Loading...
HomeMy WebLinkAboutProject InformationManual S Compliance Report Jab: Lot 13 Block 1 waterstone... wrightsofto Date: Dec 16, 2008 Entire House By: SND DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY SANFORD, FL 32771 Phone:407-333-2665 Design Condition Outdoor design DB: Outdoor design WB: Indoor design DB: Indoor RH: r-roject intormation For: ADAMS HOMES 5448 Lugo Street, Fort Pierce, FL 34951 90.4OF Sensible.gain: 24646 Btuh 77.4 OF Latent gain: 4437 Btuh 75.0 OF Total gain: 29083 Btuh 50% Estimated airflow: . 1167 cfm Entering coil DB: 76.6°F Entering coil WB: 63.3°F Manufacturer's Performance Data at Actual Design Conditions Equipment type: SplitASHP Manufacturer: Carrier Model: 25HBC537AP03+FX4DNF037L00 Actual airflow: 1167 cfm Sensible capacity: 26307 Btuh 107% of load Latent capacity: 6437 Btuh 1450 of load Total capacity: 32744 Btuh 113% of load SHR: 80% Heating Equipment Design Conditions Outdoor design DB: 41.0 OF Heat loss: 27336 Btuh Entering coil DB: 69.4OF Indoor design DB: 70.0 OF Manufacturer's Performance Data at Actual Design Conditions Equipment type: SpRASHP Manufacturer: Carrier Model: 25HBC537AP03+FX4DNF037L00 Actual airflow: 1167 cfm Output capacity: 31718 Btuh 116% of load Supplemental heat required: 0 Btuh Backup equipment type: Manufacturer: Actual airflow: Output capacity: Elec strip Model: 1167 cfm 6.4 kW 79%. of load Temp. rise: 17 OF Meets all requirements ofACCA Manual S. Capacity balance: 35 OF Economic balance: -99 cF -*- wrightsoft® 2021 -Apr-1 9 09:42:15 >a,•�• ,.w••w =•mw� Right-Siite@Uriversal202l 2l.O.O2 RSU23828 Page 1 ...rstone2000ATGGL\Lot3BIklWaterstone2000ATGGL.rLp Calc=MJ8 Front Door faces: NW Component Constructions Job: Lot 13 Block 1 Waterstone... wrightsoft® Date: Dec 16, 2008 Entire House By: sND DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phone:407-333-2665 iLroject intormation For: ADAMS HOMES 5448 Lugo Street, Fort Pierce, FL 34951 Design Conditions Location: Indoor: Heating Cooling St Lude Cc Inti, FL, US Indoor temperature (OF) 70 75 Elevation: 26 ft Lati{ude: 28 ON Design TD (OF) Relative humidity 29 15 (%) 30 50 Outdoor: Heating Cooling Moisture difference (grAb) 2.4 56.9 Dry bulb (OF) 41 90 Infiltration: Daily range (OF) - 15 ( L .) Method Simplified Wet bulb (OF) - 77 Construction quality Average Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions or Area U-value Insul. R Htg HTM Loss Clg HTM Gain ft' Btuh/ftz•F ftz°F/Btuh Bt&W Btuh Btu[/ft' Stuh Walls 1.6B-19ad: Knee wall, asphalt shingles roof mat, r-19 kw ins, 1/2" gypsum board int fnsh Blk wall, stucco ezt, r-4 ext bd ins, 8" thk, 3/8"wood shth, 1/2" gypsum board int fish 12C-Osw: Frm wall, stucco ext, r-13 cav ins, 2'k4" wood frm, 16" o.c. stud Partitions 12C-Osw: Frm wall, 1/2" gyp.bd ext, r-13 cav ins, 1/2" gypsum board int fnsh, 2'k4" wood frm, 16" o.c. stud Windows ne 25 0.049 19.0 1.42 36 2.59 65 se 25 0.049 19.0 1.42 36 2.59 65 sw 95. 0.049 19.0 1.42 36 2.59 65 nw 25 0.049 19.0 1.42 36 2.59 65 all 100 0.049 19.0 1.42 142 2.59 259 ne 484. 0.201 4.1 5.83 2820 4.98 2411 se 265 0.201 4.1 5.83 1546 4.98 1322 sw 364 0.201 4.1 5.83 2122 4.98 1814 nw 134 0.201 4.1 5.83 780 4.98 667 all 1247 0.201 4.1 5.83 7269 4.98 6214 sw 192. 0.091 13.0 2.64 506 2.21 424 272 0.091 13.0 2.64 717 1.31 356 2A-2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr low-e innr, 1/4" gap, 1/8" ne 16 0.330 0 9.57 155 12.8 208 thk; NFRC rated (SHGC=0.23);, foreground = asphalt (0.10); 1.42 ft se 32 0.330 0 9.57 310 9.70 314 overhang (5.25 ft window ht, 0.75 ft sep.); 6.67 ft head ht sw 32 0.330 0 9.57 310 9.70 314 all 81 0.330 0 9.57 775 10.3 836 213-2fv: 2 glazing, dr outr, air gas, vnl frm mat, clr low-e innr, 1/4" gap, 1/8" ne 13 0.330 0 9.57 128 18.3 244 thk; NFRC rated (SHGC=0.31); foreground = asphalt (0.10); 1.42 ft overhang (4 ft window ht, 0.75 ft sep.); 6.67 ft head ht 10C-v: 2 glazing, cir outr, air gas, vnl frm mat, dr low-e innr, 1/4" gap, 1/8" se 18 0.550 0 15.9 284 8.20 146 thk; NFRC rated (SHGC=0.70); foreground = asphalt (0.10); 11.67 ft overhang (6.67 ft window ht, 1 ft sep.); 6.67 ft head ht 2A-2ov: 2 glazing, clr outr, air gas, vnl frm mat, clr low-e innr, 1/4" gap, 1/8" se 49 0.330 0 9.57 465 1.90 92 thk; NFRC rated (SHGC=0.23); foreground = asphalt (0.10); 11.67 ft overhang (5.25 ft window ht, 0.75 ft sep.); 6.67 ft head ht wrightsoft® 2021-Apr-1 9 09:42:15 >w •�• ate. eU -• Imo R gk-Sute®Uriversal 2021 21.0.02 RSU23828 Page 1 rstone2000ATGGL1Lor3BlklWaterstore2000ATGGL.np Calc=MJB Front Door faces: NW 2A-2ov: 2 glazing, clr, outr, air gas, vnl frm mat, clr low-e innr, 1/4" gap, 1/8" nw 33 0.330 0 9.57 313 11.5 -375 thk; NFRC rated (SHGC=0.21); foreground = asphalt (0.10); 1.42 ft overhang (5.3 ft window ht, 4 ft sep.); 6.67 ft head ht Doors 11 JO: Door, mtl fbrgl type nw 20 0.600 6.3 17.4 350 17.6 353 11 DO: Door, wd sc type n 18 0.390 0 11.3 201 11.4 203 Ceilings 1613-30ad:Attic ceiling, asphalt shingles roof mat, r-30 cell ins, 1/2" 2173 0.032 30.0 0.93 2016 1.69 3671 gypsum board int fnsh Floors 19C-19cscp: Rr floor, frm flr, 6" thkns, carpet fir fnsh, r-2 ext ins, r-19 cav 360 0.049 30.0 0.49 177 .0.26 94 ins, tight aW ovr, r-11 wall insul 22A-tpl: Bg floor, light dry soil, on grade depth 184 0.989 0 28.7 5277 0 0 i96.C.P� -Pk wrightsofit" 2021-Apr-1909:42:15 ,W•t•a•��w->�m Right-Sute®Uriversal202121.0.02RSU23828 Page rst6ne2000ATGGL1Lot3BIkiWaterstone2000ATGGL.np CaIc=MJ8 Frori Door faces: NW wrightsoft® Project Summary Job: Lot 13 Block 1 Waterstone... Date: Dec 16, 2008 Entire House By. SNq DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phore:407-333-2665 Project • • For: ADAMS HOMES 5448 Lugo Street, Fort Pierce, FL 34951 Notes: DaytonaBch12.10.10VMT RVSD 12=29-10 DCS 8-10-15 JA L. S. 4-19-21 VWK Design Information Weather: St Lude Co Intl, FL, US Winter Design: Conditions Summer Design Conditions Outside db 41 OF Outside db 90 . OF Inside db 70 OF Inside db 75 OF Design TD 29 OF Design TD 15 OF Daily range L Relative humidity 50 Moisture difference 57 gr/Ib Heating Summary Sensible.Cooling Equipment Load Sizing. Structure 21834 Btuh Structure 17731 Btuh Ducts 5502 Btuh Ducts 6915 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh none Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 27336 Btuh Use manufacturer's data y Infiltration Rate/swin multipplier Equipmen1sent eload. 1.00 24646 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces 0 Structure 2950 Btuh Ducts 1487 Btuh Central vent (0 cfm) 0 Btuh Heating Cooling (none) Area (ftz) 2004 2004 Equipment latent load 4437 Btuh Volume (ft3) 18921 18921 Air charges/hour 0.32 0.16 Equipment Total Load (Sen+Lat) 29083 Btuh Equiv. AVF (cfm) 101 50 Req. total capacity at 0.75 SHR 2.7 ton Heating Equipment Summary Cooling Equipment Summary Make Carrier Make Carrier Trade CARRIER Trade CARRIER Model 25HBC537AP03 Cond 25HBC537AP03 AHRI ref 204837926 Coil FX4DNF037L00 Efficiency 8.5 HSPF AHRI ref 204837926 Efficiency 12.5 EER,16 SEER Heating input Heating output 34600 Btuh @ 47OF Sensible cooling Latent cooling 26250 8750 Biuh Btuh Temperature rise 27 OF Total cooling 35000 Btuh Actual airflow 1167 cfm Actual airflow 1167 cfm Airflowfactor 0.043 cfm/Btuh Air flow factor 0.047 cfm/Btuh Static pressure 0.30 in H2O Static pressure 0.30 in H2O Space thermostat Load sensible heat ratio 0.85 Capacity balance point = 35 OF Backup: Input = 6 kW, Output = 21677 Btuh,100 AFUE Calculations approved byACCA to meet all requirements of Manual J 8th Ed. t - wrightsoft- 2021-Apr-1909:42:15 Right-Sute@Uriversal 202l 2l.O.O2 RSU23828 Page 1 rstor)e2000ATGGL\Lot3BikIWatersbe2000ATGGL.rLp Calc=MJ8 FrorrtDoor faoes:NW -- wrightsoft® Right-JO Work sheet Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY SANFORD, FL 32771 Phore:407-333-2665 Job: Lot 13 Block 1 Waterston 20... Date: Dec 16, 2008 By: SND 1 Room name Entire House BR4 2 3 4 5 Exposed wall Room height Room dimensions Room area 211.9 it 9.4 It d 2005.0 ftz 13.9 ft 8.9 ft heat/000l 1.0 x 177.5 It 177.5 ft2 Ty Construction number U-value (Btu"2_'n Or HTM (Btuh/ft2) Area (ft2) or perimeter (ft) Load (Btuh) Area (ft) or perimeter (ft) Load (Btuh) Heat Cool Gross N/P/S Heat Cool Gross NIPS Heat Cool 6 11 W W TE� 1613-19ad Blk MI, stucco eM 2A-2ov 26-2N 16B-19ad Blkwall,stuccoe)d 1OC-v 2A-2ov 2A-2ov 12C-Osw' ' 2A-2ov 1613-19ad Blk Ml, stucco e)d - 1613-19ad Blk volf, stucco e# " . 2A-2ov 11,10. 12C-Osw 11DO 166-30ad 19C-19cscp 22A-1pl' 0.049 0201 0.330 0.330 0.049 0.201 0550 0.33q 0,330 .0.091 0.330 0.049 0201 0.049 0.201 0.330 0.600 OA91 0.390 0.032 0.049 0289 ne ne ne ne se se se se ,se sw sw sw sW nw nw nw nw - n '- 1.42 5.83 957 9.57 1A2 5,83 15.95 957 957 "2.64 957 1.42 5.83 1.42 -5.83 957 17.40 2.64 11.31 0.93 0.49 28.6.8 259 428 12B4 1822 259 4.98 820 9.70 1.90 - - 221 9.10 2.59 4.98 259 4.98 11.47 1758 121 11.43 1.69 026 0.00 25 513 16 13 25 364 18 32 49 : 2.24 32 25 364 25 187 33 20 289 18 2173 360 1646 25 484 0 0 25 265 18 10 49 " ' 192 10 25 364 25 134 0 20 272 18 2173 360 184 36 2820 155 128 36 .1546 284 310 465 .. 506 310 36 2122 36 780 313 350 717 201 2016 177 6277 65 2411 208 244 65 1322 146 314 92 424 314 65 ,1814 65 667 375 353 356 203 3671 94 - 6 0 b 0 0 0 0 0 0 0 112 16 0 0 0 0 0 0 0 0 200 178 0 0 0 0 0 _ 0 0 0 0 0 . 96 5 0 0. 0 0 0 0 0 0 200 178 0 0 0 0 0 0 0 0 0 0 253 155 0 0 0 0 0 0 0 0 185 87 0 0 0 0 0 0 .0 0 0 0 212 157 0 0 0 0 0 0 0 0 337 46 0 V�1 l_{, W W W v� I--G D P C F F 6 c) AED excursion 360 153 Envelope loss/gain 18618 13627 680 906 12 a) Infiltration b) Room ventilation 3216 0 854 0 206 0 55 0 13 Internal gains: Occupants@ 230 Appliances/other 5 1150 2100 0 0 0 Subtotal (lines6 to 13) 21834 17731 886 961 14 15 Less external load Less transfer Redistribution Subtotal Duct loads 25 % 39% 0 0 0 21834 5502 0 0 0 17731 6915 25% 39 % 0 0 0 886 223 .0 0 0 961 375 Total room load Air required (dm) 27336 1167 24646 1167 1109 47 1335 63 Calculations approved bvACCAto meet all requirements of Manual J 8th Ed. �- wrrigF�tsoft- 1\ , ; : 2021-Apr-19 09:42:15 Right-Sute®Uriversal 2021 21.0.02 RSU23828 Page 1 ...rstorte2000ATGGL\Ldt3BIkIWatersbne2ooOATGGL.rLp Calc=MJ8 Frorft Door faces: NW wrightsoft- Right-M Worksheet Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY SANFORD, FL 32771 Phone:407-333-2665 Job: Lot 13 Block 1 Waterston 20... Date: Dec 16, 2008 By. SND 1 Room name BR 2 BATH 2 2 Exposed wall 14.0 it 5.0 It 3 Room height 8.9 ft heat/cool 102 ft heat/000l 4 Room dimensions 13.0 x 14.0 It 8.0 x 5.0 ft 5 Room area 182.0 ftz 40.0 ftz Ty Construction U-value Or HTM Area (ftz) Load Area (ftz) Load number (Btuh/ftz F) (Btuh/ftz) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P5 Heat Cool Gross N/PrS Heat Cool 6 W 166.1 gad _ 0.049 ne 1.42 259 0 0 0 " 0. 0 0 '0 0 Blk well, stucco e)d 0.201 ne 5.83 4.98 0 0 0 0 0 0 0 0 2A-2ov. OZ30 ne 957 1224 0 0 0 0 0 0 0 0 2B-2fv 0.330 ne 957 18.32 0 0 0 0 0 0 0 0 11 W • 168.19ad - 0.049 se 1.42 '.259 . ' 0 � 0 '0 0 0 ' 0 0 0 VVV���lll Blk well, stucco ext 0201 se 5.83 4.98 0 0 0 0 0 0 0 0 10C-v 0.550 se 1595 820 0 0 0 0 0 0 0 0 2A-20v 0.330 se 957 9.70 0 0 0 0 0 0 0 0 2A-20v 9230 se .957 1.90 0 0 0 0 0 0 0 0 12C-Osw 0.091 sw 2.64 .. .221 112 96 253 212 0 0 0 0 2A-2ov 0.330 sw 957 9.70 16 .5 155 157 0 0 0 0 W 16B-19ad 0.049 sw 1.42 259 0 0 0 0 0 0 0 0 W $Ik wall, stucco ext 0.201 sw 5.83 4.98 0 0 0 0 47 272 233 W 16B-19ad 0.049 nw 1 A2 259 0 0 0 0 0 -47 0 . 0 0 Blk well, stucco ext 0201 nw 5.83 428 0 0 0 0 0 0 0 0 2A-20v . 0.330 "nw '957 11.47. 0 0 0 0_ 0 0 0 0 11J0, 0.600 nw 17.40 17.58 0 0 0 0 0 0 0 0 P 12C-Osw 0.091 - 2.64 1.31 0 0 0 0 0 0 0 A 11 DO 0.390 n 11.31 11.43 0 0 0 0 0 0 0- 0 C 16B-30ad ` 0.032 0.93 1.69 205 205 190 346 ' - 45 45 42 76 F 19C-19cscp 0.049 OA9 026 182 182 90 48 0 0 0 0 F 22A-Ipl 0.989 28.68 0.00 0 0 0 0 40 " '8 ' 143 0 6 c) AED excursion 153 -13 Envelope losstgain 687 916 4571 296 12 a) Infiltration 206 55 86 23 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Applianoestother 0 0 Subtotal (lines 6 to 13) 893 970 543 318 Less external load 0 0 0 0 Lesstransfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 893 970 543 318 151 Duct loads 25 % 39 % 225 378 25 % 39 % 137 124 Total room load 1118 1348 679 442 Air required (cfm) 48 64 29 21 Calculations proved byACCAto meet all requirements of Manual J 8th EdbyACCAto meet all requirements of Manual J 8th Ed Page 2 2021-Apr-190a Right-Srite®Unversal 2021 21.0.02 RSU23828 Page 2 rstore2000ATGGL\Lot3BIk1WatersbrL-2000ATGGL.rLp Calc=MJ8 Front Door faces: NW -�- W. e1g. Iiuow Right-M Worksheet Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY, SANFORD, FL 32771 Phore:407-333-2665 Job: Lot 13 Block 1 Waterston 20... Date: Dec 16, 2008 By: SND 1 Room name SR 3 UTIL 2 Exposed wall 36.0 ft 14D It 3 Room height 9.3 ft heat/000l 9.3 8 heat/000l 4 Room dimensions 1.0 x 145.0 It ID x 67.0 It 5 Room area 145.0 ft2 67.0 ftz Ty Construction U-value Or HTM Area (ftz Load Area (ftz) Load) number (Bluh4t2-9 (13tuh/112) or perimeter (ft) (Btuh) or perimeter, (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 W 166.19ad _ 0.049 ne 1.42 259 .0 0 0 0 0 0 .0 0 Blk wall, stucco ed 0.201 ne 5.83 4.98 103 103 598 512 0 0 0 0 2A-2ov 0,330 ne 957 12B4 0 0 0 0 0 0 0 0 26-2fv 0.330 ne 9.57 18,32 0 0 0 0 0 0 0 0 11 W 166-19ad 0.049 se 1.42 259 0 0 0 0 0 0 0 0 Blk well, stucco ext 0.201 se 5.83 4.98 0 0 0 0 0 0 0 0 1OC-v 0550 se 15S5 820 0 0 0 0 0 0 0 0 2A-2ov 0.330 se 957 9.70 0 0 0 0- 0 0 0 0 2A-2ov 0.330 se 957 ISO 0 0 0 0 0 0 0 0 12/ .. 12C-0sw 0.091 sw 2.64 221 .. 0 0 .0 0 0 0 0 0 t-G 2A-2ov 0.330 sw 957 9.70 - 0 .0 .0 0 0 0 0 0 W 16B-19ad 0.049 sw 1.42 . 259 0 0 0 0 0 0 0 0 W : Blk dull, stu000 e)d .. 0201 sw 5.83 ' 4-48 131 . 131 762 651 0 0 0 '0 W 166-19ad 0.049 nw 1.42 259 0 0 0 0 0 0 . 0 0 16 Blk MI, stucoo e)d . 0.201 nw 5B3 4S8 103 . 70 408 349 0 0 0 0 2A-2ov q 0.330 : nw 957 11.47 33 0 313 375 0 0 0 0 11JO 0.600 nw 17.40 1758 0 0 0 0 0 0 0 0 P 12C-Osw 0.091 - 2.64 1.31 0 0 0 0 131 113 298 148 11 DO . 0.390 n 11.31 11.43 0 0 0 0 18 18 201 203 C 16B-30ad 0.032 : '- 0.93 1.69 145 145 135 245 67 .67 ' 62 113 F 19C-19aEp 0.049 OA9 026 0 0 0 0 0 0 0 0 F 22A-tpl OS8.9 28.68 0.00 145 :. 36 1033 0 67 14 402 0 6 c) AED excursion 204 -40 Envelopeloss/gain 3248 2335 963 424 12 a) Infiltration 617 164 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Oocupants@ 230 0 0 0 0 Applianoss/other 0 600 Subtotal (lines 6 to 13) 3865 2499 963 1024 Less external load 0 0 0 0 Lesstransfer 0 0 0 0 Redistribution 01 0 0 0 14 Subtotal 3865 2499 963 1024 15 Duct loads 25% 39% 974 975 25% 39% 243 399 Total room load 4839 3474 1 1205 1423 Air required (dm) 207 164 151 67 Calculations approved byACCAto meet all requirements of Manual J 8th Ed 4 wrligF�tsoft- A Rigft-Su2021-Apr-I9 69:42:15te®Uriversal 2021 21.0.02 RSU23828 Page 3 rstone2000ATGGULot3BIklWaterstore2000ATGGL.np Cale=MJ8 Front Door faces: NW - - wrlghtsoft- Right-M Worksheet Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY SANFORD, FL 32771 Phone:407-333-2665 Job: Lot 13 Block 1 Waterston 20... Date: Dec 16, 2008 By: SND 1 Room name MBATH LNING/DIN/FOY 2 Exposed "all 22.0 ft 20D ft 3 Room height 9.6 ft heat/cool 9.3 ft . heat/cool 4 Room dimensions 10.0 x 19.0 ft 1.0 x 345.0 ft 5 Room area 120.0 ft2 345.0 ft2 Ty Construction U-value Or HTM Area Area (ft2) Load number (Btuh/tz9 (Btuh/ft2) or perimeter (ft) �gtuh or. perimeter , (ft) (Btuh) Heat Cool Gross N/PrS Heat Cool Gross N/P/S Heat Cool 6 W 16B 19ad 0.040 ' ie 1.42 2.59 0 0 0 0_ 0 0_ 0 0 Blk v dl, stuoca ext 0201 ne 5.83 428 112 99 575 492 37 37 218 186 2A-2ov 0230 ne 9.57 12B4 0 0 0 0 0 0 0 0 2B-2fv 0.330 ne 957 18.32 13 0 128 244 0 0 0 0 11 W 18B-19ad 0.049 se 1.42 : 259 > 0 0 -0 0 0 0 0 0 wall, stucco ext 0.201 se 5.83 4.98 0 0 0 0 0 0 0 0 T4Blk IOC-v 0550 se 15.95 820 0 0 0 0 0 0 0 0 2A-2ov 2A-2ov 0.330 0230 se 957 9.57 9.70 0 0 0 0 0 0 0 I 0 se 1.90 0 0 0 0 0 0 0 0 Vt/ L- 12C-Osw .0.091 sw 2.64 . 221 ., 0 0 0 0 0 0 0 0 2A-2ov 0.330 sw 957 9.70 0 0 -0 0 0 0 0 0 G W 16B-19ad 0.049 sw 1.42 259 0 0 0 0 0 0 0 0 W Blk tiall, stucco ext . , 0201 sw 5,83 4.98 0 0 0 0 0 0 0 0 W 16B-19ad 0.049 nw 1.42 259 0 0 0 0 . 0 0 0 0 Blk v�ell, stu000 e)d 0.201 ,nw' 5B3 4.98 0 . - 0 0 '0 84 64 372 318 2A-2ov 0,330 nw 957 11.47 0 0 0 0 0 0 0 0 111,10 0.600 nw 17AO 1758 0 0 0 0 20 20 350 353 PI - 12C-Osw 0.091 - 2.64 1.31 93 93 246 122 65 65 172 86 11 DO 0290 n 11.31 11.43 0 0 0 0 0 0 0 0 --D C 16B•30ad 0.032 - 0.93 1.69 137 137 127 231 346 346 321: 584 F 19C-19cscp 0.049 0.49 026 0 0 0 0 0 0 0 0 F 22A-tpl " 0.989 ' - 28.68 0.00 120 22 631 0 345 -20 . . - 574 0 6 c) AED excursion -43 -69 Envelope loss/gain 1707 1046 2007 1458 12 a) Infiltration 206 55 223 59 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 1 230 Appliances/other 0 0 Subtotal (lines 6 to 13) 1913 1100 2229 1748 Less edemalload 0 0 0 0 Lesstransfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 1913 1100 2229 1748 15 Dud loads 25 % 39 % 482 429 25 % 39 % 562 682 Total room load 2395 1530 2791 2429 Air required (cfm) 102 72 119 115 Calculations approved bvACCAto meet all requirements of Manual J 8th Ed 4jrA; wrightsoft- A Right-SuteOUriversal 2021 21.0.02 RSU23828 2021-Apr-19 09.,&15 ...rstone2000ATGGL1Lot3BIk1Waterstone2000ATGGL.np Calc=tv1J8 Front Door faces: NW` Page 4 - d- wrightsoft, Right-JO Worksheet Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCOWAY,,SANFORD,•FL32771 Phone:407-333-2665 Job: Lot 13 Block 1 Waterston 20... Date: Dec 16, 2008 By: SND 1 Room name WIC 2 WIC 1 2 F>posed wall 10.0 It 0 It 3 4 Room height 9.6 ft . heaticool 9.6 ft heat/000l Room dimearensions 5 4.0 x 10.0 ft 6.0 x 6.0 ft Room 40.0 ftz 36.0 ftz Ty Construclion U-value Or HTM Area (ftz) Load Area (ftz) Load number (BtuWfl (Btuh4t2) or perimeter (ft) (Btuh) I or perimeter (ft) (Btuh) Heat Cool Gross N/PrS Heat Cool Gross N/P/S Heat Cool 6 W 1613-19ad 0.049 rue 1.42 259 0 0 0 0 0 0 0 0 Blk vdl, stucco eM 0.201 ne 5.83 4.98 93 93 544 465 0 0 0 0 2A-2ov 0.330 he 9.57 12B4 0 0 0 0 0 0 0 0 2B-2fv 0.330 ne 957 18.32 0 0' 0 0 0 0 0 0 11 W 168-19ad 0.049 se 1.42 .259 0 0 0 0 0 0 0 0 VVV���lll Blk Hell, stucco eM 0201 se 5.83 4.98 0 0 0 0 .0 0 0 0 10C-v OB50 se 15.95 820 0 0 0 0 0 0 0 0 2A-2ov 0.330 se 957 9.70 0 0 0 0 0 0 0 0 2A-2ov 0330 se ; ,9.57 1.90 0 0 0 0 10 0 0 0 12C-Osw 0.091 sw 2.64 .. 221 .,. 0 0 0 0 0 0 0 0 2A-2ov 0330 sw 957. 9.70 0 -0 0 0 0 0 0 0 W 166-19ad 0.049 sw 1.42 259 0 0 0 0 0 0 0 0 W Blk MI, stucco ext 0.201 sw 5,83 4.98 0 0 0 0 0 0 0 0 W 1613-19ad ' 0.049 nw 1.42 259 0 0 0 0 0 0 0 0 �j Blk v all, stucco eM 0.201 nw 5.83 428 0 0 0 0 0 0 0 0 2A-2ov' 0.330 'nw 957 11.47 0 0 0 0 0 0 0 0 --G. �--D 11J0 0.600 nw 17.40 17.68 0 0 .0 0 0 0 0 PI - L-D 12C-Osw 0.091 - 2.64 121 0 0 0 0 0 0 0 .0 0 11 DO 0290 n 11.31 11.43 0 0 0 0 0 0 0 0 C F 1613-30ad 0.032 -' 0.93 1.69 46 46 42 77 41 :41 38 69 19C-19c scp 0.049 0.49 026 0 0 0 0 0 0 0 0 F 22A-1pl 0.989 28.68 0.00 40 10 287 0 36 0 0 0 6 c) AED excursion -22 3 Envelopeloss/gain 873 520 38 67 12 a) Infiltration 171 45 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants@ 230 0 0 0 0 Appliancesrother 0 0 Subtotal (lines 6 to 13) 1044 565 38 67 Less extemal load 0 0 0 0 Lesstransfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 1044 565 38 67 15 Ductloads 25% 39% 263 220 25% 39% 10 26 Total room load Air required (ctm) 1308 786 48 93 56 37 2 4 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. A -� wrigtitsoft^ Right-Su2021-Apr-1909:42:15 te®Uriversal 2021 21.0.02 RSU23828 Page 5 rstore2000ATGGL\Lot3B[klWaterstDre2000ATGGL.rLp Calc=MJ8 Front Door faces: NW - wrightsoft- Right-M Worksheet Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY SANFORD, FL 32771 Phone:407-333-2665 Job: Lot 13 Block 1 Waterston 20... Date: Dec 16; 2008 By: SND 1 2 3 4 5 Room name Exposed wall Room height Room dimensions Room area w M BR 32.0 ft 9.6 ft heaV000l 1.0 x 300.0 ft 300.0 ftz KIT 0 It 92 ft heat/cool 1.0 x 126.5 ft 126.5 ftz Ty Construction number LI-value (Btuh/ftz Or HTM (Btuw) Area (ft') or perimeter (ft) Load (Btuh) Area (ftz) or perimeter , (ft) Load (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/PIS Heat Cool 6 11 W W 16B-19ad Blk wall, stuao eid 2A-2ov 2B-2fv 160-19ad Blk wall, stuom e)d 10C-v 2A-2ov 2A-2ov I. 12C-Osw 2A-2ov 1613-19ad Blk wall, stuom e)d .. 16B-19ad Blk mall, stuoca'eid 2A-2ov 11J0 12C-Osw 11 DO 16B-30ad " 19C-19cscp 22A-tpl' 0.049 0.201 0.330 0.3,30 0.049 0201 0.550 0230 0230 0.091 0230 0.049 0201 0.049 0.201 0.330 0.600 0.091 0.390 0.032 0.049 0289 ne ne rue ne se se se se se sw sw sw sw. nw nw nw nw - n 1.42 5.83 957 9.57 1.42 5.83 15.95 9,57 957 2.64 957 1 A2 5.83 1.42 5.83 957 17.40 2.64 11.31 0.93 OA9 28.68 2.59 4.98 12.84 18.32 259 4.98 820 9.70 1.90 221 9.70 259 4.98 2.59 4.98 11.47 1758 1.31 11.43 1.69 026 ODD 0 168 16 0 0 131 0 32 0 0 0 0 0 0 0 0 0 0 0 340 0 300 0 152 0 0 0 98 0 10 0 0. 0 0 0 0 0 0 0 0 0 340 0 32 0 885 155 0 0 573 0 310 0 .-. 0 -0 0 0 0 0 0 0 0 0 316 0 918 0. 757 208 0 0 490 0 314 I 0 0 0 0 0 0 0 0 0 0 0 575 0 :' 0 0 0 0 0 0 0 0 . 0 0 0 0 0 0 0 0 0 0 0 0 ' 127 0 127 0' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 127 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 0 0 0 117 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 • 0 A 0 214 0 0 W W W P C F F 6 c) AED excursion 203 -54 Envelope losstgain 3156 2546 117 160 12 a) Infiltration b) Roomventilation 548 0 146 0 0 0 0 0 13 Internal gains: OocupantsCa 230 Appliancestother 1 230 3001 0 0 1200 Subtotal (lines 6 to 13) 3704 3221 117 1360 14 15 Less e)demal load Less transfer Redistribution Subtotal Dud loads 25% 39% 0 0 0 3704 933 0 A 0 3221 1256 25 % 39 % 0 0 0 117 30 0 0 0 1360 530 Total room load Air required (cfm) 4638 198 4477 212 147 6 1890 90 Calculations approved byACCAto meet all requirements of Manual J 8th Ed. •- wr➢ghtsoft- A Right-Sute® Uriversal 2021 21.0.02 RSU23828 2021-Apr-19 0 Page 6 rstone2000ATGGL\Lot3BlklWaterstore2000ATGGL.na p Calc=MJ8 Front Door 9 1- wrightsoftd Right-JO Worksheet Entire House DEL -AIR HEATING AND AIR CONDITIONING 531 CODISCO WAY SANFORD, FL 32771 Phone:407-333-2665 Job: Lot 13 Block 1 Waterstone 20... Date: Dec 16; 2008 By: SND' 1 Room name NOOK GREAT RM 2 3 4 5 Exposed wall Room height Room dimensions Room area 10.0 ft 9.8 It heaV000l 10.0 x 10.0 ft 100.0 ftz 35.0 ft 9B ft heat/000l 1.0 x 326.0 It 326.0 ftz Ty Construction number U-value (Btuhfltz-`F) Or HTM (BtuhHtz) Area (ftz) or perimeter (ft) Load (Btuh) Area (ft!) or perimeter (ft) Load (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 11 W W VVV���lll 166-1gad Blk Ml, stucco ext 2A-2ov 2B-2fv 1613-19ad Blk wall, stucco ext 1OC-v 2A-2ov 2A-2ov 12C-Osw 2A-2ov 1613-19ad Blk Ml, stucco e# 1613-19ad Blk vdI, sluo)o ext 2A-2ov '. 11J0 12C-Osw 11D0_ 161330ad 19C-19tscp 22A-tpC . 0.049 0.201 0.330 0,330 0.049 0.201 0550 0.330 0330 0.091 0.330 0.049 0201 0.049 0.201 0.330 0.600 0.091 0290 0.082 0.049 0.989 ne ne ne ne se se se se se sw sw sw sw nw nw 'nw nw - n - 1,42 5B3 957 957 1.42 5.83 15.95 957 9.57 ` 2.64 957 1.42 5.83 1.42 5.83 957 17.40 2.64 11.31 Ob3' 0.49 28.68 259 4.98 12.84 1832 259 4.98 820 9.70 1.90 221 9.70 259 4-% 259 - 4.98 11.47 17.58 131 11.43 1.69 026 0.60 0 0 0 0 0 93 0 0 16 0- .. 0 0 0 0 0 0 0 0 0 112 0 too 0 0 0 0 -0 77 0 I0 II6 0 0 0 _ 0 0 0 0 0 0 0 112 0 16 0 0 0 0 -,0. 450 0 0 155 0 0 0 0 0 0 0 0 0 0 104 0 287 0 0 0 0 0 384 0 0 31 0 0 0 0 0 '0 0 0 0 0 189 0 0 25 0 0 0 25 140 18 0 32 0 0 25 187 25 0 0 0 0 0 ' 364 0 326 26 0 0 0 25 90 18 0 32 0 0 25 187 25 0 0 0 0 0 364 0 '35 36 0 0 0 36 524 284 0 310 0 0 36 - 1088 36 0 '0 0 0 0 338 : 0 1004 65 0 0 0 65 448 146 0 62 0 .0 65 930 65 0 0 0 .0 0 615 0 0 W l-G W W W P L-D, C F F 6 c) AED exairsion -9 -100 Envelopeloss/gain 995 595 3689 2359 12 a) Infiltration b) Room ventilation 171 0 45 0 783 0 0 20 0 0 13 Internal gains: Occupants@ 230 Applianoeslother 0 0 0 3 690 0 Subtotal (lines 6 to 13) 1166 641 4472 3257 14 15 Less external load Lesstransfer Redistribution Subtotal Duct loads 25% 39% 0 0 0 1166 294 0 0 0 641 250 25% 39% 0 0 0 4472 1127 0 0 0 3257 1270 Total room load Air required (clm) 1460 62 891 42 5599 239 4527 214 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. �, wr ygF�tsof!^ 2021-Apr-19 09:42:15 . A Righ-S Lite@ Uriversal 2021 21.0.02 RSU23828 Page rstore2000ATGGL\Lot3BIklWatersbre2000ATGGL.rLp Calc=MJ8 Front Door faces: NW - wrightsoft® Duct System Summary Entire House DEL -AIR HEATING AND AIR CONDITIONING - 531 CODISCO WAY, SANFORD, FL 32771 Phone:407-333-2665 eLroject information For: ADAMS HOMES 5448 Lugo Street, Fort Pierce, FL 34951 Job: Lot 13 Block 1 Waterston... Date: Dec 16, 2008 By: SND Heating Cooling External Static pressure 0.30 in H2O 0.30 in H2O Pressure losses 0.06 in H2O 0.06 in H2O Available static pressure 0.24 in H2O 0.24 in H2O Supply / return available pressure 0.120 / 0.120 in H2O 0.120 / 0.120 in H2O Lowest friction rate 0.205 in/100ft 0.205 in/100ft Actual air flow 1167 cfm 1167 cfm Total effective length (TEL) 117 ft SupplyDetail Table Name Design (Btuh) Htg (cfm) Clg (cfm) Design FR(iri) rDiam HxW Duct Mati Actual Ln (ft) Ftg.Egv Ln (ft) Trunk BATH 2 h 679 29 21 0.221O Ox 0 VIFx 23.7 85.0 st3 BR2 c 1348 48 64 0.225.0 Ox 0 VIFx 21.5 85.0 SO BR3 h 4839 207 1.64 0.213 8.0 Ox0 VIFx 27.9 85.0 SO BR4 c 1335 47 63 0.214 6.0 Ox 0 VIFx 27.1 85.0 st1 GREATRM h 5599 239 214 0.212 9.0 Ox0 VIFx 28.4 85.0 sti KIT c 1890 6 90 0.217 6.0 Ox 0 VIFx 25.7 85.0 st1 LNING/DIN/FOY h 2791 110 115 0.309 6.0 Ox 0 VIFx 7.6 70.0 MBATH h 2395 102 72 0.230 6.0 Ox0 VIFx 19.4 85.0 st2 M BR c 4477 198 212 0.219 8.0 Ox 0 VIFx 24.7 85.0 st2 NOOK h 1460 62 442 0.205 6.0 Ox 0 VIFx 32.3 85.0 st1 unL c . 1423 51 67 0.316 5.0 Ox 0 VI Fx 6.0 76.0 WIC 1 c 93 2 4 0.235 4.0 Ox 0 VIFx 17.0 85.0 st2 WIC 2 h 1308 56 37 0.228 5.0 Ox 0 VI Fx 20.1 85.0 st2 . Supply Trunk Detail Table Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm) (cfm) FIR (fpm) (in) (in) Material Trunk sti PeakAVF 355 409 0.205 521 12.0 0 x 0 VinlFlx st2 PeakAVF 358 326 0.219 657 10.0 0 x 0 VinlFlx SO PeakAVF 283 249 0.213 519 10.0 0 x 0 VinlFlx * wrightsoft® 2021-Apr-1 9 09:42:16 ^- Right-Sute®Uriversal2021 21.0.02 RSU23828 Page 1 ACCA...rstorL-2000ATGGL1Lot3BIklWatersmre2000ATGGL.nQ Calc=MJ8 Frorft Door faoes: NW Return Branch Detail Table Name Grille Size (in) Htg (cfm) Clg (cfm) TEL (ft) Design FR Veloc (fpm) Diam (in) H x W (in) Stud/Joist Opening (in) Duct Mat Trunk rb2 Ox 0 1167 1167 0 0 0 0 Ox 0 VIFx weightsoftm 2021-Apr-1909.,42:16 �� �w•����w -w�ma, Right-Wte®Uriversal202121.0.02RSU23828 Page ��...rstone2000ATGGL\Lot3BIklWaterstore2000ATGGL.np Calc=MJ8 Front Door faces: NW 2020 -AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA a Project Name: Lot 3 Phase 1 Waterstone 2000 ATGGL Builder Name: ADAMS HOMES Street: 5448 Lugo Street Permit Office: City, State, Zip: Fort Pierce , FL , 34951 Permit Number: Y Owner: Jurisdiction: 661000 w Design Location: FL, ST_LUCIE_CO_INTL v COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air -permeable insulation shall requirements The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. Breaks or joints in the air barrier shall be sealed. Ceiling/attic The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit the insulation and any gaps in the air barrier shall be sealed. shall be aligned with tl�e air barrier. Access openings, drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity sealed. with a material having a thermal resistance of R-3 Knee walls shall be sealed. per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/doorjambs and framing, and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (including insulation. maintain permanent contact with the underside of above -garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing, or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class l vapor retarder with overlapping joints taped. shallbe permanently attached to the crawlspace wall . Shafts, penetrations Duct shafts, utility penetrations, and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit, or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spac as. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the finished surface. thermal envelope shall be airtight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls, or insulation that on installation readily conforms to available space shall L-xtpnd behind piping and w'r'ng. Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterlorwalls boxes or air -sealed boxes shall be installed. HVAC register boots HVAC supply and return register boots that penetrate building thermal envelope shall be sealed to the sub -floor, wall covering or Concealed When required to be sealed, concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. ------ Caulking or other adhesive sealants shall not be used to fill voids ire _s I__._._II_ PPI__ . ... —----- I—1----•—•• �• •�� •....... ... ..... ..v uuvva.ulluV rrlall uIV rI VVIJIVIIJ VI IVV-YV V. 4/19/2021 9:51 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 1 of 1 FORM R405-2020 RESIDENTIAL ENERGY CONSERVATION CODE DOCUMENTATION CHECKLIST Florida Department of Business and Professional Regulation Simulated Performance Alternative (Performance) Method Applications for compliance with the 2020 Florida Building Code, Energy Conservation via the Residential Simulated Performance Alternative shall include: ❑ This checklist ❑ Form R405-2020 report ❑ Input summary checklist that can be used for field verification (usually four pages/may be greater) ❑ Energy Performance Level (EPL) Display Card (one page) ❑ HVAC system sizing and selection based on ACCA Manual S or per exceptions provided in Section R403.7 ❑ Mandatory Requirements (five pages) Required prior to CO: ❑ Air Barrier and Insulation Inspection Component Criteria checklist (Table R402.4.1.1 - one page) ❑ A completed 2020 Envelope Leakage Test Report (usually one page); exception in R402.4 allows dwelling units of R-2 Occupancies and multiple attached single family dwellings to comply with Section C402.5 ❑ If Form R405 duct leakage type indicates anything other than "default leakage", then a completed 2020 Duct Leakage Test Report - Performance Method (usually one page) 4/19/2021 9:50:54 AM EnergyGauge@ USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1 Duct Leakage Test Report Residential Prescriptive, Performance or ERI Method Compliance 2020 Florida Building Code, Energy Conservation, 7th Edition IJurisdiction: 661000 Builder: ADAMS HOMES Address: 5448 Lugo Street City: Fort Pierce System 1 cfm25 System 2 cfm25 System 3 cfm25 Sum of others cfm25 Total of all cfm25 2004 Qn Total of all Total Conditioned systems Square Footage PASS [:] FAI L 1:1 Permit #: V Community: Lot: 3-1 State: FL Zip: 34951 cfm25 (Total) dly leak free" Qri Total must be less than or Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC380 by either individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (i), Florida Statutes. I r t Company Name: Phone: I hereby verify that the above duct leakage testing results are in accordance with the Florida Building Code requirements with the selected compliance path as stated above, either the Prescriptive Method or Performance Method. Signature of Tester: Date of Test: Printed Name of Tester: License/Certification #: Issuing Authority: 4/19/2021 9:52:00 AM EnergyGauge@ USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1 Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2020 Florida Building Code, Energy Conservation, 7th Edition Jurisdiction: 661000 Permit #: 1. Jbb,lnformation Builder: ADAMS HOMES Community: Lot: 3-1 Address: 5448 Lugo Street City: Fort Pierce State: FL Zip: 34951 Alr Leakage Test Resuits Passing results must meet either,the Performance, Prescriptive or ERI ethod O ,PRESCRIPTIVE METHOD=The bwldtn1 or dwellm urnt'shall be „tested acid verified as haviri -an air leakage rate of not,exceeding 7 air changes per, hour at a pressure of 0.2 inch w-9`- ( 0 Pascals) in,Climate .Zones'l ,and 2 O "- PERFORMANCE or&l METHOD -The building or:dwelling unit shall be tested and verified as having an air leakage?rate of rioYexceeding the selected ACf (50) value, as shown on Form"R405 2020 (Performance) or R406 2020:,(ERI)' section labeled as infiltration' sub -section ACH50. ACH(50)'Specified'on Form R405 2020-Energy Ca/c (Ndormance)-or RW06 20 - (ER): 7.000 x 60 _ 18838 = Method for calculating building volume: CFM(50) Building Volume ACH(50) O Retrieved from architectural plans F-1 PASS Code • software calculated When ACH(50) is less than 3, Mechanical Ventilation installation O Field measured and calculated must be verified by building department. R402.4.1.2 Testing. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 Pascals) Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statues.or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to thecode official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, back draft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. Testing Company Company Name: Phone: 1 hereby verify that the above Air Leakage results are in accordance with the 2020 7th Edition Florida Building Code Energy Conservation requirements according to the compliance method selected above. Signature of Tester: Date of Test: Printed Name of Tester: License/Certification #: Issuing Authority: 4/19/2021 9:51:47 AM EnergyGaugeO USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 1 Florida Building Code, Energy Conservation, 7th Edition (2020) Mandatory Requirements for Residential Performance, Prescriptive and ERI Methods F77RESS- 5448 Lugo Street Permit Number: Fort Pierce , FL , 34951 MANDATORY REQUIREMENTS - See individual code sections for full details. SECTION R401 GENERAL R401.3 Energy Performance Level (EPL) display card (Mandatory) The building official shall require that an energy performance level (EPL) display card be completed and certified by the builder to be accurate and correct before final approval of the building for occupancy. Florida law .❑ (Section 553.9085, Florida Statutes) requires the EPL display card to be included as an addendum to each sales contract for both presold and nonpresold residential buildings. The EPL display card contains information indicating the energy performance level and efficiencies of components installed in a dwelling unit. The building official shall verify that the EPL display card completed and signed by the builder accurately reflects the plans and specifications submitted to demonstrate code compliance for the building. A copy of the EPL display card can be found in Appendix RD. SECTION R402 BUILDING THERMAL ENVELOPE ❑ R402.4 Air leakage (Mandatory). The building thermal envelope shall be constructed to limit air leakage in accordance with the requirements of Sections R402.4.1 through R402.4.5. Exception: Dwelling units of R-2 Occupancies and multiple attached single family dwellings shall be permitted to comply with Section C402.5. ❑ R402.4.1 Building thermal envelopeThe building thermal envelope shall comply with Sections R402.4.1.1 and R402.4.1.2. The sealing methods between dissimilar materials shall allow for differential expansion and contraction. ❑ R402.4.1.1 Installation. The components of the building thermal envelope as listed in Table R402.4.1.1 shall be installed in accordance with the manufacturer's instructions and the criteria listed in Table R402.4.1.1, as applicable to the method of construction. Where required by the code official, an approved third party shall inspect all components and verify compliance. ❑ R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate not exceeding seven air changes per hour in Climate Zones 1 and 2, and three air changes per hour in Climate Zones 3 through 8. Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g. (50 pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(0, (g) or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. Exception: Testing is not required for additions, alterations, renovations, or repairs, of the building thermal envelope of existing buildings in which the new construction is less than 85 percent of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures. 3. Interior doors, if installed at the time of the test, shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test, shall be turned off. 6. Supply and return registers, if installed at the time of the test, shall be fully open. ❑ R402.4.2 Fireplaces. New wood -burning fireplaces shall have tight -fitting flue dampers or doors, and outdoor combustion air. Where using tight -fitting doors on factory -built fireplaces listed and labeled in accordance with UL 127, the doors shall be tested and listed for the fireplace. Where using tight -fitting doors on masonry fireplaces, the doors shall be listed and labeled in accordance with UL 907. ❑ R402.4.3 Fenestration air leakage. Windows, skylights and sliding glass doors shall have an air infiltration rate of no more than 0.3 cfm per square foot (1.5 Us/m2), and swinging doors no more than 0.5 cfm per square foot (2.6 Us/m2), when tested according to NFRC 400 or AAMA/ WDMA/CSA 101/I.S.2/A440 by an accredited, independent laboratory and listed and labeled by the manufacturer. Exception: Site -built windows, skylights and doors. 4/19/2021 9:51 AM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 1 of 5 MANDATORY REQUIREMENTS - (Continued) R402.4.4 Rooms containing fuel -burning appliances. In Climate Zones 3 through 8, where open combustion air ducts provide combustion air to open combustion fuel burning appliances, the appliances and combustion air opening shall be located outside the building thermal envelope or enclosed in a room, isolated from inside the thermal envelope. Such rooms shall be sealed and insulated in accordance with the envelope requirements of Table R402.1.2, where the walls, floors and ceilings shall meet not less than the basement wall R-value requirement. The door into the room shall be fully gasketed and any water lines and ducts in the room insulated in accordance with Section R403. The combustion air duct shall be insulated where it passes through conditioned space to a minimum of R-8. Exceptions: 1. Direct vent appliances with both intake and exhaust pipes installed continuous to the outside. 2. Fireplaces and stoves complying with Section R402.4.2 and Section R1006 of the Florida Building Code, Residential. R402.4.5 Recessed lighting. Recessed luminaires installed in the building thermal envelope shall be sealed to limit air leakage between conditioned and unconditioned spaces. All recessed luminaires shall be IC -rated and labeled as having an air leakage rate not more than 2.0 cfm (0.944 L/s) when tested in accordance with ASTM E283 at a 1.57 psf (75 Pa) pressure differential. All recessed luminaires shall be sealed with a gasket or caulk between the housing and the interior wall or ceiling covering. R403.1 Controls. SECTION R403 SYSTEMS R403.1.1 Thermostat provision (Mandatory). At least one thermostat shall be provided for each separate heating and cooling system. R403.1.3 Heat pump supplementary heat (Mandatory). Heat pumps having supplementary electric -resistance heat shall have controls that, except during defrost, prevent supplemental heat operation when the heat pump compressor can meet the heating load. R403.3.2 Sealing (Mandatory) All ducts, air handlers, filter boxes and building cavities that form the primary air containment passageways for air distribution systems shall be considered ducts or plenum chambers, shall be constructed and sealed in accordance with Section C403.2.9.2 of the Commercial Provisions of this code and shall be shown to meet duct tightness criteria below. Duct tightness shall be verified by testing in accordance with ANSI/RESNET/ICC 380 by either individuals as defined in Section 553.993(5) or (7), Florida Statutes, or individuals licensed as set forth in Section 489.105(3)(f), (g) or (1), Florida Statutes, to be "substantially leak free" in accordance with Section R403.3.3. ❑ R403.3.2.1 Sealed air handler. Air handlers shall have a manufacturer's designation for an air leakage of no more than 2 percent of the design airflow rate when tested in accordance with ASHRAE 193. R403.3.3 Duct testing (Mandatory). Ducts shall be pressure tested to determine air leakage by one of the following methods: 1. Rough -in test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the system, including the manufacturer's air handler enclosure if installed at the time of the test. All registers shall be taped or otherwise sealed during the test. 2. Postconstruction test: Total leakage shall be measured with a pressure differential of 0.1 inch w.g. (25 Pa) across the entire system, including the manufacturer's air handler enclosure. Registers shall be taped or otherwise sealed during the test. Exceptions: 1. A duct air leakage test shall not be required where the ducts and air handlers are located entirely within the building thermal envelope. 2. Duct testing is not mandatory for buildings complying by Section 405 of this code. Duct leakage testing is required for Section R405 compliance where credit is taken for leakage, and a duct air leakage Qn to the outside of less than 0.080 (where Qn = duct leakage to the outside in cfm per 100 square feet of conditioned floor area tested at 25 Pascals) is indicated in the compliance report for the proposed design. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. R403.3.5 Building cavities (Mandatory). Building framing cavities shall not be used as ducts or plenums. R403.4 Mechanical system piping insulation (Mandatory). Mechanical system piping capable of carrying fluids above 105°F (41°C) or below 55°F (13°C) shall be insulated to a minimum of R-3. R403.4.1 Protection of piping insulation. Piping insulation exposed to weather shall be protected from damage, including that caused by sunlight, moisture, equipment maintenance and wind, and shall provide shielding from solar radiation that can cause degradation of the material. Adhesive tape shall not be permitted. R403.5.1 Heated water circulation and temperature maintenance systems (Mandatory). If heated water circulation systems are installed, they shall be in accordance with Section R403.5.1.1. Heat trace temperature maintenance systems shall be in accordance with Section R403.5.1.2. Automatic controls, temperature sensors and pumps shall be accessible. Manual controls shall be readily accessible. ❑ R403.5.1.1 Circulation systems. Heated water circulation systems shall be provided with a circulation pump. The system return pipe shall be a dedicated return pipe or a cold water supply pipe. Gravity and thermosiphon circulation systems shall be prohibited. Controls for circulating hot water system pumps shall start the pump based on the identification of a demand for hot water within the occupancy. The controls shall automatically turn off the pump when the water in the circulation loop is at the desired temperature and when there is no demand for hot water. El R403.5.1.2 Heat trace systems. Electric heat trace systems shall comply with IEEE 515.1 or UL 515. Controls for such systems shall automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping in accordance with the times when heated water is used in the occupancy. 4/19/2021 9:51 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 2 of 5 MANDATORY REQUIREMENTS - (Continued) ❑ R403.5.5 Heat traps (Mandatory). Storage water heaters not equipped with integral heat traps and having vertical pipe risers shall have heat traps installed on both the inlets and outlets. External heat traps shall consist of either a commercially available heat trap or a downward and upward bend of at least 3'% inches (89 mm) in the hot water distribution line and cold water line located as close as possible to the storage tank. R403.5.6 Water heater efficiencies (Mandatory). ❑ R403.5.6.1.1 Automatic controls. Service water -heating systems shall be equipped with automatic temperature controls capable of adjustment from the lowest to the highest acceptable temperature settings for the intended use. The minimum temperature setting range shall be from 100°F to 140°F (38°C to 60°C). •❑ R403.5.6.1.2 Shut down. A separate switch or a clearly marked circuit breaker shall be provided to permit the power supplied to electric service systems to be turned off. A separate valve shall be provided to permit the energy supplied to the main bumer(s) of combustion types of service water -heating systems to be turned off. ❑ R403.5.6.2 Water -heating equipment. Water -heating equipment installed in residential units shall meet the minimum efficiencies of Table C404.2 in Chapter 4 of the Florida Building Code, Energy Conservation, Commercial Provisions, for the type of equipment installed. Equipment used to provide heating functions as part of a combination system shall satisfy all stated requirements for the appropriate water -heating category. Solar water heaters shall meet the criteria of Section R403.5.6.2.1. ❑ R403.5.6.2.1 Solar water -heating systems. Solar systems for domestic hot water production are rated by the annual solar energy factor of the system. The solar energy factor of a system shall be determined from the Florida Solar Energy Center Directory of Certified Solar Systems. Solar collectors shall be tested in accordance with ISO Standard 9806, Test Methods for Solar Collectors, and SRCC Standard TM-1, Solar Domestic Hot Water System and Component Test Protocol. Collectors in installed solar water -heating systems should meet the following criteria: 1. Be installed with a tilt angle between 10 degrees and 40 degrees of the horizontal; and 2. Be installed at an orientation within 45 degrees of true south. ❑ R403.6 Mechanical ventilation (Mandatory). The building shall be provided with ventilation that meets the requirements of the Florida Building Code, Residential, or Florida Building Code, Mechanical, as applicable, or with other approved means of ventilation including: Natural, Infiltration or Mechanical means. Outdoor air intakes and exhausts shall have automatic or gravity dampers that close when the ventilation system is not operating. ❑ R403.6.1 Whole -house mechanical ventilation system fan efficacy.When installed to function as a whole -house mechanical ventilation system, fans shall meet the efficacy requirements of Table R403.6.1. Exception: Where an air handler that is integral to tested and listed HVAC equipment is used to provide whole -house mechanical ventilation, the air handler shall be powered by an electronically commutated motor. ❑ R403.6.2 Ventilation air. Residential buildings designed to be operated at a positive indoor pressure or for mechanical ventilation shall meet the following criteria: 1. The design air change per hour minimums for residential buildings in ASHRAE 62.2, Ventilation for Acceptable Indoor Air Quality, shall be the maximum rates allowed for residential applications. 2. No ventilation or air-conditioning system make-up air shall be provided to conditioned space from attics, crawlspaces, attached enclosed garages or outdoor spaces adjacent to swimming pools or spas. 3. If ventilation air is drawn from enclosed space(s), then the walls of the space(s) from which air is drawn shall be insulated to a minimum of R-11 and the ceiling shall be insulated to a minimum of R-19, space permitting, or R-10 otherwise. R403.7 Heating and cooling equipment. R403.7.1 Equipment sizing (Mandatory). Heating and cooling equipment shall be sized in accordance with ACCA Manual S based ❑ on the equipment loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies, based on building loads for the directional orientation of the building. The manufacturer and model number of the outdoor and indoor units (if split system) shall be submitted along with the sensible and total cooling capacities at the design conditions described in Section R302.1. This Code does not allow designer safety factors, provisions for future expansion or other factors that affect equipment sizing. System sizing calculations shall not include loads created by local intermittent mechanical ventilation such as standard kitchen and bathroom exhaust systems. New or replacement heating and cooling equipment shall have an efficiency rating equal to or greater than the minimum required by federal law for the geographic location where the equipment is installed. TABLE R403.6.1 WHOLE -HOUSE MECHANICAL VENTILATION SYSTEM FAN EFFICACY FAN LOCATION AIRFLOW RATE MINIMUM (CFM) MINIMUM EFFICACY a (CFM/WATT) AIRFLOW RATE MAXIMU (CFM) HRV or ERV Any 1.2 cfm/watt Any Range hoods Any 2.8 cfm/watt Any In -line fan Any 2.8 cfm/watt Any Bathroom, utility room 10 1.4 cfm/watt <90 Bathroom, utility room 90 2.8 cfm/watt Any For SI: 1 cfm = 28.3 L/min. a. When tested in accordance with HVI Standard 916 4/19/2021 9:51 AM EnergyGauge® USA 7.0.00 - FlaRes202O FBC 7th Edition (2020) Compliant Software Page 3 of 5 MANDATORY REQUIREMENTS - (Continued) Fi R403.7.1.1 Cooling equipment capacity. Cooling only equipment shall be selected so that its total capacity is not less than the calculated total load but not more than 1.15 times greater than the total load calculated according to the procedure selected in Section R403.7, or the closest available size provided by the manufacturer's product lines. The corresponding latent capacity of the equipment shall not be less than the calculated latent load. The published value for AHRI total capacity is a nominal, rating -test value and shall not be used for equipment sizing. Manufacturer's expanded performance data shall be used to select cooling -only equipment. This selection shall be based on the outdoor design dry-bulb temperature for the load calculation (or entering water temperature for water -source equipment), the blower CFM provided by the expanded performance data, the design value for entering wet -bulb temperature and the design value for entering dry-bulb temperature. Design values for entering wet -bulb and dry-bulb temperatures shall be for the indoor dry bulb and relative humidity used for the load calculation and shall be adjusted for return side gains if the return duct(s) is installed in an unconditioned space. Exceptions: 1. Attached single- and multiple -family residential equipment sizing may be selected so that its cooling capacity is less than the 2. calculated total sensible load but not less than 80 percent of that load. When signed and sealed by a Florida -registered engineer, in attached single- and multiple -family units, the capacity of equipment may be sized in accordance with good design practice. R403.7.1.2 Heating equipment capacity. R403.7.1.2.1 Heat pumps. Heat pump sizing shall be based on the cooling requirements as calculated according to Section R403.7.1.1, and the heat pump total cooling capacity shall not be more than 1.15 times greater than the design cooling load even if the design heating load is 1.15 times greater than the design cooling load. R403.7.1.2.2 Electric resistance furnaces. Electric resistance furnaces shall be sized within 4 kW of the design requirements calculated according to the procedure selected in Section R403.7.1. R403.7.1.2.3 Fossil fuel heating equipment. The capacity of fossil fuel heating equipment with natural draft atmospheric burners shall not be less than the design load calculated in accordance with Section R403.7.1. R403.7.1.3 Extra capacity required for special occasions. Residences requiring excess cooling or heating equipment capacity on an intermittent basis, such as anticipated additional loads caused by major entertainment events, shall have equipment sized or controlled to prevent continuous space cooling or heating within that space by one or more of the following options: 1. A separate cooling or heating system is utilized to provide cooling or heating to the major entertainment areas. 2. A variable capacity system sized for optimum performance during base load periods is utilized. ❑ R403.8 Systems serving multiple dwelling units (Mandatory). Systems serving multiple dwelling units shall comply with Sections C403 and C404 of the Florida Building Code, Energy Conservation —Commercial Provisions in lieu of Section R403. El R403.9 Snow melt and ice system controls (Mandatory) Snow- and ice -melting systems, supplied through energy service to the building, shall include automatic controls capable of shutting off the system when the pavement temperature is above 50°F (10°C), and no precipitation is falling and an automatic or manual control that will allow shutoff when the outdoor temperature is above 40°F (4.8°C). ❑ R403.10 Pools and permanent spa energy consumption (Mandatory). The energy consumption of pools and permanent spas shall be in accordance with Sections R403.10.1 through R403.10.5. R403.10.1 Heaters. The electric power to heaters shall be controlled by a readily accessible on -off switch that is an integral part of the heater mounted on the exterior of the heater, or external to and within 3 feet (914 mm) of the heater. Operation of such switch shall not change the setting of the heater thermostat. Such switches shall be in addition to a circuit breaker for the power to the heater. Gas -fired heaters shall not be equipped with continuously burning ignition pilots. ❑ R403.10.2 Time switches. Time switches or other control methods that can automatically turn off and on according to a preset schedule shall be installed for heaters and pump motors. Heaters and pump motors that have built-in time switches shall be in compliance with this section. Exceptions: 1. Where public health standards require 24-hour pump operation. 2. Pumps that operate solar- and waste -heat -recovery pool heating systems. 3. Where pumps are powered exclusively from on -site renewable generation. 4/19/2021 9:51 AM EnergyGaugeO USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 4 of 5 QR403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor -retardant cover on or at the water surface or a liquid cover or other means proven to reduce heat loss. Exception: Where more than 70 percent of the energy for heating, computed over an operation season, is from site -recovered energy, such as from a heat pump or solar energy source, covers or other vapor -retardant means shall not be required. R403.10.4 Gas- and oil -fired pool and spa heaters. All gas- and oil -fired pool and spa heaters shall have a minimum thermal ❑ efficiency of 82 percent for heaters manufactured on or after April 16, 2013, when tested in accordance with ANSI Z 21.56. Pool heaters fired by natural or LP gas shall not have continuously burning pilot lights. R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance with AHRI 1160, Table 2, Standard Rating Conditions -Low Air Temperature. A test report from an independent laboratory is required to verify procedure compliance. Geothermal swimming pool heat pumps are not required to meet this standard. R403.11 Portable spas (Mandatory). The energy consumption of electric -powered portable spas shall be controlled by the requirements of APSP-14. F1 R403.13 Dehumidifiers (Mandatory If installed, a dehumidifier shall conform to the following requirements: 1. The minimum rated efficiency of the dehumidifier shall be greater than 1.7 liters/ kWh if the total dehumidifier capacity for the house is less than 75 pints/day and greater than 2.38 liters/kWh if the total dehumidifier capacity for the house is greater than or equal to 75 pints/day. 2. The dehumidifier shall be controlled by a sensor that is installed in a location where it is exposed to mixed house air. 3. Any dehumidifier unit located in unconditioned space that treats air from conditioned space shall be insulated to a minimum of R-2. 4. Condensate disposal shall be in accordance with Section M1411.3.1 of the Florida Building Code, Residential. R403.13.1 Ducted dehumidifiers. Ducted dehumidifiers shall, in addition to conforming to the requirements of Section R403.13, conform to the following requirements: 1. If a ducted dehumidifier is configured with return and supply ducts both connected into the supply side of the cooling system, a backdraft damper shall be installed in the supply air duct between the dehumidifier inlet and outlet duct. 2. If a ducted dehumidifier is configured with only its supply duct connected into the supply side of the central heating and cooling system, a backdraft damper shall be installed in the dehumidifier supply duct between the dehumidifier and central supply duct. 3. A ducted dehumidifier shall not be ducted to or from a central ducted cooling system on the return duct side upstream from the central cooling evaporator coil. 4. Ductwork associated with a dehumidifier located in unconditioned space shall be insulated to a minimum of R-6. SECTION R404 ELECTRICAL POWER AND LIGHTING SYSTEMS R404.1 Lighting equipment (Mandatory). Not less than 90 percent of the lamps in permanently installed luminaires shall have an efficacy of at least 45 lumens -per -watt or shall utilize lamps with an efficacy of not less than 65 lumens -per -watt. R404.1.1 Lighting equipment (Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights. 4/19/2021 9:51 AM EnergyGauge® USA 7.0.00 - FlaRes2020 FBC 7th Edition (2020) Compliant Software Page 5 of 5