibility for the design of the single Truss depicted on the TDD only, underTPI-1. The design assumptions, loading conditions, suitability and use ofthis Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-). The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineeris NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terns are as defined in TPI-1. Copyright 02016 A-1 Roof busses -Reproduction of this doormen; In any foml is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 0611612021 . 85072 B06 MONO 1 1 Seal #: 2525 ling Criteria (psf) L: 20.00 L: 15.00 L: 0.00 L: 10.00 Ld: 45.00 CLL: 10.00 t: 0.00 I Duration: 1.25 :inq: 24.0 " T i 92" 7'1"4 SEAT PLATE REC. SEAT PLATE REQ. i----- 2' — i 14'3"4 Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc, from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; T2 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W1 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 9.17 16.27 BC 75 0.00 16.27 Apply purlins to any chords above or below fillers at 24" CC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA [ding Code: 7th Ed. 2020 Res. Std: 2014 Fac: Yes RT:10(0)/10(10) e Type(s): 16'3"4 IICSI Criteria Deflection in loc L/defl L/# 2T(LL): 0.012 G 999 360 2T(CL): 0.031 G 999 240 RZ(LQ: -0.012 C - - RZ(TQ: 0.017 C - - ep Factor. 2.0 (TC CSI: 0.836 ( BC CSI: 0.583 ( Web CSI: 0.667 ght: 100.8 Ibs VIEW Ver. 20.02.01A.1209.11 ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL 1 912 /- /- 1739 1191 /318 J 658 A A /418 /381 /- Wind reactions based on MWFRS I Brg Width = 8.0 Min Req = 1.5 J Brg Width = 7.2 Min Req = 1.5 Bearings I & J are a rigid surface. Bearings I & J require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-B 136 -101 C-E 0 0 B - D 403 -627 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp_ Chords Tens. Comp. A -I 103 -78 H-G 184 -512 - H 184 -512 G - F 372 -444 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. I - B 586 - 815 C - F 608 - 509 B-G 318 -95 G-D 256 0 C - D 179 - 50 E - F 475 - 256 -WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER) ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (Too) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering.(i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerinc Manuel Martinez, P.E. responsibility for the design of the single Truss depicted an the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the Too and any field use of the Truss, Including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkVieW Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright ® 2016 A-1 Roof Trusses—Reproductlon of this document in any form, is prohib@ed without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Oty Ply 06/16/2021 = 85072 B07 HIPM 1 1 '.c Seal #: 2522 8'0"4 — —t ling Criteria (psf) L: 20.00 L: 15.00 L: 0.00 L: 10.00 Ld: 45.00 �CLL: 10.00 t 0.00 I Duration: 1.25 :ing: 24.0 " I SEAT PLATE RED. SEAT PLATE RED. I~ 2' j 14'W4 Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt NA Mean Height 25.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist 0 to h/2 C&C Dist a: 3.00 It Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; T2 2x6 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP 93; W1 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 8.25 16.27 BC 75 0.00 16.27 Apply puffins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. 16'W'4 3w Criteria (Pg,Pf in PSF) Def11CSI Criteria NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# NA Ce: NA VERT(LL): -0.012 C 999 360 NA Cs: NA VERT(CL): 0.022 C 999 240 )w Duration: NA HORZ(LL): -0.010 C - - HORZ(TL): 0.011 C - - ilding Code: Creep Factor. 2.0 3 7th Ed. 2020 Res. Max TC CSI: 0.784 Std: 2014 Max BC CSI: 0.598 3 Fac: Yes Max Web CSI: 0.827 RT:10(0)/10(10) Weight: 106.4 lbs Is Type(s): VIEW Ver: 20.02.01A.1209.11 NX T 1 ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL G 912 /- !- f731 /383 1403 H 658 A A /400 1449 /- Wind reactions based on MWFRS G Brg Width = 8.0 Min Req = 1.5 H Brg Width = 7.2 Min Req = 1.5 Bearings G & H are a rigid surface. Bearings G & H require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 191 -139 C - D 592 -472 B - C 515 -663 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-G 133 -115 F-E 0 0 G-F 84 -418 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. G - B 611 - 836 F - D 569 - 714 B - F 469 -269 D - E 913 -591 F - C 551 - 282 "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'j, GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Thus Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering Q.e. Specialty Engineer), the seal on any TDD represents an acceptance ofthe professional engineering Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, underTPF-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context ofthe IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility ofthe Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms areas defined In TPI-1. Copyright 02016 A-1 Roof Trusses —Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 4 85072 B08G HIPM 1 1 Seal #: 2513 2190 210+ 210# 21coo + 210# 1,70 99, ling Criteria (psf) L: 20.00 L: 15.00 L: 0.00 L: 10.00 Ld: 45.00 CLL: 10.00 t: 0.00 I Duration: 1.25 :ina: 24.0 " T SEAT PLATE REQ. 1� 2' 1474 Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; T2 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W1 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Special Loads (Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 76 plf at 0.00 to 76 pif at 6.75 TC: From 38 plf at 6.75 to 38 pif at 16.27 BC: From 20 pif at 0.00 to 20 pif at 6.75 BC: From 10 plf at 6.75 to 10 pif at 16.27 TC: 219 lb Conc. Load at 6.75 TC: 210lb Conc. Load at 8.55,10.55,12.55,14.55 TC: 157 lb Conc. Load at 16.21 BC: 100 lb Conc. Load at 6.75 BC: 114 lb Conc. Load at 8.55,10.55,12.55,14.55 BC: 33 lb Conc. Load at 16.21 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) TC 24 6.75 16.27 BC 72 0.00 16.27 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. 16'3"4 -I r19"812­t^2' 2­t1T16j 114# 100# 1149 1140 Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) Pg: NA Ct NA CAT: NA PP Deflection in loc Udefl U# Gravity Non -Gravity Pf. NA Ce: NA VERT(LL): -0.041 D 999 360 Loc R+ / R- / Rh / Rw / U / RL J 1415 /- /- A /1169 !- Lu: NA Cs: NA VERT(CL): 0.050 D 999 240 Snow Duration: NA HORZ(LL): -0.012 C - - K 1505 /- /- A /1297 /- HORZ(TL): 0.014 C - - Creep Factor. 2.0 Wind reactions based on MWFRS J Brg Width = 8.0 Min Req = 1.7 Building Code: FBC 7th Ed. 2020 Res. Max TC CSI: 0.548 K Brg Width = 7.2 Min Req = 1.8 TPI Std: 2014 Max BC CSI: 0.987 Bearings J & K are a rigid surface. Rep Fac: Varies by Ld Case Max Web CSI: 0.600 Bearing J requires a seat plate. FT/RT:10(0)/10(10) Weight: 105.0Ibs Maximum Top Chord Forces Per Ply (Ibs) Plate Type(s): Chords Tens.Comp. Chords Tens. Comp. VIEW Ver. 20.02.01A.1209.11 A - B 203 -120 C - D 920-1068 B-C 1137 -1216 D-E 919 -1067 WAVE Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-J 53 -120 H-G 941 -891 J-1 71 -48 G-F 0 0 1-H 941 -891 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. J - B 1197 -1343 G - E 1487 -1281 B - 1 979 -912 D - G 833 -791 C - 1 120 -122 E - F 1284 -1386 C - G 203 -38 "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'l; GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering Q:e. Specialty Engineer), the seal an any Too represents an acceptance of the professional engineefin,c Manuel Martinez; P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BBC]) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 02016 A-1 Roof Trusses -Reproduction of this document, In any fore, Is prohibited withoutthe written permission of A•1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 = 85072 C01 GE GABL 1 1 Seal #: 2588 J ling Criteria (psf) L: 20.00 L: 15.00 L: 0.00 L: 10.00 Ld: 45.00 CLL: 10.00 t 0.00 I Duration: 1.25 :inn: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 25.00 It TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist 0 to h/2 C&C Dist a: 3.00 It Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W1 2x6 SP #2; Plating Notes All plates are 1.5X3 except as noted. Puffins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 17.50 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss designed to support 1-0-0 top chord outlookers and cladding load not to exceed 8.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&C member design. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. F=4X4 SEAT PLATE REQ. )w Criteria (Pg,Pf in PSF) Def 1CSi Criteria ♦ Maximum Reactions (Ibs), or.=PLF NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# Gravity Non -Gravity NA Ce: NA VERT(LL): 0.032 T 758 360 Loc R+ / R- / Rh / Rw / L1 / RL T` 149 !- A 183 /66 122 NA Cs: NA VERT(CL): 0.050 L 556 240 )w Duration: NA HORZ(LL): -0.024 E - - M 340 A !- /310 /340 /- HORZ(TL): 0.030 E - - Creep Factor. 2.0 Wind reactions based on MWFRS T Brg Width =154 Min Req = - ilding Code: 7th Ed. 2020 Res. Max TC CSI: 0.177 M Brg Width = 8.0 Min Req = 1.5 Std: 2014 Max BC CSI: 0.178 Bearings T & M are a rigid surface. Bearing M requires a seat plate. 3 Fac: Varies by Ld Case Max Web CSI: 0.283 RT:10(0)/10(10) Weight: 109.2 Ibs Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. to Type(s): VIEW Ver: 21.01.01A.0521.20 A - B 271 -155 F - G 479 0 B - C 278 -123 G - H 310 - 23 ME C - D 275 -65 H - I 275 -65 D-E 310 -23 I-J 278 -123 E- F 479 0 J- K 271 -155 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - T 192 -223 P - O 219 -238 T - S 198 -225 O - N 213 - 235 S - R 207 -231 N - M 207 -231 R - Q 213 - 235 M - L 198 - 225 Q - P 219 -238 L - K 192 -223 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. B - T 331 -204 L - J 331 -207 Maximum Gable Forces Per Ply (Ibs) Gables Tens.Comp. Gables Tens. Comp. C - S 192 -130 O - G 337 - 294 D - R 267 - 220 N - H 267 - 220 E - Q 337 - 294 M -1 192 -130 F - P 0 -416 "WARNING— Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (rDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine be for the TDD to be As Truss Design Engineering Specialty Engineer), the on any TDD an acceptance of the engineednE Manuel Martinez, P.E. connector plates shall used valid. a (i.e. seal represents professional responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owners authorized agent or the Buli ing Designer, in the Conte d of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of b the Truss, including handling, storage, installation and racing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terns are as defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses— Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Job: 85072 Truss =131- s Type CO2GE Qty I Ply I 06/16/2021 Seal#: 2591 Loading Criteria (psf) TCLL: 20.00 TCDL: 15.00 BCLL: 0.00 BCDL: 10.00 Des Ld: 45.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " I T. SEAT PLATE REQ. I^ 2' 26' j 2' -1 Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; T3 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W1 2x6 SP #2; W6 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Plating Notes All plates are 1.5X3 except as noted. (") 1 plate(s) require special positioning. Refer to scaled plate plot details for special positioning requirements. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 30.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss designed to support 1-0-0 top chord outlookers and cladding load not to exceed 8.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Additional Notes See Al Std Detail for gable wind bracing and other requirements. Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf. NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): 30' Deg/CSI Criteria PP Deflection in loc Udefl U# VERT(LL): -0.083 M 999 360 VERT(CL): 0.182 M 835 240 HORZ(LL): 0.059 M - - HORZ(TL): 0.109 M - - Creep Factor. 2.0 Max TC CSI: 0.681 Max BC CSI: 0.325 Max Web CSI: 0.617 Weight: 260.41bs 21.01.01 A.0521.20 Wind Wind loads based on MWFRS with additional C&C member design. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. ♦ Maximum Reactions (Ibs), or •=PLF Gravity Non -Gravity Loc R+ / R- / Rh / Rw / U / RL AA'244 /- /- /118 /102 /38 S 1046 A /- /700 /385 /- Wind reactions based on MWFRS AA Brg Width =158 Min Req = - S Brg Width = 8.0 Min Req = 1.5 Bearings AA & S are a rigid surface. Bearing S requires a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-B 258 -161 J-K 334 -15 B- C 248 -247 K- L 306 0 C- D 178 -162 L- M 258 - 5 D-E 193 -117 M-N 171 -31 E - F 185 -96 N - O 206 -201 F - G 206 -94 O - P 250 -351 G - H 166 - 88 P - Q 243 -731 H-I 231 -81 Q-R 159 -140 1-1 279 - 37 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A -AA 184 -192 W - V 366 - 309 AA- Z 378 -491 V - U 447 -16 Z - Y 378 -491 U - T 447 -16 Y - X 366 - 309 T - S 99 - 69 X - W 366 - 309 S - R 125 - 88 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. AA- B 70 -237 AJ- V 351 -223 B -AB 266 - 93 K - V 0 -531 AC -AD 260 - 82 V -AK 689 - 920 AD-AE 269 -97 AK -AL 643 -83Q AE- Y 273 -104 AL -AM 571 -735 Y - G 26 -257 AM- O 690 - 877 G-AF 312 -153 O-T 218 -33 AG-AH 321 -169 T - Q 365 -25. AI-AJ 294 -117 Q - S 521 - 996 i Maximum Gable Forces Per Ply (Ibs) Gables Tens.Comp. Gables Tens. Comp. C -AB 307 - 343 AH- 1 278 - 396 Z-AC 466 -532 W-AI 319 -474 D -AD 118 -133 AJ- J 80 -147 "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'),. GENERALTERMS and CONDITIONS CUSTOMER ("BUYER) ACKNOWLEDGMENT' form Verily design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine ' connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer); the seal on any TDD represents an acceptance of the professional engineedn Manuel Martinez, P.E. responsibility for the design of the single Truss depicted an the Too only, underTPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authodzed agent orthe'Suilding Designer, in the contend of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage,'instaflation and bracing shag be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 Par1(VIBW Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terns are as defined in TPI-1. Copyright ® 2016 A-1 Roof Trusses— Reproduction of this document, in any fern, is prohibited without the written permission of A-1 Roof Trusses. Truss Truss Type Qty Ply 06/16/2021 CO2GE GABL 1 1 Seal #: 2591 .4904 a E -AE 50 -76 L -AK 64 -124 AF- H 2 -40 M -AL 100 -132 X -AG 0 -20 N -AM 197 -164 y" "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ('SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ('BUYER') ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineering Manuel Martinez, P.E. responsibifity for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use ofthe Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designerand Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agmed.upon in writing by all parties involved. The Specialty Engineeris NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 02016 A-1 Roof Trusses —Reproduction of this document, in any form, is prohibited without the wriaen permission of A-1 Roof Trusses. Job: Truss Truss Type oty Ply 06/16/2021 = 85072 CO3 COMN 6 1 Seal #: 2580 SEAT PLATE REQ. SEAT PLATE REM �` 2' 20'j z —I Loading Criteria (psi) TCLL: 20.00 TCDL: 15.00 BCLL: 0.00 BCDL: 10.00 Des Ld: 45.00 NCBCLL: 10.00 Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 25.00 It Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: Soffit: 0.00 TCDL: 5.0 psf BCDL: 5.0 psf FBC 7th Ed. 2020 Res. Load Duration: 1.25 MWFRS Parallel Dist: 0 to h/2 TPI Std: 2014 Spacing: 24.0 " C&C Dist a: 3.00 ft Rep Fac: Yes Loc. from endwall: Any FT/RT:10(0)/10(10) GCpi: 0.18 Plate Type(s): Wind Duration: 1.60 WAVE Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B2 2x4 SP 2400f-2.0E + SP M-31; Webs: 2x4 SP #3; W1 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 30.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom' chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Left and right cantilevers are exposed to wind Wind loading based on both gable and hip roof types. — 30' Deft/CSI Criteria ♦ Maximum Reactions (Ibs) PP Deflection in loc Udefl U# Gravity Non -Gravity VERT(LL): -0.030 J 999 360 Loc R+ / R- 1 Rh / Rw 11.1 / RL L 1445 1- /- /1036 f750 1440 VERT(CL): 0.0661 999 240 HORZ(LL): -0.017 C - - H 1445 /- A 11036 /750 /- HORZ(TL): 0.037 F - - Wind reactions based on MWFRS Creep Factor. 2.0 L Brg Width = 8.0 Min Req = 1.7 Max TC CSI: 0.914 H Brg Width = 8.0 Min Req = 1.7 Max BC CSI: 0.710 Bearings L & H are a rigid surface. Max Web CSI: 0.657 Bearings L & H require a seat plate. Weight: 179.2 lbs Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. VIEW Ver. 20.02.01A.1209.11 A - B 186 -160 D - E 903 -1227 B - C 252 -84 E - F 252 -83 C - D 903 -1227 F - G 186 -160 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A- K 150 -130 I- H 932 -381 I K - J 932 - 389 H - G 150 -130 J-1 738 -137 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. B - K 303 -248 D -1 414 -266 K - C 796 -1501 I - E 382 - 216 C - J 382 -216 E - H 796 -1501 J - D 413 - 266 H - F 303 - 248 **WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER"), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT' form. Verify design. parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance ofthe professional engineeenc Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibili ies and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specially Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses- Reproduction of this document, in any form, is pmhibfled without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Oty Ply 06/16/2021 85072 C04 COMN 4 1 Seal #: 2583 Loading Criteria (psf) TCLL: 20.00 TCDL: 15.00 BCLL: 0.00 BCDL: 10.00 Des Ld: 45.00 NCBCLL: 10.00 Soffit 0.00 Load Duration: 1.25 SDacino: 24.0 " b -2X4(A1 15, .5X3 SEAT PLATE REC. SEAT PLATE REQ. Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt NA Mean Height 25.00 it TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist h/2 to h C&C Dist a: 3.00 it Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; B2 2x4 SP M-30; Webs: 2x4 SP #3; W1 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in cc) Start(ft) End(ft) BC 75 0.00 28.00 Apply puriins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss passed check for 20 psf additional bottom chord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&C member design. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. T a 1 Snow Criteria (Pg,Pf in PSF) Defl/CSi Criteria • Maximum Reactions (Ibs) Pg: NA Ct: NA CAT: NA PP Deflection in Loc Udefl U# Gravity Non -Gravity Pt NA Ce: NA VERT(LL): 0.031 H 999 360 Loc R+ / R- / Rh / Rw / U / RL K 1479 /- /- /1055 /439 /439 Lu: NA Cs: NA VERT(CL): 0.077 H 999 240 Snow Duration: NA HORZ(LL): 0.018 F - - L 1214 /- /- 1783 /383 A HORZ(TL): 0.043 F - - Creep Factor. 2.0 Wind reactions based on MWFRS K Brg Width = 8.0 Min Req = 1.7 Building Code: FBC 7th Ed. 2020 Res. Max TC CSI: 0.797 L Brg Width = 8.0 Min Req = 1.5 TPI Std: 2014 Max BC CSI: 0.797 Bearings K & L are a rigid surface. Bearings K & L require a seat plate. Rep Fac: Yes Max Web CSI: 0.600 Maximum Top Chord Forces Per Ply (Ibs) FT/RT:10(0)/10(10) Weight: 170.8 Ibs Chords Tens.Comp. Chords Tens. Comp. Plate Type(s): IVIEW Ver: 20.02.01A.1209.11 A - B 184 -149 D - E 758 -1342 B-C 251 -86 E-F 156 -119 WAVE C - D 736 -1277 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - J 135 -129 I - H 787 -135 J -1 969 -381 H - G 1080 -423 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. B-J 245 -247 D-H 516 -243 J - C 635 -1548 H - E 366 - 301 C -1 325 - 211 E - G 568 -1445 I-D 405 -213 F-G 151 -164 —WARNING-. Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine Engineering Specialty Engineer), the TDD of the enginearinE Manuel Martinez, P.E. connector plates shall be used for the TDD to be valid. As a Truss Design (.e. seal on any represents an acceptance professional responsibility for the design of the single Truss depicted on the TDD only, underTPI-1. The design assumptions, loading conditions; suitability and use ofthis Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shag be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses— Reproduction of this document, in any fom% Is prohibited without the written pennission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06116/2021 85072 C05 COMN 4 1 Seal #: 2586 a 'do _ ling Criteria (psf) L: 20.00 L: 15.00 L: 0.00 L: 10.00 Ld: 45.00 CLL: 10.00 t: 0.00 I Duration: 1.25 :ing: 24.0 " b 7 SEAT 79 REQ. I--z j 2s I za' �— 12711 4'a'10 11711 �{ 5Dt � Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 25.00 it TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP M-30; B2 2x4 SP 2400f-2.OE + SP M-31; Webs: 2x4 SP #3; W1 2x6 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Special Loads -----(Lumber Dur.Fac =1.25 / Plate Dur.Fac.=1.25) TC: From 76 plf at 0.00 to 76 pif at 27.42 BC: From 20 pif at 0.00 to 20 pif at 27.42 BC: 50 lb Conc. Load at 12.06,16.78 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 28.00 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Hangers I Ties (J) Hanger Support Required, by others Wind Wind loads based on MWFRS with additional C&C member design. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. 11.5X4 T 1 Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) Pg: NA Ct: NA CAT: NA PP Deflection in loc Udell U# Gravity Non -Gravity Pf. NA Ce: NA VERT(LL): -0.035 H 999 360 Loc R+ / R- / Rh / Rw / U / RL K 1533 /- /- /1055 (774 /439 Lu: NA Cs: NA VERT(CL): 0.079 H 999 240 Snow Duration: NA HORZ(LL): -0.019 C - - G 1223 1- l- 1783 1653 1- HORZ(TL): 0.040 F - - Creep Factor. 2.0 Wind reactions based on MWFRS K Brg Width = 8.0 Min Req = 1.8 Building Code: FBC 7th Ed. 2020 Res. Max TC CSI: 0.921 G Brg Width = - Min Req = - TPI Std: 2014 Max BC CSI: 0.621 Bearing K is a rigid surface. Rep Fac: Varies by Ld Case Max Web CSI: 0.774 Bearing K requires a seat plate. FT/RT:10(0)/10(10) Weight: 170.8 lbs Maximum Top Chord Forces Per Ply (Ibs) Plate Type(s): Chords Tens.Comp. Chords Tens. Comp. VIEW Ver: 20.02.01A.1209.11 A - B 183 -148 D - E 955 -1419 B-C 262 -187 E-F 173 -117 WAVE C - D 924 -1360 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - J 135 -128 1 - H 829 -420 J -1 1023 -506 H - G 1132 -576 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. B - J 294 - 250 D - H 530 - 313 J - C 842 -1647 H - E 440 - 301 C -1 374 -211 E - G 776 -1529 - D 422 -258 F - G 175 -163 "WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ('SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT" form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerint Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPIA. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 02016 A-1 Roof Trusses - Reproduction of this document in any form, is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty I Ply 06/16/2021 85072 C06GE GABL 1 2 Seal #: 2567 'A_ Loading Criteria (psf) TCLL: 20.00 TCDL: 15.00 BCLL: 0.00 BCDL: 10.00 Des Ld: 45.00 NCBCLL: 0.00 Soffit 0.00 Load Duration: 1.25 SDacina: 24.0 " Lumber b 7 SEAT e' �0. SPAT 7E FMQ. 1'--7---}} T4' 17V Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height 25.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Top chord: 2x4 SP M-30; Bot chord: 2x6 SP 2400f--2.OE; Webs: 2x4 SP #3; W1 2x6 SP #2; W3 2x8 SP 2400f-1.8E; W4,W11 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced on member. Nailnote Nail Schedule:0.1 31 "x3", min. nails Top Chord: 1 Row @12.00" o.c. Bot Chord: 2 Rows @ 6.00" D.C. (Each Row) Webs : 1 Row @ 4" D.C. Use equal spacing between rows and stagger nails in each row to avoid splitting. (1)1/2" bolts may be used for (2) 0.131"x3", min. nails on The Bottom Chord Only. Special Loads -(Lumber Dur.Fac =1.25 / Plate Dur.Fac.=1.25) TC: From 92 plf at 0.00 to 135 plf at 8.09 TC: From 135 plf at 8.09 to 172 plf at 15.00 TC: From 172 plf at 15.00 to 103 plf at 21.09 TC: From 59 plf at 21.09 to 14 plf at 21.11 BC: From 10 plf at 0.00 to 10 plf at 28.00 BC: 1757 lb Conc. Load at 12.12,14.12,16.12,18.12 20.12,22.12,24.12,26.12 Plating Notes All plates are 1.5X3 except as noted. (") 1 plate(s) require special positioning. Refer to scaled plate plot details for special positioning requirements. "WARNING" Please thoroughly review the "A-1 ROOF Verify design parameters and read notes on this Truss Design Di connector plates shag be used for the TDD to be valid. As a Tru: responsibility for the design ofthe single Truss depicted on the T responsibility of the Owner, the Owner's authorized agent or the use of the Truss, including handling, storage, installation and bra guidelines of the Building Component Safety Information (BSCI) Designer, Specialty Engineer and Truss Manufacturer, unless otl Building Designer or Truss System Engineer of any building. All Copyright 0 2016 A-1 Roof Trusses- Reproduction of this document, in as 17M 17570 1 17570 1 17570 Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria Pg: NA Ct: NA CAT. NA PP Deflection in loc Udefl U# Pf. NA Ce: NA VERT(LL): -0.084 D 573 360 Lu: NA Cs: NA VERT(CL): 0.176 D 272 240 Snow Duration: NA HORZ(LQ: -0.060 D - - HORZ(TQ: 0.128 D - - Building Code: Creep Factor. 2.0 FBC 7th Ed. 2020 Res. Max TC CSI: 0.392 TPI Std: 2014 Max BC CSI: 0.539 Rep Fac: No Max Web CSI: 0.970 FT/RT:10(0)/10(10) Weight: 512.4 lbs Plate Type(s): VIEW Ver: 21.01.01A.0521.20 mnrA.rC Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 120 0.00 28.00 Apply pudins to any chords above or below fillers at 24" OC unless shown otherwise above. Hangers / Ties (J) Hanger Support Required, by others Loading Truss designed to support 1-0-0 top chord outlookers and cladding load not to exceed 8.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Additional Notes Negative reaction(s) of -576# MAX. from a non -wind load case requires uplift connection. See Maximum Reactions. See Al Sid Detail for gable wind bracing and other requirements. 17X6(R) T 1 ♦Maximum Reactions (Ibs), or.=PLF Gravity Non -Gravity Loc R+ /R- !Rh /Rw /U /RL V - A576 !- /- /39 /- V• - A52 /- /25 /- /- U 10404 !- /- /- 13807 /- P 7425 /- A /- /2849 A Wind reactions based on MWFRS V Brg Width = 8.0 Min Req = 1.5 V Brg Width = 88.0 Min Req = - U Brg Width = 8.0 Min Req = 1.5 P Brg Width = - Min Req = - Bearings V, V, & U are a rigid surface. Bearings V & U require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 97 -38 H - I 624 -1737 B-C 627 -193 I-J 591 -1651 C - D 650 -235 J - K 589 -1647 D - E 672 -254 K - L 620 -1722 E - F 659 -244 L - M 643 -1761 F - G 723 -286 M - N 1227 - 3198 G - H 662 -1815 N - O 1517 - 3942 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - V 20 -49 S - R 2591 - 962 V - U 27 -148 R - Q 3199 -1222 U-T 75 -252 Q-P 28 -12 T - S 2591 - 962 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. V - B 340 0 T -AF 844 - 2199 B - W 206 -531 AC- T 1587 -545 W - X 201 - 527 AC -AD 11 - 51 X - Y 208 - 535 AD-AE 11 - 51 Y-U 214 -542 AE-AF 11 -51 U - G 1582 -4245 AF- M 845 -2232 G - Z 2976 -1075 M - R 2547 - 896 Z -AA 11 - 51 R - N 333 - 862 Z - T 3013 -1099 N - Q 935 -263 AA -AB 11 - 50 Q - O 3390 -1288 AB -AC 11 -50 O-P 1290 -3311 J -AC 1562 - 551 Maximum Gable Forces Per Ply (Ibs) Gables Tens.Comp. Gables Tens. Comp. ELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine peering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerinE Manuel Martinez, P.E. TPI-I. The design assumptions, loading conditions, suitability and use ofthis Truss for any Building is the # 047182 er, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr 'I and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 a are as defined in TPI-1. ad without the written permission of A-1 Roof Trusses. Truss Truss Type Qty Ply 06/16/2021 = C06GE GABL 1 2 �99 Seal #: 2567 C-W 34 -17 1-AB 21 -5 D - X 30 - 56 AD- K 16 -13 E - Y 26 - 57 AE- L 46 -21 H -AA 85 -26 _T "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (rDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerinE Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty. Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright ®201a A-1 Roof Trusses —Reproduction of this document In any form, is prohibited without the wdlten permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 116111112121 _ 85072 D01 GABL 2 1 Seal #: 2597 �= r ling Criteria (psf) L: 20.00 L: 15.00 L: 0.00 L: 10.00 Ld: 45.00 CLL: 10.00 t 0.00 I Duration: 1.25 anq 24.0 " ,s1"2 01131 I-- 2'0°12 18713 Mind Criteria Mind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height 25.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist h to 2h C&C Dist a: 3.00 it Loc. from endwall: not in 10.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W2 2x4 SP #2; Plating Notes All plates are 1.5X3 except as noted. (•11 plate(s) require special positioning. Refer to scaled plate plot details for special positioning requirements. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 2.27 20.88 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Loading Truss designed to support 1-0-0 top chord outlookers and cladding load not to exceed 8.00 PSF one face and 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&C member design. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Additional Notes See Al Sid Detail for gable wind bracing and other requirements. Shim all supports to solid bearing. 18'9"13 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pt NA Ce: NA Deft/CSI Criteria PP Deflection in loc Udefl U# VERT(LQ: -0.086 A 218 36D ♦ Maximum Reactions (Ibs), or •=PLF Gravity Non -Gravity Loc R+ / R- / Rh / Rw / U / RL T* 127 /_ /_ /63 /66 /28 Lu: NA Cs: NA VERT(CQ: -0.107 A 175 240 Snow Duration: NA HORZ(LL): -0.022 A - - Wind reactions based on MWFRS HORZ(TQ: 0.025 A - - Creep Factor. 2.0 T Brg Width = 225 Min Req = - Bearing T is a rigid surface. Building Code: FBC 7th Ed. 2020 Res. Max TC CSI: 0.447 Maximum Top Chord Forces Per Ply (Ibs) TPI Std: 2014 Max BC CSI: 0.278 Chords Tens.Comp. Chords Tens. Comp. A _ B 423 -488 F - G 107 -139 Rep Fac: Varies by Ld Case Max Web CSI: 0.605 FT/RT:10(0)/10(10) Weight: 120.4 Ibs B _ C 97 -225 G - H 112 -119 Plate Type(s): I C - D 111 -200 H - I 117 -95 VIEW Ver: 21.01.01A.0521.20 WAVE D - E 111 -173 I - J 134 -78 E-F 103 -143 J-K 146 -59 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. T - S 253 -676 O - N 35 -147 S - R 255 -688 N - M 31 -140 R - Q 256 -680 M - L 37 -151 Q-P 34 -152 L-K 57 -180 P-O 34 -148 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A - U 488 -404 W - X 571 -230 U - T 192 - 259 Y - Q 569 - 229 U - B 150 - 248 Q - E 150 - 234 B - V 574 -232 I - N 106 -137 Maximum Gable Forces Per Ply (Ibs) Gables Tens.Comp. Gables Tens. Comp. V - C 181 -188 G - P 148 - 220 S - W 179 -190 H - O 161 -225 X - D 175 -252 J - L 335 -356 R - Y 172 -254 "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("Bl1YER'J ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerin Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPI-I. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the - # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPIA. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. Ali notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer Is NOT the St Cloud, FL. 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined Iry TPI-1. Copyright 0 2016 A-1 RoofTrusses—Reproduction of this document in any fomr, is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 0611612021 _ 85072 D02 VAL 5 1 Seal #: 2886 i—nrn Loading Criteria (psi) Wind Criteria TCLL: 20.00 Wind Std: ASCE 7-16 TCDL: 15.00 Speed: 160 mph BCLL: 0.00 Enclosure: Closed BCDL: 10.00 Risk Category: II EXP: C Kzt: NA Des Ld: 45.00 Mean Height: 25.00 ft NCBCLL: 10.00 TCDL: 5.0 psf Soffit: 0.00 BCDL: 5.0 psf Load Duration: 1.25 MWFRS Parallel Dist: h to 2h Spacing: 24.0 " C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W2 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 2.27 20.88 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Additional Notes See Al Std Detail for valley details. Shim all supports to solid bearing. 11FIV12 -0 1 ,i2i 20'10"9 Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs), or.=PLF Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Gravity Non -Gravity Pf: NA Ce: NA VERT(LL): 0.092 A 205 360 Loc R+ / R- / Rh / Rw / U / RL J• 99 /- A /58 /58 /24 Lu: NA Cs: NA VERT(CL): 0.106 G 999 240 Snow Duration: NA HORZ(LL): -0.027 G - - Wind reactions based on MWFRS HORZ(TL): 0.044 G - - Creep Factor. 2.0 J Brg Width = 225 Min Req = - Bearing J is a rigid surface. Building Code: FBC 7th Ed. 2020 Res. Max TC CSI: 0.679 Maximum Top Chord Forces Per Ply (Ibs) TPI Std: 2014 Max BC CSI: 0.529 Chords Tens.Comp. Chords Tens. Comp. A - B 358 - 339 D - E 239 -185 Rep Fac: Yes Max Web CSI: 0.640 FT/RT:10(0)/10(10) Weight: 92.4 Ibs B - C 244 -268 E - F 242 -130 Plate Type(s): C - D 191 -188 VIEW Ver. 20.02.01A.1209.11 WAVE Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. J -1 263 -655 H - G 44 -160 I - H 93 - 256 G - F 128 - 300 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. A - K 333 -344 B -1 658 -299 K - J 239 -175 I - C 422 -416 K - B 214 -174 E - H 458 -462 -WARNING- Please thoroughly review the "A-1 ROOF TRUSSES{" SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal an any TDD represents an acceptance of the professional engmeerin Manuel Martinez, P.E. responsibility for the design of the single Truss depleted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of. the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses— Repmduction of this document, In any foml is pmhibfted without the wdaen permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 85072 E01 MONO 1 1 Seal #: 2649 A111110�_ Loading Criteria (psf) TCLL: 20.00 TCDL: 15.00 BCLL: 0.00 BCDL: 10.00 Des Ld: 45.00 NCBCLL: 10.00 Soffit 0.00 Load Duration: 1.25 SDacina: 24.0 " -2x4(Al) T ,474 1 SEAT PLATE REQ. SEAT PLATE REC. 1--- 2' 12'6'4 i-- 3' 1 11'64 - Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height 25.00 it TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist h/2 to h C&C Dist a: 3.00 it Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bat chord: 2x4 SP #2; Webs: 2x4 SP #3; W1,W5 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 36 0.00 3.00 BC 75 3.00 14.39 Apply puffins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. 14'6"4 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT. NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): Defl/CSI Criteria PP Deflection in loc L/defl U# VERT(LL): 0.016 H 999 360 VERT(CQ: 0.027 D 999 240 HORZ(LL): -0.007 D - - HORZ(TL): 0.008 D - - Creep Factor. 2.0 Max TC CSI: 0.735 Max BC CSI: 0.589 Max Web CSI: 0.511 Weight: 86.8 Ibs VIEW Ver: 20.02.01A.1209.11 ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL J 849 A /- /924 /340 /349 F 521 /- /- /588 /305 /- Wind reactions based on MWFRS J Brg Width =12.0 Min Req = 1.5 F Brg Width = 6.2 Min Req = 1.5 Bearings J & F are a rigid surface. Bearings J & F require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 256 - 327 C - D 741 - 676 B - C 735 -737 D - E 99 -205 Maximum Bat Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-1 329 -201 H - G 723 -999 1- H 46 - 548 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. B - I 784 -709 D - G 952 -691 B - H 866 - 846 G - F 775 - 588 H - D 264 - 307 G - E 273 -195 "WARNING— Please thoroughly review the "A-1 ROOF TRUSSES r'SEI I ER). GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER) ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine. connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional endineefinE Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, underTPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context ofthe IRC, the IBC, local building code and TPI-1. The approval ofthe TDD and any field use of the Truss, including handling, storage, installation and bracing shag be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 02016 A-1 Roof Tmsses— Reproduction of this document, in any forM Is prohibRed wdhout the wdaen permission of A-1 Roof Trusses. Job: Truss Truss Type Oty Ply 06/16/2021 = 85072 HJ7 HIP_ 1 1 Seal #: 2495 Loading Criteria (psf) TCLL: 20.00 TCDL: 15.00 BCLL: 0.00 BCDL: 10.00 Des Ld: 45.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 25.00 It TCDL: 5.0 psf BCDL¢ 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 :SP 2400f-2.OE + SP M-31:; Bot chord: 2x4 :SP 2400f-2.0E + SP M-31:; Webs: 2x6 SP #2; W2 2x4 SP #3; Special Loads (Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25) TC: From 2 pif at 0.00 to 2 pif at 11.17 BC: From 20 pif at 0.00 to 20 plf at 3.78 BC: From 2 pif at 3.78 to 2 pif at 11.17 TC: 183 lb Conc. Load at 3.78 TC: -119 lb Conc. Load at 4.01 TC: -34 lb Conc. Load at 6.28 TC: 88 lb Conc. Load at 7.34 TC: 63 lb Conc. Load at 8.78 TC: 189 lb Conc. Load at 10.68 BC: 51 lb Conc. Load at 3.78 BC: -133 lb Conc. Load at 4.01 BC: -67 lb Conc. Load at 6.28 BC: 28 lb Conc. Load at 7.34 BC: 4 lb Conc. Load at 8.78 BC: 98 lb Conc. Load at 10.68 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 11.17 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. SEAT PLATE REQ. � 37 1 a4# 63# r 8.4 4 18 -,4 11'2' I'-- 376 -4} � 2-3"4 - 1 1'5% � 1'l092 - j 674i, _.� 20# 40 9n# Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Varies by Ld Case FT/RT:10(0)/10(10) Plate Type(s): Defl/CSI Criteria PP Deflection in loc Udefl U# VERT(LL): -0.369 F 239 360 VERT(CL): -0.380 F 232 240 HORZ(LL): -0.189 C - - HORZ(TL): 0.192 C - - Creep Factor. 2.0 Max TC CSI: 0.350 Max BC CSI: 0.468 Max Web CSI: 0.291. Weight: 46.2 Ibs Ver. 20.02.01A.1209.11 ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL H 612 /- /- /- /929 A E 100 /- /0 /- /229 /0 D 219 /- /- A /334 /- Wind reactions based on MWFRS H Brg Width = 13.3 Min Req = 1.5 E Brg Width =1.5 Min Req = - D Brg Width =1.5 Min Req = - Bearing H is a rigid surface. Bearing H requires a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-B 234 -15 C-D 111 -124 B - C 354 - 67 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-G 26 -218 F-E 0 0 G - F 20 -207 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. B-G 352 -310 C-F 284 -39 -WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER"), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT" form. Verify design parameters and read notes on this Truss Design Drawing (Too) and the Specially Engineer reference sheet before use. Unless otherwise stated on the Too, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal an any TDD represents an acceptance of the professional engineedn Manuel Martinez, P.E. responsibility for the design of the single Truss depicted an the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. Ali capitalized terms are as defined in TPI-1. Copyright 02016 A-1 Roof Trusses- Repmduction of this document, in any form, Is prohibited without the written pernission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 _ 85072 A JACK 1 1 '._ Seal #: 2466 ling Criteria (psf) _: 20.00 L: 15.00 L: 0.00 L: 10.00 Ld: 45.00 CLL: 10.00 t 0.00 I Duration: 1.25 Ana: 24.0 " Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x6 SP #2; 2X4(A1) Structural Fascia by FOR Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCp!: 0.18 Wind Duration: 1.60 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(fl) BC 27 0.00 2.24 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Additional Notes """ BEARING ANALOG MODIFIED! I - 2'2"14 ,1) B SEAT PLATE REQ. �— 2' I— 2'2"14 ---{ Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) Pg: NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# Gravity Non -Gravity Pf. NA Ce: NA VERT(LL): 0.001 C 999 360 Loc R+ / R- / Rh / Rw / U / RL C 51 A 1152 /80 /39 /187 Lu: NA Cs: NA VERT(CL): 0.002 C 999 240 Snow Duration: NA HORZ(LL): 0.000 C - - B 183 /- 1152 /178 /101 /174 HORZ(TL): 0.001 C - - Creep Factor. 2.0 Wind reactions based on MWFRS C Brg Width = 2.9 Min Req = 1.5 Building Code: FBC 7th Ed. 2020 Res. Max TC CSI: 0.191 B Big Width =1.5 Min Req = - TPI Std: 2014 Max BC CSI: 0.085 Bearing C is a rigid surface. Bearing C requires a seat plate. Rep Fac: Yes Max Web CSI: 0.030 FT/RT:10(0)/10(10) Weight: 12.6 Ibs Maximum Top Chord Forces Per Ply (Ibs) Plate Type(s): Chords Tens.Comp. VIEW Ver: 20.02.01A.1209.11 WAX= A- B 220 -310 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. A - C 338 -174 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. B-C 0 0 "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (rDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shag be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerinE Manuel Martinez, P.E. responsibility for the design of the single Truss depicted an the TDD only, under TPIA, The design assumptions, loading conditions, suitability and use of this Truss for any Budding is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Bulling Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any, field use of the Truss, including handling. storage, installation and bracing shag be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safely fi fomtation (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineeris NOT the St Cloud, FL 34771 Budding Designer or Truss System Engineer of any building. All capitalized terms areas defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses— Reproduction of this document, in any form, Is prohibited without the written permission of A-1 Roof Tmsses. Job: Truss Truss Type Qty Ply 11611612021 4 - 85072 J2 JACK 1 1 '.o Seal #: 2484 LS30 skewable angle 12 C w/ 6- 1Od1.5" nails. 6 1111.5X4 B v =2 A4(A1) HB 7' N iLj1 F D LS30 sh 'able angle 1113X6 w/ 6- 10d1.5" nails. E Loading Criteria (psf) TCLL: 20.00 TCDL: 15.00 BCLL: 0.00 BCDL: 10.00 Des Ld: 45.00 NCBCLL: 10.00 Soffit: 0.00 Load Duration: 1.25 Spacing: 24.0 " Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x6 SP #2; Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 39 0.00 3.21 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Additional Notes Negative reaction(s) of-229# MAX. from a non -wind load case requires uplift connection. See Maximum Reactions. SEAT PLATE REQ. �2'{ f- 2'6"12.17'r14 f-- 378 Snow Criteria (Pg.Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) Pg: NA Ct: NA CAT: NA PP Deflection in loc Udell U# Gravity Non -Gravity Pf: NA Ce: NA VERT(LL): 0.044 E 704 360 Loc R+ / R- / Rh / Rw / U / RL F 746 /- /- /769 /252 /116 Lu: NA Cs: NA VERT(CL): 0.086 E 357 240 Snow Duration: NA HORZ(LL): -0.023 C - - D - /-222 /- /107 /274 A HORZ(TL): 0.047 C - - Creep Factor. 2.0 C - /-229 /- 176 /231 !- Wind reactions based on MWFRS Building Code: FBC 7th Ed. 2020 Res. Max TC CSI: 0.349 F Brg Width = 14.2 Min Req = 1.5 TPI Std: 2014 Max BC CSI: 0.313 D Brg Width =1.5 Min Req = - C Brg Width =1.5 Min Req = - Rep Fac: Yes Max Web CSI: 0.123 Bearing F is a rigidseatsurface. FT/RT:100 /10 10) () ( Weight: 15.4 Ibs I Bearing F requires a seat plate. Plate Type(s): Maximum Top Chord Forces Per Ply (Ibs) WAVE IVIEW Ver. 20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp. A-B 118 -267 B-C 138 -121 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-E 307 -75 E-D 0 0 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. B - E 773 -437 -WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER"), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT" form. Verity design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineedn Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use ofthis Truss for any Bullding is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the Too and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon In writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terns areas defined in TPIA. Copyright 02016 A-1 Roof Tmsses— Reproduction of this dmmerd, In any form, is prohibited without the wdnen pernission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 _ 85072 J3 JACK Seal #: 2469 2X4(A1) T 1 F 11E 13X6 D SEAT PLATE REQ. 2' -{ I— 2'6"12 ' 1 17"2 —� i- 3'8"14 Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Sid: ASCE 7-16 Pg: NA Ct: NA CAT: NA PP Deflection in Ioc Udell U# Gravity Non -Gravity TCDL: 15.00 Speed: 160 mph Pt NA Ce: NA VERT(LL): 0.054 E 569 360 Loc R+. / R- / Rh / Rw / U / RL BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): 0.099 E 311 240 F 571 /- A /588 /122 1181 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.039 C - - D - /-120 A /57 1151 A Des U 45.00 EXP: C Kzt: NA HORZ(TL): 0.069 C - - C - A114 A /38 /116 /- NCBCLL: 10.00 Mean Height: 25.00 ft Building Code: 9 Creep Factor. 2.0 P Wind reactions based on MWFRS Soffit 0.00 TCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.307 F Brg Width = 8.0 Min Req = 1.5 Load Duration: 1.25 BCDL: 5.0 psf MWFRS Parallel Dist 0 to h/2 TPI Std: 2014 Max BC CSI: 0.296 D Brg Width = 1.5 Min Req = - C Brg Width Min Req = - Spacing: 24.0 " C&C Dist a: 3.00 ft Rep Fac: Yes Max Web CSI: 0.069 d Bearing F is a rigid surface. Loc. from endwali: not in 4.50 ft FT/RT:10 (0)/10(10) Weight: 16.8 Ibs Bearing F requires a seat plate. GCpi: 0.18 Plate Type(s): I Maximum Top Chord Forces Per Ply (Ibs) Wind Duration: 1.60 WAVE VIEW Ver: 20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp. Lumber A-B 133 -247 B-C 21 -101 Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x6 SP #2; Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. Purlins A- E 286 - 89 E- D 0 0 In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) Maximum Web Forces Per Ply (Ibs ) BC 45 0.00 3.74 Webs Tens.Comp. Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. B - E 382 - 353 Wind Wind loads based on MWFRS with additional C&C member design. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. "WARNING- Please thoroughly review the "A-1 ROOF Verify design parameters and read notes on this Truss Design Di connector plates shag be used for the TDD to be valid. As a Tm1 responsibility for the design of the single Truss depicted on the T responsibility of the Owner, the Owner's authorized agent or the use of the Truss, including handling, storage, installation and bra guidelines of the Building Component Safety Information (BSCI) I Designer, Specialty Engineer and Truss Manufacturer, unless oil ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. TOD) and the Specially Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine in Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineefint Manuel Martinez, P.E. under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field i1i be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr !d by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 ad terms are as defined in TPI-1. ; prohibited without the wrlHen permission of A-1 Roof Trusses, Job: 85072 Truss Truss Type Qty I Ply J4 I JACK 1 1 06/16/2021 Seal #: 2487 ling Criteria (psf) L: 20.00 L: 15.00 L: 0.00 L: 10.00 Ld: 45.00 CLL: 10.00 t 0.00 I Duration: 1.25 :inq: 24.0 " Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x6 SP #2; 2X4(A1) / Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 it Loc, from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Purlins In lieu of structural panels or rigid ceiling use pudins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 70 0.00 5.87 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wnd loads based on MWFRS with additional C&C member design. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. SEAT PLATE REQ. �— 2' —'+ i 2'6"12 i 3712 5'10"8 )w Criteria (Pg,Pf in PSF) NA Ct: NA CAT: NA NA Ce: NA NA Cs: NA tw Duration: NA Iding Code: : 7th Ed. 2020 Res. Std: 2014 Fac: Yes RT:10(0)/10(10) e Type(s): C I/CSI Criteria Deflection in loc L/defl L/# RT(LL): 0.090 E 341 360 RT(CL): 0.131 E 234 240 RZ(LL): -0.050 C - - RZ(TL): 0.071 C - - ep Factor. 2.0 c TC CSI: 0.422 ( BC CSI: 0.348 ( Web CSI: 0.117 aht: 22.4 Ibs Ver. 20.02.01 A.1209.11 ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL F 487 /- /- /436 1130 1215 D 28 AI /- /32 /24 /- C 88 /- A /46 /135 A Wind reactions based on MWFRS F Brg Wdth = 8.0 Min Req = 1.5 D Brg Width =1.5 Min Req = - C Brg Width =1.5 Min Req = - Bearing F is a rigid surface. Bearing F requires a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 128 -425 B - C 39 -177 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-E 450 -91 E-D 0 0 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. B - E 665 - 348 -WARNING— Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seat on any TDD represents an acceptance of the professional engineedn Manuel Martinez, P.E. responsibility for the design,of the single Truss depicted on the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building, code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building .Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contractagreedvpon in writing by all parlies involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright ®2016 A-1 Roof Tmsses- Reproduction of this document, in any form,, is prohibited without the written permission of A-1 Roof Tmwe% Job: Truss Truss Type Qty Ply 06/16/2021 85072 J5 JACK 1 1 Seal #: 2472 Loading Criteria (psi) ,Wind Criteria TCLL: 20.00 Wind Std: ASCE 7-16 TCDL: 15.00 Speed: 160 mph BCLL: 0.00 Enclosure: Closed BCDL: 10.00 Risk Category: II EXP: C Kzt: NA Des Ld: 45.00 Mean Height 25.00 ft NCBCLL: 10.00 TCDL: 5.0 psf Soffit 0.00 BCDL: 5.0 psf Load Duration: 1.25 MWFRS Parallel Dist 0 to h/2 Spacing: 24.0 " C&C Dist a: 3.001t Loc. from endwali: not in 4.50 It GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Stari(ft) End(ft), BC 63 0.00 5.24 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wnd loads based on MWFRS with additional C&C member design. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. C SEAT PLATE REQ. �'— 2' i 2,6"12 .i' 2V2 �{ Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) Pg: NA Ct: NA CAT. NA PP Deflection in loc Udefi U# Gravity. Non -Gravity Pf: NA Ce: NA VERT(LL): 0.124 E• 247 360 Loc R+ / R- / Rh / Rw / U / RL F 493 A A /461 /59 /255 Lu: NA Cs: NA VERT(CL): 0.130 E 235 240 Snow Duration: NA HORZ(LL): -0.090 C - - D 4 A31 A /36 158 /- HORZ(TL): 0.115 C - - Creep Factor. 2.0 C 63 All A /45 /151 /- Wind reactions based on MWFRS Building Code: FBC 7th Ed. 2020 Res. Max TC.CSI: 0.393 F Brg Width = 8.0 Min Req = 1.5 TPI Std: 2014 Max BC CSI: 0.452 D Brg Width =1.5 Min Req = - C Brg Width =1.5 Min Req = - Rep Fac: Yes Max Web CSI: 0.100 Bearing F is a rigid surface. FT/RT:10(0)/10(10) Weight: 22.4 Ibs Bearing F requires a seat plate. Plate Type(s): Maximum Top Chord Forces Per Ply (Ibs) WAVE VIEW Ver: 20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp. A - B 152 - 340 B - C 35 -187 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A- E 369 -108 E- D 0 0 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. B - E 410 - 340 "WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SERER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine be for the TDD to be As Truss Design Engineering Specialty Engineer), the seal on any TDD represents an acceptance ofthe engineerin Manuel Martinez, P.E. connector plates shag used valid. a (i.e. professional responsibility for the design of the single Truss depicted on the TDD only, underTPl-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPF1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shag be the responsibility of the Building Designer and Contractor. Ali notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terns are as defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses—Repmduction of this document, In any form, Is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06116/2021 _ 85072 A JACK 1 1 Seal #: 2490 C ling Criteria (psf) L: 20.00 L: 15.00 L: 0.00 L: 10.00 Ld: 45.00 CLL: 10.00 t: 0.00 I Duration: 1.25 )inq: 24.0 " =-2X4(A1) Wind Criteria Wind Sid: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 it Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 :SP 2400f-2.OE + SP M-31:; Bot chord: 2x4 :SP 2400f-2.0E + SP M-31:; Webs: 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 8.54 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. SEAT PLATE REQ. �--- 2' --{ 2'6"12 8'6"8 V11"12 Dw Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Gravity Non -Gravity NA Ce: NA VERT(LL): 0.249 E 123 360 Loc R+ / R- / Rh / Rw / U / RL F 571 !- /- 1482 1168 /314 NA Cs: NA VERT(CL): 0.311 E 98 240 )w Duration: NA HORZ(LL): -0.138 C - - D 96 /- /- /53 /20 A HORZ(TL): 0.155 C - - Creep Factor. 2.0, C 189 A /- /134 /235 /- Wind reactions based on MWFRS ilding Code: 7th Ed. 2020 Res. Max TC CSI: 0.441 F Brg Width = 8.0 Min Req = 1.5 Std: 2014 Max BC CSI: 0.298 D Brg Width = 1.5 Min Req = - Fac: Yes Max Web CSI: 0.134 C Brg Width =1.5 Min Req = - Bearing F is a rigid surface. RT:10(0)/10(10) Weight: 32.2 Ibs Bearing F requires a seat plate. to Type(s): Maximum Top Chord Forces Per Ply (Ibs) ,VE VIEW Ver. 20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp. A - B 146 -390 B - C 85 -230 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-E 380 -100 E-D 0 0 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. B - E 558 -457 -WARNING- Please thoroughly reviewthe "A-1 ROOF TRUSSES ('SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ('BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (Too) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e.-Specialty Engineer), the seal on any Too represents an acceptance ofthe professional engineerinc Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, underTPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TOD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the .St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TP14. Copyright m 2016 A-1 Roof Trusses— Reproduction of this dommem, In any form, is prohibtied without the written permission of A-1 Roof Tmsses. Job: Truss Truss Type Qty Ply 06/16/2021 85072 R MONO 11 1 Seal #: 2525 A_ fi Loading Criteria (psl) TCLL: 20.00 TCDL: 15.00 BCLL: 0.00 BCDL: 10.00 Des Ld: 45.00 NCBCLL: 10.00 Soffit 0.00 Load Duration: 1.25 SDacinq: 24.0 " Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt NA Mean Height: 25.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist 0 to h/2 C&C Dist a: 3.00 It Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP M-30; Bot chord: 2x4 SP M-30; Webs: 2x6 SP #2; W2 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 110 0.00 9.17 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. 2x4(Al) U SEAT PLATE REQ. �- 2' --i c g,2" Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf. NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std: 2014 Rep Fac: Yes FT/RT:10(0)/10(10) Plate Type(s): Defi/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL): 0.222 G 125 360 VERT(CL): 0.285 G 98 240 HORZ(LL): -0.202 C - - HORZ(TL): 0.226 C - - Creep Factor. 2.0 Max TC CSI: 0.283 Max BC CSI: 0.731 Max Web CSI: 0.147 Weight: 40.6 Ibs VIEW Ver: 21.01.01A.0521.20 D ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL G 591 /- /- /496 /76 /448 D 165 /- /- /149 /180 1- E 142 A /0 /145 /192 /0 Wind reactions based on MWFRS G Brg Width = 8.0 Min Req = 1.5 D Brg Width =1.5 Min Req = - E Brg Width =1.5 Min Req = - Bearing G is a rigid surface. Bearing G requires a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-B 74 -271 C-D 92 -191 B - C 24 - 241 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-G 336 -67 F-E 0 0 G - F 95 - 277 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. B - G 147 - 348 C - F 494 -170 "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ('SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerinE Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPI.1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Binding Designer, in the context of the IRC, the IBC, local building code and TPH1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineeris NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright ®2016 A-1 Roof Trusses —Reproduction of this document, In any form, Is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 _ 85072 RA EJAC 4 1 Seal #: 2498 C 2X4(A1) / V] F SEAT PLATE REQ. � 2' 1 9 Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-16 Pg:.NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Gravity Non -Gravity TCDL: 15.00 Speed: 160 mph Pf: NA Ce: NA VERT(LL): 0.232 F 120 360 Loc R+ / R- / Rh / Rw / U / RL F 568 /- /- /477 /170 /331 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA. VERT(CL): -0.182 F 999 240 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(L'L): -0.134 B - - D 114 /- /- /67 /39 /- Des Ld: 45.00 C Kzt: HORZ(TL): 0.151 B - - C 210 /- /- /155 /239 /- BuildingCoder NCBCLL: 00 MeaEXP ean Height: 2500 ft . Creep Factor. 2.0 P Wind reactions based on MWFRS 0. Soffit: 0.00 TCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.987 F Brg Width = 8.0 Min Req = 1.5 Load Duration: 1.25 BCDL: 5.0 sf P MWFRS Parallel Dist: 0 to h/2 TPI Std: 2014 Max BC CSI: 0.742 D Brg Width = 1.5 Min Req = - C Brg Width = 1.5 Min Req = - Spacing: 24.0 " C&C Dist a: 3.00 ft Rep Fac: Yes Max Web CSI: 0.258 Bearing F is a rigid surface. Loc. from endwall: not in 4.50 ft FT/RT:10(0)/10(10) Weight: 37.8 Ibs Bearing F requires a seat plate. GCpi: 0.18 Plate Type(s): Maximum Top Chord Forces Per Ply (Ibs) Wind Duration: 1.60 WAVE IVIEWVer. 20.02.01A.1209.11 Chords Tens.Comp. Chords Tens. Comp. Lumber B 187 -148 B - C 94 -233 A - Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x6 SP #2; W2 2x4 SP #3; Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. Purlins A - F 152 -122 E - D 0 0 In lieu of structural panels or rigid ceiling use purlins F - E 62 -445 to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 9.00 Maximum Web Forces Per Ply (Ibs) Apply purlins to any chords above or below fillers Webs Tens.Comp. Webs Tens. Comp. at 24" OC unless shown otherwise above. F - B 205 -457 B - E 609 -89 Wind Wind loads based on MWFRS with additional C&C member design. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. **WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER"), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT" form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any Too represents an acceptance of the professional engineerin Manuel Martinez, P.E. responsibility for the design of the single Truss depicted an the TOO only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the conte# of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use ofthe Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designerand Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are. referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terns are as defined in TPI-1. Copyright 02016 A-1 Roof Trusses— Reproduction of this documem, in any form, is prohibited without the written permission of A-1 Roof Trusses. 4 Job: Truss Truss Type Qty Ply 06/16/2021 85072 J7B EJAC 1 1 A. Seal #: 2504 C 12 6 p 101.5X4 B HB 6'5"4 A T F D l0 X3 E SEAT Pj1TE REQ. 2, 6,4„ �---- 2'612 - -}- 65"4 -� Loading Criteria (pst) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs), or *=PLF TCLL: 20.00 Wind Std: ASCE 7-16 Fig: NA Ct: NA CAT. NA PP Deflection in loc Udefl U# Gravity Non -Gravity TCDL: 15.00 Speed: 160 mph Pf: NA Ce: NA VERT(LQ: 0.241 E 127 360 Loc R+ / R- / Rh / Rw / U / RL F 550 /- A 1437 /132 /311 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): 0.306 E 100 240 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.134 C - - D* 19 A A /12 /20 /- Des Ld: 45.00 EXP: C Kzt: NA HORZ(TL): 0.151 C - - D 33 /- /- /41 Building Code: NCBCLL: 10.00 Mean Height: 25.00 ft Creep Factor. 2.0 C 157 A /- /114 /200 A Soffit 0.00 TCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.562 Wind reactions based on MWFRS Load Duration: 1.25 BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 TPI Std: 2014 Max BC CSI: 0.434 F Brg Width = 76. D Brg Width = Min Req = 1.5 Min Req = - Spacing: 24.0 " C&C Dist a: 3.00 it Re Fac: Yes Rep Max Web CSI: 0.172 1.5 D Brg Width = .5 Min Req = - Loc. from endwall: not in 4.50 ft FT/RT:10(0)/10(10) Weight: 33.6 Ibs C Brg Width = 1.5 Min Req = - GCpi: 0.18 Plate Type(s): Bearings F & E are a rigid surface. IVIEW Ver: 20.02.01A.1209.11 Wind Duration: 1.60 WAVE Bearing F requires a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Lumber Top chord: 2x4 SP M-30; Chords Tens.Comp. Chords Tens. Comp. A - B 152 -400 B - C 70 -209 Bot chord: 2x4 SP M-30; Webs: 2x6 SP #2; Plating Notes Maximum Bot Chord Forces Per Ply (Ibs) All plates are 2X4(A1) except as noted. Chords Tens.Comp. Chords Tens. Comp. A- E 374 -101 E- D 0 0 Purlins In lieu of structural panels or rigid ceiling use purlins Maximum Web Forces Per Ply (Ibs) to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) Webs Tens.Comp. BC 75 0.00 9.00 B - E 634 -493 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (rDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance ofthe professional engineednE Manuel. Martinez, P.E. responsibility for the design ofthe single Truss depicted an the TDD only, underTPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval ofthe TDD and any field use ofthe Tmss, including handling, storage, installation and bracing shall be the responsibility ofthe Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms areas defined in TPIA. Copyright 02016 A-1 Roof Trusses- Reproducfion of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/1612021 85072 RC MONO 5 1 _ Seal #: 2540 '164 ME 1111.5X4 O , 12 %1.5X3C 8 m io in 1111.5X3B w1 =2X4(A1) A 1111.5X3 1113X6(R) E F SEAT PLATE REQ. 2' 7'2" 9'2" Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) TCLL: 20.00 Wind Std: ASCE 7-16 Pg: NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# Gravity Non -Gravity TCDL: 15.00 Speed: 160 mph Pf: NA Ce: NA VERT(LL): 0.073 F 384 360 Loc R+ / R- / Rh / Rw / U / RL F 591 /- /- /496 /76 /448 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): 0.175 F 160 240 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.052 D - - E 306 /- /- /294 /372 /- Des Ld: 45.00 EXP: C Kzt: NA L : 0.125 D - - HORZ(T )Buildin Wind nd reactions based on MWFRS C g ode: NCBCLL: 10.00 Mean Height: 25.00 ft Creep Factor. 2.0 F Br Width = 8.0 Min Re 1.5 9 q = Soffit: 0.00 TCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.664 E Brg Width = - Min Req = - Load Duration: 1.25 BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 TPI Std: 2014 Max BC CSI: 0.547 Bearing F is a rigid surface. Bearing F requires a seat plate. Spacing: 24.0 " C&C Dist a: 3.00 ft Rep Fac: Yes Max Web CSI: 0.147 Maximum Top Chord Forces Per Ply (Ibs) Loc. from endwall: not in 9.00 ft FT/RT:10(0)/10(10) Weight: 50.4 Ibs Chords Tens.Comp. Chords Tens. Comp. GCpi: 0.18 Plate Type(s): VIEWVer.21.01.01A.0521.20 A-B 53 -214 C-D 85 -164 B - C 0 -253 Wind Duration:1.60 WAVE Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Maximum Bot Chord Forces Per Ply (Ibs) Webs: 2x4 SP #3; W1 2x6 SP #2; Chords Tens.Comp. Chords Tens. Comp. A-F 247 -38 F-E 132 -369 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Maximum Web Forces Per Ply (Ibs) Chord Spacing(in oc) Start(ft) End(ft) Webs Tens.Comp. Webs Tens. Comp. B - F 298 -394 D - E 207 -152 BC 110 0.00 9.17 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. C - E 495 -177 Hangers / Ties (J) Hanger Support Required, by others Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. -WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'l, GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherivise stated on the TDD, only Alpine be Asa Truss Design Engineering Specialty Engineer), the TDD represents an acceptance of the engineerinj Manuel Martinez, P.E. connector plates shall be used for the TOO to valid. (i.e. seal on any professional responsibility for the design of the single Truss depicted an the TOO only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TOD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilifies and duties of the Truss Specialty Engineer Truss Manufacturer, otherwise defined by a Contract agreed upon in writing by all involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Designer, and unless Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. parties Copydght Q 2016 A-1 Roof Trusses -Reproduction of this document, in any forth, is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 11611612021 _ 85072 J8 MONO 9 1 Seal #: 2522 i .. Jing Criteria (psf) L: 20.00 L: 15.00 L: 0.00 ,L: 10.00 Ld: 45.00 CLL: 10.00 L' 0.00 I Duration: 1.25 :ing: 24.0 " E SEAT PLATE REQ. 2' 67' 87' Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height 25.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x6 SP #2; W2 2x4 SP #3; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 103 0.00 8.58 Apply puffins to any Chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. T W2 DF 1113X6 SEAT PLATE REQ. Dw Criteria (Pg,Pf )n PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs) NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Gravity Non -Gravity NA Ce: NA VERT(LQ: 0.080 E 348 360 Loc R+ / R- / Rh / Rw / Ll / RL NA Cs: NA VERT(CQ: -0.104 E 999 240 E 536 /- /- /504 /415 1134 )w Duration: NA HORZ(LL): -0.025 C - - F 262 /- /- /207 /205 /- HORZ(TL): 0.031 C - - Wind reactions based on MWFRS ilding Code: Creep Factor. 2.0 E Brg Width = 8.0 Min Req = 1.5 7th Ed. 2020 Res. Max TC CSI: 0.885 F Brg Width = 8.0 Min Req = 1.5 Std: 2014 Max BC CSI: 0.564 Bearings E & F are a rigid surface. Bearings E & F require a seat plate. 3 Fac: Yes Max Web CSI: 0.434 RT:10(0)/10(10) Weight: 32.9 Ibs Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. to Type(s): vc VIEWVer:21.01.01A.0521.20 A-B 15 -218 B-C 20 -93 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A- E 206 0 E- D 34 -63 Maximum Web Forces Per Ply (Ibs) I Webs Tens.Comp. Webs Tens. Comp. B-E 715 -431 C-D 399 -195 "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ('BUYER") ACKNOWLEDGMENT' torn. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineedn Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, underTPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPIA. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. Al notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCq published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined In TPI-1. Copyright 02016 A-1 Roof Trusses— Reproduction of this document in any form, is prohibited without the written permisslon of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 _ 85072 J8A MONO 2 1 Seal #: 2534 12 ,. 1113X8(E3) iR III3X6 SEAT PLATE REQ. SEAT PLATE REQ. 6r7r' Loading Criteria (pst) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria - TCLL: 20.00 Wind Std: ASCE 7-16 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# TCDL: 15.00 Speed: 160 mph Pf: NA Ce: NA VERT(LL): NA BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): NA BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.065 B - Des Ld: 45.00 Ma C Kzt:n 0.088 B - Building Code: NCBCLL: 10.00 MeeaHeight: 25.00 ItHORZ(TL): TCDL: 5.0 psf Creep Factor. 2.0 Soffit: 0.00 BCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.729 Load Duration: 1.25 MWFRS Parallel Dist: h/2 to h TPI Std: 2014 Max BC CSI: 0.667 Spacing: 24.0 " C&C Dist a: 3.00 ft Rep Fac: Yes Max Web CSI: 0.578 Loc. from endwall: not in 9.00 It FT/RT:10(0)/10(10) Weight: 26.6 Ibs GCpi: 0.18 Plate Type(s): VIEW Ver. 21.01.01A.0521.20 Wind Duration: 1.60 WAVE Lumber Top chord: 2x4 SP M-30; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Lt Slider: 2x6 SP #2; block length = 1.500' Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 79 0.00 6.58 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. N 7- ZD N ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ / R- / Rh / Rw / U / RL A 299 /- /- 1283 /226 /102 E 299 /- /- /258 /243 /- Wind reactions based on MWFRS A Brg Width = 8.0 Min Req = 1.5 E Big Width = 8.0 Min Req = 1.5 Bearings A & E are a rigid surface. Bearings A & E require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 279 -328 B - C 179 -293 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. A-D 44 -151 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. C - D 534 -220 -WARNING— Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT" form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, onlyAlpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerinc Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, under TPIA. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owners authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPIA. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Ccpydght 02016 A-1 Roof Trusses - Reproduction of this document, In any form, is prohibited without the written pernission of A-1 Roof Trusses Job: Truss Truss Type Qty Ply 06/16/2021 85072 J11 SPEC 3 1 Seal #: 2537 I 2' SEAT PLATE REQ. 11,91, ling Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) _. 20.00 Wind Std: ASCE 7-16 Pg: NA Ct: NA CAT: NA L: 15.00 Speed: 160 mph Pf. NA Ce: NA L: 0.00 Enclosure: Closed Lu: NA Cs: NA L: 10.00 Risk Category: II Snow Duration: NA EXP: C Kzt: NA Ld: 45.00 Mean Height: 25.00 it CLL: 10.00 TCDL: 5.0 psf Building Code: k 0.00 BCDL: 5.0 psf FBC 7th Ed. 2020 Res. I Duration: 1.25 MWFRS Parallel Dist h to 2h TPI Std: 2014 :ing: 24.0 " C&C Dist a: 3.00 it Rep Fac: Yes Loc. from endwall: not in 9.00 it FT/RT:10(0)/10(10) GCpi: 0.18 Plate Type(s): Wind Duration: 1.60 1ArAvp: Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W1 2x6 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 103 0.00 11.75 Apply pudins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. 9191, Defi/CSI Criteria PP Deflection in loc Udefl U# VERT(LQ: 0.108 G 259 360 VERT(CQ: 0.178 G 156 240 HORZ(LL): -0.037 D - - HORZ(TQ: 0.062 D - - Creep Factor. 2.0 Max TC CSI: 0.722 Max BC CSI: 0.992 Max Web CSI: 0.271 Weiaht 51.1 Ibs Ver: 21.01.01 A.0521.20 III 1.5X4 D SEAT PLATE REQ. ♦ Maximum Reactions (Ibs) Gravity Non -Gravity Loc R+ /R- /Rh /Rw /U /RL G 667 /- A /628 /519 /183 H 413 A A /358 /342 A Wind reactions based on MWFRS G Brg Width = 8.0 Min Req = 1.5 H Brg Width = 6.0 Min Req = 1.5 Bearings G & H are a rigid surface. Bearings G & H require a seat plate. Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - B 585 -471 C - D 22 -65 B-C 712 -528 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A - G 475 - 570 F - E 455 - 807 G - F 457 - 819 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. B - G 684 -457 C - E 912 -514 F-C 314 -350 D-E 201 -117 "WARNING" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER"), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any Too represents an acceptance of the professional engineerinE Manuel Martinez, P.E. responsibility, for the design of the single Truss depicted on the TDD only, underTPl-1. The design assumptions, loading conditions, su'dabilily and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. Ali notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 02016 A-1 Roof Trusses—Reproductlon of this document, in any form, is prohibfted without the written pennlssion of A-1 Roof Trusses. Job: Truss Truss Type City Ply 06/16/2021 _ 85072 J11A SPEC 1 1 Seal #: 2543 D ling Criteria (psf) L: 20.00 L: 15.00 L: 0.00 L: 10.00 Ld: 45.00 CLL: 10.00 t: 0.00 I Duration: 1.25 :ing: 24.0 " I 2' SEAT PLATE REQ. Wind Criteria Wind Std: ASCE 7-16 Speed: 160 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 25.00 it TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h to 2h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W1 2x6 SP #2; Plating Notes All plates are 1.5X3 except as noted. Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 75 0.00 11.75 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to Wind Wind loading based on both gable and hip roof types. Left bottom chord exposed to wind. 9191. 11,9" 'v ce) Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs), or'=PLF Pg: NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# Gravity Non -Gravity Pf: NA Ce: NA VERT(LL): 0.009 G 999 360 Loc R+ / R- / Rh / Rw / U / RL G 463 /- /- /445 /399 /183 Lu: NA Cs: NA VERT(CL): 0.020 G 999 240 Snow Duration: NA HORZ(LL): -0.003 B - - E• 154 /- A /110 190 A HORZ(TL): 0.005 B - - Wind reactions based on MWFRS Building Code: Creep Factor. 2.0 G Brg Width = 8.0 Min Req = 1.5 FBC 7th Ed. 2020 Res. Max TIC CSI: 0.423 E Brg Width = 46.0 Min Req = - TPI Std: 2014 Max BC CSI: 0.406 Bearings G & F are a rigid surface. Rep Fac: Yes Max Web CSI: 0.105 Bearing G requires a seat plate. FT/RT:10(0)/10(10) Weight: 51.1 Ibs Maximum Top Chord Forces Per Ply (Ibs) Plate Type(s): Chords Tens.Comp. Chords Tens. Comp. VIEW Ver. 21.01.01A.0521.20 A - B 149 -91 C - D 18 -55 B-C 150 -135 WAVE Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. A-G 98 -115 F-E 97 -270 G - F 81 -258 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. Webs Tens. Comp. B-G 565 -381 C-E 319 -115 F-C 354 -401 D-E 149 -81 "WARNING'" Please thoroughly review the "A-1 ROOF TRUSSES ('SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ('BUYER') ACKNOWLEDGMENT' forth. Verify design parameters and read notes on this Truss Design Drawing (rDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specially Engineer), the seal on any Too represents an acceptance of the professional engineedn( Manuel Martinez, P.E. responsibility for the design of the single Truss depicted an the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terns are as defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses -Reproduction of this document in any form, is prohibited without the written permission of A-1 Roof Trusses. Job: 85072 Truss PB01 T ZO Truss Type GABL 3'7"8 12 C=4X4 Qty Ply 06/16/2021 = 2 1 Seal #: 2516 '410 3'7"8 �j 11,11 5'4"14 11"1 7'3" T 1 Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf )n PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs), or *=PLF TCLL: 20.00 Wind Std: ASCE 7-16 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Gravity Non -Gravity TCDL: 15.00 Speed: 160 mph Pf. NA Ce: NA VERT(LL): -0.001 F 999 360 Loc R+ / R- / Rh / Rw / U / RL A - /-4 A /39 /36 /71 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): 0.002 F 999 240 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): 0.001 F - - B* 97 A A 172 /57 A Des Ld: 45.00 EXP: C Kzt: NA HORZ L 0.001 F - - (T ) E - / 4 /- /8 A /- g de: Building Co NCBCLL: 10.00 Mean Height: 25.00 ft Creep Factor. 2.0 Wind reactions based on MWFRS Soffit 0.00 TCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.081 A Brg Width = 7.3 Min Req = 1.5 Load Duration: 1.25 BCDL: 5.0 psf MWFRS Parallel Dist h/2 to h TPI Sid: 2014 Max BC CSI: 0.045 B Brg Width = 64.8 Min Req = - E Brg Width = 7.3 Min Req 1.5 Spacing: 24.0 " C&C Dist a: 3.00 it Rep Fac: Yes Max Web CSI: 0.020 Bearings A, B, & E are a rigid surface. Loc. from endwall: not in 13.00 itFT/RT:10(0)/10(10) Weight: 25.2 Ibs Maximum Top Chord Forces Per Ply (Ibs) GCpi: 0.18 Plate Type(s): Chords Tens.Comp. Chords Tens. Comp. VIEW Ver: 21.01.01A.0521.20 Wind Duration: 1.60 WAVE A-B 95 -81 C-D 96 -85 Lumber B-C 110 -85 D-E 24 -5 Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. Plating Notes B - F 47 -14 F - D ' 47 -14 All plates are 2X4(A1) except as noted. Purlins Maximum Web Forces Per Ply (Ibs) In lieu of structural panels or rigid ceiling use purlins Webs Tens.Comp. to laterally brace chords as follows: C - F 58 -107 Chord Spacing(in oc) Start (ft) End(ft) BC 61 0.15 5.26 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. "WARNING— Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine connector plates shall be used for the TDD to be valid. As a Truss Design Engineering (i.e. Specialty Engineer), the seal on any TDD represents an acceptance of the professional engineerinE Manuel Martinez, P.E. responsibility for the design of the single Truss depicted on the TDD only, underTPI-1. The design assumptions, loading conditions, suitability and use ofthis Truss for any Building is the At 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPIA. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shag be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPIA Copyright 02016 A-1 Roof Trusses —Reproduction of this document, In any form, is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 - 85072 PB02 GABL 27 1 Seal #: 2519 37'8 3'7"8 12 C=3X4 T 6� T to _ 50 B p E rA 11 "1 54"14 6'3"15 -I TW Loading Criteria (psf) Wind Criteria Snow Criteria (Pg,Pf in PSF) DeflICSI Criteria ♦ Maximum Reactions (1bs), or *=PLF TCLL: 20.00 Wind Std: ASCE 7-16 Pg: NA Ct: NA CAT: NA PP Deflection in Ice Udefl U# Gravity Non -Gravity TCDL: 15.00 Speed: 160 mph Pf: NA Ce: NA VERT(LL): 0.002 999 360 Loc R+ / R- / Rh / Rw / U / RL A - /-2 /- /34 /49 f71 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): 0.003 C 999 240 BCDL: 10.00 Risk Category: If Snow Duration: NA HORZ(LL): -0.001 - - B* 97 /- A f77 155 !- Des Ld: 45.00 EXP: C Kzt: NA HORZ(TL): 0.001 - - E - /-2 /- /4 /18 /- C g ode: NCBCLL: 10.00 Mean Height: 25.00 itBuildin Creep Factor. 2.0 Wind reactions based on MWFRS Soffit: 0.00 TCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.060 A Brg Width = 7.3 Min Req = 1.5 Load Duration: 1.25 BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h TPI Std: 2014 Max BC CSI: 0.080 B Brg Width = 64:8 E Brg Width = 7.3 Min Req = - Min Req = 1.5 Spacing: 24.0 " C&C Dist a: 3.00 It Rep Fac: Yes Max Web CSI: 0.000 Bearings A, B, & E are a rigid surface. Loc. from endwall: not in 13.00 ItFT/RT:10(0)/10(10) Weight: 22.4 Ibs GCpi: 0.18 Plate Type(s): Maximum Top Chord Forces Per Ply (Ibs) Chords Tens.Comp. Chords Tens. Comp. Wind Duration: 1.60 WAVE VIEW Ver. 21 -01.01 A.0521.20 A - B 101 -79 C - D 177 -229 Lumber B - C 183 -229 D - E 23 -2 Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Maximum Bot Chord Forces Per Ply (Ibs) Plating Notes Chords Tens.Comp. All plates are 2X4(A1) except as noted. B - D 174 -87 Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 61 0.15 5.26 Apply purlins to any chords above or below fillers at 24" CC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. **WARNING'" Please thoroughly review the "A-1 ROOF TRUSSES ("SELLF-R"), GENERAL TERMS arid CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (Too) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine Truss Design Engineering Specialty Engineer), the Too acceptance ofthe engineerin Manuel Martinez, P.E. connector plates shall be used for the TDD to be valid. As a (i.e. seal on any represents an professional responsibility for the design of the single Truss depicted on the TOD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building, is the # 047182 responsibility of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkVlew Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Truss Manufacturer, definedby Contract agreed upon in writing by all involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Designer, Specialty Engineer and unless otherwise a Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. parties Copyright ®2016 A-1 RoolTmsses— Reproductlon of }his document, in any form, is prohibaed without the written permission of A-1 Roof Trusses. 4 Job: Truss Truss Type Qty PI y 06/16/2021 85072 V03 VAL 1 1 �= Seal #: 2529 �}- 111 "8 12 6 B T A �D M CD 4(D8 ) 216117 --i Loading Criteria (pst) Wind Criteria Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs), or *=PLF TCLL: 20.00 Wind Std: ASCE 7-16 Pg: NA Ct: NA CAT: NA PP Deflection in loc Udefl U# Gravity Non -Gravity TCDL: 15.00 Speed: 160 mph Pf; NA . Ce: NA VERT(LL): 0.029 B 983 360 Loc R+ / R- / Rh / Rw 11.1 / RL D* 93 /- /- /58 /20 /19 BCLL: 0.00 Enclosure: Closed Lu: NA Cs: NA VERT(CL): 0.068 B 424 240 BCDL: 10.00 Risk Category: II Snow Duration: NA HORZ(LL): -0.013 B - - Wind reactions based on MWFRS Des Ld: 45.00 C Kzt: NA HORZ(TL): 0.030 B - - D Brg Width = 30.4 Min Req = - Building C g ode: NCBCLL: 10.00 Mca ean Height 25.00 ft Creep Factor. 2.0 Bearing A is a rigid surface. 9 9 Soffit 0.00 TCDL: 5.6 psf BCDL: 5.0 psf FBC 7th Ed. 2020 Res. Max TC CSI: 0.305 Maximum To Chord Forces Per PI Ibs y ( ) Load Duration: 1.25 MWFRS Parallel Dist•. h/2 to h TPI Std: 2014 Max BC CSI: 0.417 Chords Tens Comp. Spacing: 24.0 " C&C Dist a: 3.00 ft Rep Fac: Yes Max Web CSI: 0.000 A - B 0 -46 Loc. from endwall: not in 9.00 ft FT/RT:10(0)110(10) Weight 8.4 lbs GCpi: 0.18 Plate Type(s): Maximum Bot Chord Forces Per Ply (Ibs) Wind Duration: 1.60 WAVE VIEW Ver: 21.01.01A.0521.20 Chords Tens.Comp. Lumber A-C 157 -16 Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Purlins In lieu of structural panels or rigid ceiling use purlins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 30 0.00 2.54 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Wind loading based on both gable and hip roof types. Additional Notes See Al Slid Detail for valley details. "WARNING— Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER'; GENERAL TERMS and CONDITIONS CUSTOMER ('BUYER") ACKNOWLEDGMENT' form. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine be for the TDD to be As Truss Design Engineering Specialty Engineer), the TDD of the engineerinE Manuel Martinez, P.E. connector plates shall used valid. a (i.e. seal on any represents an acceptance professional responsibility for the design of the single Truss depicted on the TDD ony, underTP1-1. The design assumptions, loading conditions, suitabitityand use of this Truss Wary, Building is the # 047182 responsibifiy of the Owner, the Owner's authorized agent or the Building Designer, in the context of the IRC, the IBC, local building code and TPF1. The approval of the TDD and any field use of the Tmss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. AM notes set out in the TDD and the practices and 4620 ParkView Dr guidefines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance. TPIA defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all involved. The Specialty Engineer is NOT the St Cloud, FL 34771 parties Building Designer or Truss System Engineer of any building. All capitalized terms are as defined in TPI-1. Copyright 02016 A-1 Roof Trusses— Reproduction of this document, in any form, is prohibited without the written permission of A-1 Roof Trusses. Job: Truss Truss Type Qty Ply 06/16/2021 _ 85072 V07 VAL 1 1 Seal#: 2526 Loading Criteria (psf) Wind Criteria TCLL: 20.00 Wind Std: ASCE 7-16 TCDL: 15.00 Speed: 160 mph BCLL: 0.00 Enclosure: Closed BCDL: 10.00 Risk Category: II EXP: C Kzt: NA Des Ld: 45.00 Mean Height: 25.00 ft NCBCLL: 10.00 TCDL: 5.0 psf Soffit: 0.00 BCDL: 5.0 psf Load Duration: 1.25 MWFRS Parallel Dist: h to 2h Spacing: 24.0 " C&C Dist a: 3.00 it Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Lumber Top chord: 2x4 SP #2; Bot chord: 2x4 SP #2; Webs: 20 SP #3; Purlins In lieu of structural panels or rigid ceiling use purins to laterally brace chords as follows: Chord Spacing(in oc) Start(ft) End(ft) BC 81 0.00 6.72 Apply purlins to any chords above or below fillers at 24" OC unless shown otherwise above. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See Al Std Detail for valley details. 17' 1 1'107 3'8"4 --�{ DE III3X6 6'8"10 6'5"2 Snow Criteria (Pg,Pf in PSF) Defl/CSI Criteria ♦ Maximum Reactions (Ibs), or *=PLF Pg: NA Ct: NA CAT: NA PP Deflection in loc L/defl L/# Gravity Non -Gravity Pf: NA Ce: NA VERT(LL): 0.130 B� 607 360 Loc R+ / R- / Rh / Rw / U / RL E* 92 /- /- /57 /17 /15 Lu: NA Cs: NA VERT(CL): 0.299 B 263 240 Snow Duration: NA HORZ(LL): -0.044 C - - Wind reactions based on MWFRS HORZ(TL): 0.102 C - - Creep Factor. 2.0 E Brig Width = 80.6 Min Req = - Bearing A is a rigid surface. Building Code: FBC 7th Ed. 2020 Res. Max TC CSI: 0.812 Maximum Top Chord Forces Per Ply (Ibs) TPI Std: 2014 Max BC CSI: 0.628 Chords Tens.Comp. Chords Tens. Comp. A - B 13 -190 B - C 56 -143 Rep Fac: Yes Max Web CSI: 0.330 FT/RT:10(0)/10(10) Weight: 23.8 lbs Plate Type(s): WAVE VIEW Ver. 21.01.01A.0521.20 Maximum Bot Chord Forces Per Ply (Ibs) Chords Tens.Comp. A - D 285 -21 Maximum Web Forces Per Ply (Ibs) Webs Tens.Comp. C - D 366 -189 -WARNING- Please thoroughly review the "A-1 ROOF TRUSSES ("SELLER"), GENERAL TERMS and CONDITIONS CUSTOMER ("BUYER') ACKNOWLEDGMENT" forth. Verify design parameters and read notes on this Truss Design Drawing (TDD) and the Specialty Engineer reference sheet before use. Unless otherwise stated on the TDD, only Alpine the TDD to be As Truss Design Engineering Specialty Engineer), the Too an ofthe engineerin Manuel Martinez, P.E. connector plates shall be used for valid. a (i.e. seal on any represents acceptance professional responsibility for the design of the single Truss depicted an the TDD only, under TPI-1. The design assumptions, loading conditions, suitability and use of this Truss for any Building is the # 047182 responsibility of the Owner, the Owner's authorized agent or the'Suilding Designer, in the context of the IRC, the IBC, local building code and TPI-1. The approval of the TDD and any field use of the Truss, including handling, storage, installation and bracing shall be the responsibility of the Building Designer and Contractor. All notes set out in the TDD and the practices and 4620 ParkView Dr guidelines of the Building Component Safety Information (BSCI) published by TPI and SBCA are referenced for general guidance.. TPI-1 defines the responsibilities and duties of the Truss Designer, Specialty Engineer and Truss Manufacturer, unless otherwise defined by a Contract agreed upon in writing by all parties involved. The Specialty Engineer is NOT the St Cloud, FL 34771 Building Designer or Truss System Engineer of any building. Ali capitalized terms are as defined in TPI-1. Copyright 0 2016 A-1 Roof Trusses -Reproduction of this document, in any forth, is prohibited without Ne written pemdssion of A-1 Roof Trusses. 3/16/2020 HIP/ KING JACK (TYPICAL) STDL 01.0 �= A-1 ROOF = TRU55E5 A FLORIDA CORPORATION A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772)409-1010 ATTACH END JACKS USING (4) 0.131" O TOE NAILS AT TOP CHORD & (3) 0.131" 0 TOE NAILS AT BOTTOM CHORD. ATTACH KING JACK USING (3) 0.131" 0 TOE NAILS AT TOP CHORD & 24" STRAP USING (6) 1Od X 1Y2' AT EACH END OF BOTTOM CHORD. ATTACH CORNER JACKS USING (2) 0.131" 0 TOE NAILS AT TOP & BOTTOM CHORDS (TYP). CORNERSET GENERAL SPECIFICATIONS: MAX LOAD: 55 PSF ROOF LOAD, 175 MPH, ASCE 7-10, EXP. B & C, UP TO 60' MEAN ROOF HEIGHT & EXPOSURE D UP TO 30' MEAN ROOF HEIGHT. Manuel Martinez, P.E. # 047182 4620 ParkView Dr 5/28/2020 HIP/ KING JACK (HVHZ) STDL 02.2 �= A-1 ROOF = TRUSSES A FLORIDA CORPORATION A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL. 34946 (772)409-1010 ATTACH KING & END JACK WITH (1) THJA26 HANGER OR EQUIVALENT AT BOTTOM CHORD ATTACH KING & END JACKS WITH (1) LSTA 12 TWIST STRAP AT TOP CHORD WITH (10) 1 Od NAILS PER STRAP (MIN.) & (3) 0.131" QJ TOE NAILS. ATTACH CORNER JACKS & STD. JACKS WITH (1) LSTA 12 TWIST STRAP AT TOP CHORD & BOTTOM CHORD WITH (10) 10d NAILS PER STRAP MINIMUM (TYP). HIGH VELOCITY HURRICANE ZONE CORNERSET SPECIFICATIONS: MAX LOAD: 55 PSF ROOF LOAD, 175 MPH, ASCE 7-10, EXP. B & C, UP TO 60' MEAN ROOF HEIGHT & EXPOSURE D UP TO 30' MEAN ROOF HEIGHT. NOTE: IN ADDITION TO STRAPPING TOE- NAIL BOTH CHORDS OF CORNER JACKS TO CARRYING MEMBER PER THE FOLLOWING SCHEDULE: • 2X4: (2) 0.131" QJ TOE NAILS • 2X6: (3) 0.131" 0 TOE NAILS LSTAl 2 TWIST STRAP WITH 10D NAILS, MIN. (10). SEE MFR'S RECOMMENDED CONNECTION. HIP, OR KING JACK (TYP.) JACK, OR CORNER JACK (TYP.) IMPORTANT NOTE: CONNECTION DESIGNED IN ACCORDANCE WITH FBC 2321.6- 2321.7 PROVIDING METAL STRAPPING (FLORIDA APPROVED PRODUCT) TO RESIST MIN. 700LB UPLIFT AT ALL CONNECTIONS IN HIGH VELOCITY HURRICANE ZONE. Manuel Martinez, P.E. # 047182 4620 ParkView Dr FEBRUARY 17, 2017 1 ALTERNATE GABLE END BRACING DETAIL ALTERNATE DIAGONAL BRACING TO THE BOTTOM CHORD HORIZONTAL BRACE (SEE SECTION A -A) TRUSSSES @ 24. O.C. A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772409-1010 1' - 3' MAX. \ DIAG. BRACE AT 1/3 POINTS IF NEEDED \ IT IS THE RESPONSIBILITY OF THE BLDG. \ DESIGNER OR THE PROJECT ENGINEER/ARCHITECT TO DESIGN THE CEILING DIAPHRAGM AND ITS \ ATTACHMENT TO THE TRUSSES TO RESIST ALL OUT OF PLANE LOADS THAT MAY RESULT FROM THE BRACING OF THE GABLE ENDS. END WALL STDTL03 2X6 DIAGONAL BRACE SPACED 48' O.C. ATTACHED TO VERTICAL WITH (4) - 16d NAILS, AND ATTACHED TO BLOCKING WITH (5) - 10d COMMONS. NAIL DIAGONAL BRACE TO PURLIN WITH TWO 16d NAILS. 2X4 PURLIN FASTENED TO FOUR TRUSSES WITH (2) - 16d NAILS EACH. FASTEN PURLIN TO BLOCKING W/ (2) - 16d NAILS (MIND. PROVIDE 2X4 BLOCKING BETWEEN THE TRUSSES SUPPORTING THE BRACE AND THE TWO TRUSSES ON EITHER SIDE AS NOTED. TOENAIL BLOCKING TO TRUSSES WITH (2) - 10d NAILS AT EACH END. ATTACH DIAGONAL BRACE TO BLOCKING WITH (5) - 10d COMMON WIRE NAILS. CEILING SHEATHING BRACING REQUIREMENTS FOR STRUCTURAL GABLE TRUSSES STRUCTURAL GABLE TRUSSES MAY BE BRACED AS NOTED: METHOD 1: ATTACH A MATCHING GABLE TRUSS TO THE INSIDE FACE OF THE STRUCTURAL GABLE AND FASTEN PER THE FOLLOWING NAIL SCHEDULE. METHOD 2: ATTACH 2X_ SCABS TO THE FACE OF EACH VERTICAL MEMBER ON THE STRUCTURAL GABLE PER THE FOLLOWING NAILING SCHEDULE. SCABS ARE TO BE OF THE SAME SCAB ALONG SIZE, GRADE, AND SPECIES AS THE TRUSS VERTICALS. VERTICAL NAILING SCHEDULE: - FOR WIND SPEEDS 120 MPH (ASCE 7-98, 02, 05), 150 MPH (ASCE 7-10) OR LESS, NAIL ALL MEMBERS WITH ONE ROW OF 10d (.131' X 3') NAILS SPACED 6' O.C. - FOR WIND SPEEDS GREATER 120 MPH (ASCE 7-98, 02, 05), 150 MPH (ASCE 7-10) NAIL ALL MEMBERS WITH TWO ROWS OF 10d (.131'X3') NAILS SPACED 6' O.C. (2X4 STUDS MINIMUM). MAXIMUM STUD LENGTHS ARE LISTED ON PAGE 1. ALI BRACING METHODS SHOWN ON PAGE 1 ARE VALID AND ARE TO BE FASTENED TO THE SCABS OR VERTICAL STUDS OF THE STANDARD GABLE TRUSS ON THE INTERIOR SIDE OF THE STRUCTURE. JKAL TRUSS idn.i STRUCTURALN AN ADEQUATE DIAPHRAGM OR OTHER METHOD OF BRACING GABLE TRUSS / MUST BE PRESENT TO PROVIDE FULL LATERAL SUPPORT OF THE BOTTOM CHORD TO RESIST ALL OUT OF PLANE LOADS. THE BRACING SHOWN IN THIS DETAIL IS FOR VERTICAL/STUDS ONLY. NOTE: THIS DETAIL IS TO BE USED ONLY FOR/ STRUCTURAL GABLES WITH INLAYED STUDS. TRUSSES WITHOUT INLAYED STUDS ARE NOT ADDRESSED HERE. STANDARD GABLE / TRUSS Manuel Martinez, P.E. # 047182 4620 ParkView Dr 12/23/19 PIGGY -BACK TRUSS STDTL04.1 A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772409-1010 PIGGY -BACK DETAIL (TYPICAL) 180 MPH WIND, 30.00 FT MEAN ROOF HEIGHT, A.S.C.E. 7-10, PARTIALLY ENCLOSED BLDG. LOCATED ANYWHERE AT ROOF, EXPOSURE C, WIND D.L.= 5.0 P.S.F. (MIN.), KZT= 1.00. OR... 160 MPH WIND, 30.00 FT MEAN ROOF HEIGHT, A.S.C.E. 7-10, PARTIALLY ENCLOSED BLDG. LOCATED ANYWHERE AT ROOF, EXPOSURE D, WIND D.L.= 5.0 P.S.F. (MIN.), KZT= 1.00. IMPORTANT NOTE: TOP CHORDS OF TRUSSES SUPPORTING PIGGY -BACK CAP TRUSSES MUST BE ADEQUATELY BRACED BY SHEATHING AND/ OR PURLINS. THE BUILDING ENGINEER OF RECORD SHALL PROVIDE DIAGONAL BRACING OR OTHER SUITABLE ANCHORAGE TO PERMANENTLY RESTRAIN PURLINS AND LATERAL BRACING FOR OUT OF PLANE LOADS OVER GABLE ENDS. MAXIMUM TRUSS SPACING IS NOT TO EXCEED 24" O.C. DETAIL IS NOT APPLICABLE IF CAP SUPPORTS ADDITIONAL LOADS SUCH AS CUPOLA, STEEPLE, CHIMNEY OR DRAG STRUT LOADS. "REFER TO ENGINEER'S SEALED TRUSS DESIGN DRAWINGS FOR PIGGY -BACK AND BASE TRUSS SPECIFICATIONS." PIGGY -BACK TRUSS. (REFER TO ACTUAL TRUSS DESIGN DRAWINGS FOR ADDITIONAL INFORMATION.) 2'-0" MAX OPTION NO. 1 - TEE-LOK 3" x 8" TEE-LOK MULTI -USE CONNECTION PLATES SPACED AT 4'-0" O.C. MAX. PLATES SHALL BE PRESSED INTO PIGGY -BACK TRUSS AT 4'-0" O.C. STAGGERED FROM EACH FACE AND NAILED TO BASE TRUSS WITH 4 EACH 6d (1.5" X 0.099") NAILS IN EACH PLATE TO ACHEIVE MAXIMUM UPLIFT CAPACITY OF 377 LBS AT EACH 3" X 8" TEE-LOK MULTI -USE CONNECTION PLATE (MINIMUM OF 2 PLATES). OPTION NO.2 - APA RATED GUSSET: 8" x 8" x 0-7/16" (MIN.) APA RATED SHEATHING GUSSETS EACH FACE. ATTACH AT 8'-0" O.C. w/ 8 (EACH) 6d COMMON (0.113" x 2") NAILS PER GUSSET: 4 (EACH) AT CAP BOTTOM CHORD & 4 (EACH) AT BASE TRUSS TOP CHORD. GUSSETS MAY BE STAGGERED AT 4'-0" O.C. FRONT TO BACK FACES. MINIMUM TWO (2 EA.) CONNECTIONS AT EACH TRUSS. OPTION NO.3 - 2X4 VERTICAL WOOD SCAB: 2X4 SPF #2, FULL CHORD DEPTH SCABS AT EACH FACE. ATTACH AT 8'-0" O.C. w/6 (EACH) 1 Od BOX NAILS (0.128" x 3") PER SCAB: 3 (EACH) AT CAP BOTTOM CHORD AND 3 (EACH) AT BASE TRUSS TOP CHORD. SCABS MAY BE STAGGERED 4'-0" O.C. FRONT TO BACK FACES. MINIMUM TWO (2 EA.) CONNECTIONS AT EACH TRUSS. OPTION #1: TEE-LOK MULTI -USE CONNECTION PLATE. OPTION #2: APA RATED GUSSET. OPTION #3: 2X4 VERT. SCAB. ATTACH EACH PURLIN TO TOP CHORD OF BASE TRUSS. PURLIN & CONNECTIONS BY OTHERS. BASE TRUSS. (REFER TO TRUSS DESIGN DRAWINGS FOR ADDITIONAL INFORMATION.) PURLINS SPACED ACCORDING TO MAX. SPACING OF TOP CHORD OF BASE TRUSS. SPACING IS NOT TO EXCEED 24" O.C. & PURLINS TO BE LOCATED AT JOINT OF EACH BASE TRUSS. ** IMPORTANT NOTE •* THIS DETAIL IS VALID ONLY FOR SINGLE PLY BASE TRUSSES SPACED AT 24" O.C. OR LESS. Manuel Martinez, P.E. # 047182 4620 ParkView Dr JULY 17, 2017 I TRUSSED VALLEY SET DETAIL - SHEATHED I STDTL05 �I GENERAL SPECIFICATIONS: �'. 1. NAIL SIZE = 3" X 0.131" = 10d 2. WOOD SCREW = 4.5" SDS25412 SIMPSON OR EQUIVALENT. 3. INSTALL SHEATHING TO TOP CHORD OF BASE TRUSSES. 4. INSTALL VALLEY TRUSSES (24" O.C. MAXIMUM) AND SECURE TO BASE TRUSSES AS PER DETAIL "A". 5. BRACE VALLEY WEBS IN ACCORDANCE WITH THE INDIVIDUAL DESIGN DRAWINGS. A-1 ROOF TRUSSES 6. NAILING DONE PER NDS - 01. 4451 ST. LUCIE BLVD. GABLE END, COMMON 7. VALLEY STUD SPACING NOT TO EXCEED 48" O.C. FORT PIERCE, FL 34946 TRUSS, OR GIRDER l 772409-1010 TRUSS ` VALL Y PRUS�; I� II i) II II II IIASETRi SSES (TY .0 taw. L'umMVIV 3S, OR GIRDER TRUSS TRUSS CRITERIA: SECURE VALLEY TRUSS WIND DESIGN PER ASCE 7-98, ASCE 7-02, ASCE 7-05: 146 MPH W/ ONE ROW OF 10d WIND DESIGN PER ASCE 7-10: 170 MPH NAILS 6" O.C. MAX MEAN ROOF HEIGHT = 30 FEET ROOF PITCH = MINIMUM 3/12 MAXIMUM 6/12 CATERGORY II BUILDING EXPOSURE C WIND DURATION OF LOAD INCREASE: 1.60 MAX TOP CHORD TOTAL LOAD = 50 PSF ATTACH 2X4 CONTINUOUS #2 MAX SPACING = 24" O.C. (BASE AND VALLEY) SYP TO THE ROOF W/TWO MINIMUM REDUCED DEAD LOAD OF 6 PSF'ON THE TRUSSES. SIMPSON SDS25412 (1/4" X 4.5") OR EQUIVALENT WOOD SCREWS INTO EACH BASE TRUSS. DETAIL A Manuel Martinez, P.E. # 047182 4620 ParkView Dr St Cloud, FL 34771 FEBRUARY 5, 2018 A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772409-1010 SECURE W/C VALLEY TRUSS (TYPICAL) TRUSSED VALLEY SET DETAIL GABLE END, COMMON TRUSS, OR GIRDER TRUSS V - 1 -1" - (NO SHEATHING) N.T.S. GENERAL SPECIFICATIONS: STDTL06 1. NAIL SIZE = 3" X 0.131" = 10d 2. WOOD SCREW = 3" SDS25300 SIMPSON OR EQUIVALENT. 3. INSTALL VALLEY TRUSSES (24" O.C. MAXIMUM) AND SECURE PER DETAIL ,.A., 4. BRACE VALLEY WEBS IN ACCORDANCE WITH THE INDIVIUAL DESIGN DRAWINGS. 5. BASE TRUSS SHALL BE DESIGNED WITH A PURLIN SPACING EQUIVALENT TO THE RAKE DIMENSION OF THE VALLEY TRUSS SPACING. 6. NAILING DONE PER NDS-01. 7. VALLEY STUD SPACING NOT TO EXCEED 48" O.C. P r2 SEE DETAIL "A" BELOW (TYP.) BASE TRUSSES GABLE END, COMMON TRUSS, OR GIRDER VALLEY TRUSS TRUSS (TYPICAL) WIND DESIGN PER ASCE 7-98, ASCE 7-02, ASCE 7-05: 146 MPH WIND DESIGN PER ASCE 7-10: 170 MPH MAX MEAN ROOF HEIGHT =30 FEET ROOF PITCH = MINIMUM 3/12 MAXIMUM 6/12 CATERGORY II BUILDING EXPOSURE C WIND DURATION OF LOAD INCREASE: 1.60 ATTACH 2X4 CONTINUOUS 42 MAX TOP CHORD TOTAL LOAD = 50 PSF SYP TO THE ROOF W/ TWO MAX SPACING = 24" O.C. (BASE AND VALLEY) SIMPSON SDS25300 (1/4" X 3") MINIMUM REDUCED DEAD LOAD OF 6 PSF ON THE TRUSSES. OR EQUIVALENT WOOD SCREWS INTO EACH BASE TRUSS. Manuel Martinez, P.E. # 047182 4620 ParkView Dr St Cloud, FL 34771 I JULY 17, 2017 I TRUSSED (HIGH WIND VELOCITY) AIL I STDTL07 A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772-409-1010 ATTA( WIND DESIGN PER ASCE 7-98, ASCE 7-1 WIND DESIGN PER ASCE 7-10: 170 MP1 MAX MEAN ROOF HEIGHT = 30 FEET CATERGORY 11 BUILDING EXPOSURE B OR C WIND DURATION OF LOAD INCREASE:' MAX TOP CHORD TOTAL LOAD = 50 PSI MAX SPACING = 24" O.C. (BASE AND VP SUPPORTING TRUSSES DIRECTLY UNricK VALLCT I KUJACA MVA 1 0r DESIGNED WITH A MAXIMUM UNBRACED LENGTH OF 2' -10" ON AFFECTED TOP CHORDS. NOTES: 1. SHEATHING APPLIED AFTER INSTALLATION OF VALLEY TRUSSES. 2. THIS DETAIL IS NOT APPLICABLE FOR SPF-S SPECIES LUMBER. NON -BEVELED BOTTOM CHORD FOR BEVELED BOTTOM CHORD, CLIP MAY BE APPLIED TO EITHER FACE. CLIP MAYBE APPLIED TO THIS FACE UP TO A MAXIMUM 6/12 PITCH NON-BEVELED BOTTOM CHORD CLIP MUST BE APPLIED TO THIS FACE WHEN PITCH EXCEEDS 6/12 (MAXIMUM 12/12 PITCH) ooe # 047182 4620 ParkView Dr St Cloud, FL 34771 FEBRUARY 17, 2017 1 STANDARD GABLE END DETAIL I STDTL08 A-1 ROOF TRUSSES 4461 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772409-1010 * DIAGONAL BRACING REFER TO SECTION A -A TYPICAL 2X4 L-BRACE NAILED TO 2X4 VERTICALS 7z; VERT STUD SECTION B-B TRUSS GEOMETRY AND CONDITIONS SHOWN ARE FOR ILLUSTRATION ONLY. DIAGONAL BRACE 4' - 0' O.C. MAX. SEE INDIVIDUAL ENGINEERING DRAWINGS FOR TRUSS DESIGN CRITERIA. 12 Q VARIES TO COMMON TRUSS 11t* L - BRACING REFER TO SECTION B-B 3X4 = v 24' MAX. ---1 - - I NOTE: 1. MINIMUM GRADE OF #2 MATERIAL IN THE TOP AND BOTTOM CHORDS. 2. CONNECTION BETWEEN BOTTOM CHORD OF GABLE END TRUSS AND WALL TO BE PROVIDED BY PROJECT ENGINEER OR ARCHITECT. 3. BRACING SHOWN IS FOR INDIVIDUAL TRUSS ONLY. CONSULT BLDG. ARCHITECT OR ENGINEER FOR TEMPORARY AND PERMANENT BRACING OF ROOF SYSTEM. 4. 'L' BRACES SPECIFIED ARE TO BE FULL LENGTH, SPF OR SP #3 OR BETTER WITH ONE ROW OF 10d NAILS SPACED 6' O.C. 5. DIAGONAL BRACE TO BE APPROXIMATELY 45 DEGREES TO ROOF DIAPHRAGM AT4'-0'D.C. 6. CONSTRUCT HORIZONTAL BRACE CONNECTING A 2X6 AND A 2X4 AS SHOWN WITH 16d NAILS SPACED 6' O.C. HORIZONTAL BRACE TO BE LOCATED AT THE MIOSPAN OF THE LONGEST GABLE STUD. ATTACH TO VERTICAL GABLE STUDS WITH (3) IOd NAILS THROUGH 2X4 (REFER TO SECTION A -A) 7 GABLE STUD DEFLECTION MEETS OR EXCEEEDS L/240 VERTICAL 2X6 SP OR SPF STUD #2 DIAGONAL BRACE (4) - 16d NAILS 16d NAILS + SPACED G' O.C. (2) lOd NAILS , INTO 2X6 2X6 SP OR SPF #2 2X4 SP OR SPF #2 TYPICAL HORIZONTAL BRACE NAILED TO 2X4 VERTICALS SECTION A -A W/(4) - 10d NAILS PROVIDE 2X4 BLOCKING BETWEEN THE FIRST TWO TRUSSES AS NOTED. TOENAIL BLOCKING TO TRUSSES WITH (2) - 10d NAILS AT EACH ENO. ATTACH DIAGONAL BRACE TO BLOCKING WITH (5) - 10d NAILS (4) 6d NAILS MINIMUM, PLYWOOD SHEATHING TO 2X4 STD SPF BLOCK 12' MAX. B. THIS DETAIL DOES NOT APPLY TO STRUCTURAL GABLES. DIAG. BRACE 9. DO NOT USE FLAT BOTTOM CHORD GABLES NEXT TO SCISSOR TYPE AT 1/3 POINTS TRUSSES. IF NEEDED 10. 10d AND 16d NAILS ARE 0.131'X3.0' AND 0131'X3.5' COMMON WIRE NAILS RESPECTIVELY. 11. SOUTHERN PINE LUMBER DESIGN VALUES ARE THOSE EFFECTIVE 06-01-12 BY SPIB/ALSC. MINIMUM STUD SIZE SPECIES AND GRADE STUD SPACING WITHOUT BRACE 2X4 L - BRACE DIAGONAL BRACE _ (2) DIAGONAL BRACES AT 1/3 POINTS MAXIMUM STUD LENGTH 2X4 SP #3 i STUD 12" O.C. 3.8-10 5-6-11 6-6-11 11-1-13 2X4 SP #31 STUD 16" O.C. 3.3.10 4-9-12 6-6-11 9-10-15 2X4SP93/STUD 24"O.C. 24M 3-11-3 54-12 8-1-2 2X4 SP #2 12" O.C. 3-10-15 5-6-11 6-6-11 11-6-14 2X4 SP #2 16" O.C. 3-6-11 4-9-12 6-6-11 10-8-0 2X4SP#2 24" O.C. 3-1-4 3-11-3 6-2-9 9-3-13 DIAGONAL BRACES OVER 6' - 3' REQUIRE A 2X4 T-BRACE ATTACHED TO ONE EDGE. DIAGONAL BRACES OVER 12' - G' REQUIRE 2X4 I -BRACES ATTACHED TO BOTH EDGES. FASTEN T AND I BRACES TO NARROW EDGE OF DIAGONAL BRACE WITH 10d NAILS 6' O.C., WITH 3' MINIMUM END DISTANCE. BRACE MUST COVER 90% OF DIAGONAL LENGTH. T OR I BRACES MUST BE 2X4 SPF #2 OR SP #2. MAX MEAN ROOF HEIGHT = 30 FEET EXPOSURE B OR C ASCE 7.10 190 MPH STUD DESIGN IS BASED ON COMPONENTS AND CLADDING. DURATION OF LOAD INCREASE :1.60 CONNECTION OF BRACING IS BASED ON MWFRS. ROOF SHEATHING I •• 1� ._mi, �. �- TRUSSES @ 24' O.C. 2X6 DIAGONAL BRACE SPACED 48' O.C. ATTACHED TO VERTICAL WITH (4) - \ 16d NAILS, AND ATTACHED TO BLOCKING WITH (5) - IOd NAILS. HORIZONTAL BRACE (SEE SECTION A -A) END WALL Manuel Martinez, P.E. # 047182 4620 ParkView Dr St Cloud, FL 34771 FEBRUARY 17, 2017 T-BRACE / I -BRACE DETAIL STDTL09 WITH 2X BRACE ONLY NOTES: T-BRACING / I -BRACING TO BE USED WHEN CONTINUOUS LATERAL BRACING IS IMPRACTICAL. T-BRACE / I -BRACE MUST COVER 90% OF WEB LENGTH. �! THIS DETAIL NOT TO BE USED TO CONVERT T-BRACE / I -BRACE WEBS TO CONTINUOUS LATERAL BRACED WEBS. A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 3494 772409-1010 NAILING PATTERN T—BRACE SIZE NAIL SIZE NAIL SPACING 2X4 OR 2X6 OR 2X8 10d 6" O.C. NOTE: NAIL ALONG ENTIRE LENGTH OF T-BRACE / [-BRACE (ON TWO-PLY TRUSSES NAIL TO BOTH PLIES) NAILS SPACING k BRACE SIZE FOR ONE —PLY TRUSS SPECIFIED CONTINUOUS ROWS OF LATERAL BRACING WEB SIZE 1 2 2X3 OR 2X4 2X4 T-BRACE 2X4 I -BRACE 2X6 2X6 T-BRACE 2X6 I -BRACE 2X8 2X8 T-BRACE 2X8 I -BRACE BRACE SIZE FOR TWO—PLY TRUSS SPECIFIED .CONTINUOUS ROWS OF LATERAL BRACING WEB SIZE 1 2 2X3 OR 2X4 2X4 T-BRACE 2X4 I -BRACE 2X6 2X6 T-BRACE 2X6 I -BRACE 2X8 2X8 T-BRACE 2X8 I -BRACE T-BRACE / I -BRACE MUST BE SAME SPECIES AND GRADE (OR BETTER) AS WEB MEMBER. NAILS NAILS WEB NAILS WEB I -BRACE T-BRACE S E C T I 0 N D E T A I L %nuel Martinez, P.E. # 047182 4620 ParkView Dr St Cloud, FI 14771 FEBRUARY 17, 2017 1 LATERAL BRACING RECOMMENDATIONS I STDTL10 TO MINIMIZE VIBRATION COMMON TO ALL SHALLOW FRAMING SYSTEMS, 2XG 'STRONGBACK' IS RECOMMENDED, LOCATED EVERY B TO 10 FEET ALONG A FLOOR TRUSS. �i NOTE 1: 2X6 STRONGBACK ORIENTED VERTICALLY MAY BE POSITIONED DIRECTLY UNDER THE TOP CHORD OR DIRECTLY ABOVE THE BOTTOM CHORD, SECURELY FASTENED TO THE TRUSS USING ANY A-1 ROOF TRUSSES OF THE METHODS ILLUSTRATED BELOW. 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 NOTE 2: STRONGBACK BRACING ALSO SATISFIES THE LATERAL BRACING REQUIREMENTS FOR THE 772-409-1010 BOTTOM CHORD OF THE TRUSS WHEN IT IS PLACED ON TOP OF THE BOTTOM CHORD, IS CONTINUOUS FROM END TO END, CONNECTED WITH A METHOD OTHER THAN METAL FRAMING ANCHOR, AND PROPERLY CONNECTED, BY OTHERS, AT THE ENDS. INSERT WOOD SCREW THROUGH OUTSIDE FACE OF CHORD INTO EDGE OF STRONGBACK (00 NOT USE METAL FRAMING ATTACH TO VERTICAL ATTACH TO VERTICAL USE DRYWALL TYPE SCREWS) ANCHOR TO ATTACH WEB WITH (3) - 10d SCAB WITH (3) - 10d r TO TOP CHORD NAILS (0.131' X 3') NAILS (0.131' X 3'). I ATTACH TO NAILS (WEB 0 13 XR3 )dL BLOCKING BEHIND THE VERTICAL WEB IS RECOMMENDED WHILE NAILING THE STRONGBACK ATTACH 2X4 VERTICAL TO FACE OF TRUSS. FASTEN TO TOP AND BOTTOM CHORD WITH (2) - 10d NAILS (0.131' X 3') IN EACH CHORD USE METAL FRAMING ATTACH TO VERTICAL ATTACH TO VERTICAL L ANCHOR TO ATTACH WEB WITH (3) - 10d SCAB WITH (3) - Ind TO BOTTOM CHORD NAILS (0.131' X 3') NAILS (0.131' X 3') TRUSS 2X6 4' - 0' WALL STRONGBACK (TYPICAL SPLICE) (BY OTHERS) ATTACH TO CHORD WITH (2) #12 X 3' WOOD SCREWS (0.216' OIAJ INSERT SCREW THROUGH OUTSIDE FACE OF CHORD INTO EDGE OF STRONGBACK (DO NOT USE DRYWALL TYPE SCREWS) THE STRONGBACKS SHALL BE SECURED AT THEIR ENOS TO AN ADEQUATE SUPPORT, DESIGNED BY OTHERS. IF SPLICING IS NECESSARY, USE A 4' - 0' LONG SCAB CENTERED ON THE SPLICE AND JOINED WITH (12) - 10d NAILS (0131' X 3') EQUALLY SPACED. BLOCKING (BY OTHERS) ALTERNATE METHOD OF SPLICING: OVERLAP STRONGBACK MEMBERS A MINIMUM OF 4' - 0' AND FASTEN WITH (12) - 10d NAILS (0.131' X 3') STAGGERED AND EQUALLY SPACED (TO BE USED ONLY WHEN STRONGBACK IS NOT ALIGNED WITH A VERTICAL). Manuel Martinez, P.E. # 047182 4620 ParkView Dr FEBRUARY 17, 2017 A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772409-1010 LATERAL TOE -NAIL DETAIL NOTES: 1. TOE -NAILS SHALL BE DRIVEN AT AN ANGLE OF 45° WITH THE MEMBER AND MUST HAVE FULL WOOD SUPPORT (NAIL MUST BE DRIVEN THROUGH AND EXIT AT THE BACK CORNER OF THE MEMBER END AS SHOWN). 2. THE END DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD. 3. ALLOWABLE VALUE SHALL BE THE LESSER VALUE OF THE TWO SPECIES FOR MEMBERS OF DIFFERENT SPECIES. TOE -NAIL SINGLE SHEAR VALUES PER NOS 2001 (LB/NAIL) DIA SP OF HF SPF SPF-S .131 88.0 80.6 69.9 68.4 59.7 o.135 93.5 85.6 74.2 72.6 63.4 J .162 108.8 99.6 86.4 84.5 73.8 �i .128 74.2 67.9 58.9 57.6 50.3 co Z 0 J .131 75.9 69.5 60.3 59.0 51.1 in .148 81.4 74.5 64.6 63.2 52.5 N M VALUES SHOWN ARE CAPACITY PER TOE -NAIL. APPLICABLE DURATION OF LOAD INCREASES MAY BE APPLIED. EXAMPLE: (3) - 16d NAILS (0162' DIA. X 3.5') WITH SPF SPECIES BOTTOM CHORD FOR LOAD DURATION INCREASE OF 1.15: 3 (NAILS) X 84.5 (LB/NAIL) X 115 (DOL) = 291.5 LB MAXIMUM CAPACITY ANGLE MAY VARY FROM 30" TO 60° 1 4 45.00' ANGLE MAY VARY FROM 30° TO 60" STDTL11 THIS DETAIL IS ONLY APPLICABLE TO THE THREE END DETAILS SHOWN BELOW. VIEWS SHOWN ARE FOR ILLUSTRATION PURPOSES ONLY. SIDE VIEW (2X4) 3 NAILS NEAR SIDE NEAR SIDE NEAR SIDE 45.00° SIDE VIEW (2X6) 4 NAILS NEAR SIDE NEAR SIDE NEAR SIDE NEAR SIDE ANGLE MAY VARY FROM 30° TO 60° 45.000 Nrtinez, P.E. # 047182 4620 ParkView Dr FEBRUARY 17, 2017 1 UPLIFT TOE -NAIL DETAIL I STDTL12 A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772409-1010 THIS DETAIL SHALL BE USED FOR A CONNECTION RESISITING UPLIFT FORCES ONLY. BUILDING DESIGNER IS RESPONSIBLE FOR LOADS IN OTHER DIRECTIONS. NOTES: TOE —NAIL WITHDRAWAL VALUES PER NOS 2005 (LB/NAIL) DIA. SP OF HF SPF SPF—S L7 .131 59 46 32 30 20 Z O .135 60 48 33 30 20 c U7 ('7 .162 72 58 39 37 25 J 2 O .128 54 42 28 27 19 I-_ LD Z Z .131 55 43 29 28 19 W .148 62 48 34 31 21 J J N a Z .120 51 39 27 26 17 0 Z .128 49 38 26 25 17 O .131 51 39 27 26 17 —1 .148 57 44 31 28 20 M 1. TOE -NAILS -SHALL BE DRIVEN AT AN ANGLE OF 30° WITH THE MEMBER AND STARTED 1/3 THE LENGTH OF THE NAIL FROM THE MEMBER END AS SHOWN. 2. THE ENO DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD. 3. ALLOWABLE VALUE SHALL BE BASED ON THE SPECIE WITH LOWER NAIL CAPACITY BETWEEN THE TWO MEMBERS IN THE CONNECTION. VALUES SHOWN ARE CAPACITY PER TOE -NAIL. APPLICABLE DURATION OF LOAD INCREASES MAY BE APPLIED. EXAMPLE: (3) - 16d NAILS (0162' DIA. X 3.5') WITH SPF SPECIES TOP PLATE FOR WIN❑ DOL OF 1.33: 3 (NAILS) X 37 (LB/NAIL) X 1.33 (DOL FOR WIND) = 148 LB MAXIMUM ALLOWABLE UPLIFT REACTION DUE TO WIND FOR WIND DOL OF 1.60: 3 (NAILS) X 37 (LB/NAIL) X 1.60 (DOL FOR WIND) = 177 LB MAXIMUM ALLOWABLE UPLIFT REACTION DUE TO WIND IF THE UPLIFT REACTION SPECIFIED ON THE TRUSS DESIGN DRAWING EXCEEDS 147 LBS (177 LBS) BUILDING DESIGNER IS RESPONSIBLE TO SPECIFY A DIFFERENT CONNECTION. *** USE (3) TOE -NAILS ON 2X4 BEARING WALL +++ USE (4) TOE -NAILS ON 2X6 BEARING WALL NEAR SIDE FAR S1 IE TOP PLATE OF WALL VIEWS SHOWN ARE FOR ILLUSTRATION PURPOSES ONLY IL NAIL NAIL Manuel Martinez, P.E. # 047182 SIDE VIEW END VIEW 4620 ParkView Dr St Cloud, FL 34771 -FEBRUARY 5, 2016 I TYP W NAILER ATTACHMENT I STDTL13 A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772-409-1010 -I .0 X 4 2x2 NAILER ATTACHMENT GENERAL SPECIFICATIONS MAX LOAD: 55 psf Roof Load, 170 mph, ASCE 7-10, 29'-0" ' Mean Height, Exp. B, C or D. Manuel Martinez, P.E. # 047182 April 11, 2016 I TYPICAL ALTERNATE BRACING DETAIL I STDTLI4 FO EXTERIOR FLAT GIRDER TRUSS A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772-409-1010 (4) 12d TRUSS 2411 O.C. 12 VARIES F�:� (4) 12d MAX 3011(2r-6rr) UPLIFT CONNECTION (SEE ROOF TRUSS) 2x6 #2 SP (Both Faces) 24" O.C. EXTERIOR FLAT SIMPSON H5 GIRDER Manuel Martinez, P.E. # 047182 4620 ParkView Dr St Cloud, FL 34771 • y FEBRUARY 17, 2017 I STANDARD REPAIR DETAIL FOR BROKEN CHORDS, WEBS, AND I STDTL15 I DAMAGED OR MISSING CHORD SPLICE PLATES A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772.409-1010 It - TOTAL NUMBER OF NAILS EACH SIDE OF BREAK X (INCHES) MAXIMUM FORCE (LBS) 15% LOAD DURATION SP OF SPF HF 2X4 2X6 2X4 2X6 2X4 2X6 2X4 2X6 20 2X6 20 30 24" 1706 2559 1561 2342 1320 1980 1352 2028 26 39 30" 2194 3291 2007 3011 1697 2546 1738 2608 32 48 36" 2681 4022 2454 3681 2074 3111 2125 3187 38 57 42' 3169 4754 2900 4350 2451 3677 2511 3767 44 66 48' 3657 5485 3346 5019 2829 4243 2898 4347 + DIVIDE EQUALLY FRONT AND BACK ATTACH 2X_ SCAB OF THE SAME SIZE AND GRADE AS THE BROKEN MEMBER TO EACH FACE OF THE TRUSS ( CENTER ON BREAK OR SPLICE) WITH 10d NAILS (TWO ROWS FOR 2X4, THREE ROWS FOR 2X6) SPACED 4' O.C. AS SHOWN (131' DIA. X 3'). STAGGER NAIL SPACING FROM FRONT FACE AND BACK FACE FOR A NET 2' D.C. SPACING IN THE MAIN MEMBER. USE A MIN. 3' MEMBER END DISTANCE. THE LENGTH OF THE BREAK (C) SHALL NOT EXCEED 12'. (C=PLATE LENGTH FOR SPLICE REPAIRS) THE MINIMUM OVERALL SCAB LENGTH REQUIRED-(L) IS CALCULATED AS FOLLOWS: L = (2) X + C •lOd NAILS NEAR SIDE + 10d NAILS FAR SIDE TRUSS CONFIGURATION AND BREAK LOCATIONS FOR ILLUSTRATIONS ONLY THE LOCATION OF THE BREAK MUST BE GREATER THAN OR EQUAL TO THE REQUIRED X DIMENSION FROM ANY PERIMETER BREAK OR HEEL JOINT AND A MINIMUM OF 6' FROM ANY INTERIOR JOINT (SEE SKETCH ABOVE). DO NOT USE REPAIR FOR JOINT SPLICES NOTES: 1. THIS REPAIR DETAIL IS TO BE USED ONLY FOR THE APPLICATION SHOWN. THIS REPAIR DOES NOT IMPLY THAT THE REMAINING PORTION OF THE TRUSS IS UNDAMAGED. THE ENTIRE TRUSS SHALL BE INSPECTED TO VERIFY THAT NO FURTHER REPAIRS ARE REQUIRED. WHEN THE REQUIRED REPAIRS ARE PROPERLY APPLIED, THE TRUSS WILL BE CAPABLE OF SUPPORTING THE LOADS INDICATED. 2. ALL MEMBERS MUST BE RETURNED TO THEIR ORIGINAL POSITIONS BEFORE APPLYING REPAIR AND HELD IN PLACE DURING APPLICATION OF REPAIR. 3. THE END DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD. 4. WHEN NAILING THE SCABS, THE USE OF A BACKUP WEIGHT IS RECOMMENDED TO AVOID LOOSENING OF THE CONNECTOR PLATES AT THE JOINTS OR SPLICES. Manuel Martinez, P.E. 5. THIS REPAIR IS TO BE USED FOR SINGLE PLY TRUSSES IN THE 2X_ ORIENTATION ONLY. # 047182 6. THIS REPAIR IS LIMITED TO TRUSSES WITH NO MORE THAN THREE BROKEN MEMBERS. 4620 ParkVieW Dr FEBRUARY 17, 2017 1 SCAB APPLIED OVERHANGS I STDTL16 A-1 ROOF TRUSSES 4451 ST. LUCIE BLVD. FORT PIERCE, FL 34946 772-409-1010 TRUSS CRITERIA: LOADING: 40-10-0-10 DURATION FACTOR: 1.15 SPACING: 24' O.C. TOP CHORD: 2X4 OR 2X6 PITCH: 4/12 - 12/12 HEEL HEIGHT: STANDARD HEEL UP TO 12' ENERGY HEEL ENO BEARING CONDITION NOTES: 1. ATTACH 2X-SCAB (MINIMUM #2 GRADE SPF, HF, SP, OF) TO ONE FACE OF TRUSS WITH TWO ROWS OF 10d COMMON WIRE NAILS (.148. OIA: X 3') SPACED 6' O.C. 2. THE END DISTANCE, EDGE DISTANCE, AND SPACING OF NAILS SHALL BE SUCH AS TO AVOID UNUSUAL SPLITTING OF THE WOOD. 3. WHEN NAILING THE SCABS, THE USE OF A BACKUP WEIGHT IS RECOMMENDED TO AVOID LOOSENING OF THE CONNECTOR PLATES AT THE JOINTS OR SPLICES. 2X SC NOTE: TRUSS BUILT WITHOUT AN OVERHANG. THIS DETAIL IS NOT TO BE USED WHEN OVERHANG HAS BEEN BROKEN OFF. IMPORTANT THIS DETAIL TO BE USED ONLY WITH TRUSSES (SPANS LESS THAN 400 SPACED 24' O.C. MAXIMUM AND HAVING PITCHES BETWEEN 4/12 AND 12/12 AND TOTAL TOP CHORD LOADS NOT EXCEEDING 50 PSF. TRUSSES NOT FITTING THESE CRITERIA SHOULD BE EXAMINED INDIVIDUALLY. REFER TO INDIVIDUAL TRUSS DESIGN FOR PLATE SIZES AND LUMBER GRADES Manuel Martinez, P.E. # 047182 4620 ParkView Dr