Loading...
HomeMy WebLinkAboutAPPROVED 07) wall section I - EsignedGaly. standing seam metal roofing on Pee I-n-stick membrane on 3/4" cdx plywd sheathing on pre-engin, wd. trusses Q 24" o.c. 2x Sub fascia. Attach to end of each truss w/ (2) 16d nails. Attach roof sheathing w/ Sd ring shan> nails w 4" o.c. 36'8" B.N. EAVE... Copper drip edge on 1 x 3, 2 x 8 Rough sawn cedar fascia. Soffit... 5/5" stucco - on p.b, high -rib mtl. lath. 24" O.N. 234" FIN, GONG, FL, 22'S" TOP OF BEAM ll'O" FIN. FL. (20'0" NAVD) 104" TOP BM, 910" BOT. BM. (18'0" NAVD) FOUNDATION... See struct, plans. O O" FIN. FL. (9.0' N.A.V.D.) Gonc grade beam B auger pies below - See struct, plans 12 Icynene spray foam insul. (R-20) or equal. Imbedded Simpson anchor see roof d fl. framing plans 5/8" Drywall on ceiling i� 8"xl(O," composite tie beam w/ 1 *5 bar cont in ea. coarse filled solid - See roof plan II for beams 3000 psi conc. II I II II II 5/8" stucco on 8" blk. wall w/ *5 bars H vert, in filled cells per struct, plans Ilu Interior side to 1/2" gyp, bd. on 3/4" p.t. furring a 16" o.c. on 3/4" III ridgid insul. bd. OR-5) ICI I I�I III I III III 2" conc, topping on 8" TF precast conc, panel - See ICI structural plans `11 ----------------------------------- ZZA �3/4" r i dg i in ul, bd. (R-5) to bot of o c, deck aw 5/8" drywall ceiling on 2x II PA, wood furring a 24" o.c. II II 2x4 p.t. cont, attached to wall II w/ 1/4" dia, x 2 3/4" long u tapcons 0 16" o.c. (Typical) II II II 8"x16" poured conc, tie beam w/ II 4 *5 bar Cont. - See floor framing plan for beams 3000 psi conc. 5/8" stucco on 8" blk. wall w/ *5 bars vert, in filled cells per struct, plans Interior side to 1/2" gyp, bd. on 3/4" p.t. furring e 16" o.c. on 3/4" ridgid insul. bd. (R-5) 2" conc, topping on 8" recast conc, panel - See structural plans ----------------------------------- -- -- -- - ------------------------ 5/8" drywa I I e l i ng on 2x p.t, wood fur inig Q 24" o.c. • I�I �■ M N ■■■■■■■■l ■■■■■■, ■■■■■■■l . ■■■■■■■� MENOMEN, ■■■■■■■, ■■■■■■■, ■MONO■■, ■■■■■■■l ■■■■■■■■1■■■■■■i -- - iiiiiiii ■■■■■■■l ■■■■■■■1 ■■■■■■■l ■■■■■■■, ■■■■■■■l ■■■■■■■1 ommommol ■■■■■■■i ■■■■■■■, ■■■■■■■, ■■■■■■■, ■■■■■■■l ■■■o■t< -- iiiiiiii ........ ........ s s • • 8"xl6" poured conc, tie beam w/ 4 *5 bar cont. - See floor framing plan for beams 3000 psi conc. 5/8" stucco on S" frangible blk. walls See struct, plans Interior side to 1/2" gyp, bd. on 3/4" p.t. furring a 16" o.c. on 3/4" ridgid insul, bd. (R-5) Ili ;""RY SECTION Gehl. standing seam metal roofing on Peel-n-stick membrane on 3/4" cdx plywd sheathing on pre-engin, wd. trusses a 24" o.c.- 2x Sub fascia. Attach to end of each truss w/ (2) 111 nails. Attach roof sheathing w/ 8d ring shank nails o 4" o.c. 368" B.N. Soffit... 5/8" Stucco - on p.b. high -rib mtl, lath. Stucco outriggers a 36" o.c. - See — elevations I1'O" FIN. FL. (2O'O" N.A.V.D.) ih 10'8" FIN. FL. &'8" BOT. BM. (1-1'8" NAVD) OHO" FIN. FL. (9.0' NAVE)) 24" O.1-I 12 6 Imbedded Simpson anchor see roof 8 fl. framing plans 5/8" stucco on high -rib, p.b. mtl, lath _ 16x16 conc, tie beam - See structural plans ' 5/8" Stucco on 12" x 12" conc. ' blk. col, w/ 4 *5 bars vert. in filled cells, alumin, railing w/ pickets e 5" o.c. - See elev. 5/8" Stucco on 16" x Ifo" conc. ' blk. col, w/ 4 *5 bars vert. in ' filled cells. ' Tile on 2" conc, topping on 6" ' precast conc, panel - See structural plans u - . - - ■■■■■■■■i ■■■■■■■■i 5/8" stucco ceiling on high -rib p.b. metal lath on 2x framing 6 24" o.c. 5/8" Stucco on 16"x16" conc. blk, col, w/ 4 *5 bars vert. in filled cells. See struct, plans Floor the on 2" conc, topping on 6" precast conc, panel - See structural plans 5/8" stucco ceiling on hi�h-rib �! metal lath on 2x framing a 24" o.c. 8" conc, porch beam - See structural plans FOUNDATION... See struct, plans. SLOPE DN. SLOPE DN. SLOPE DN. t I 3/4" ridgid insul. bd. (R-5) III to bot of conc, deck II nn II 234" FIN, FL, 11 (32 4 NAVD) 6" batt i su . (R-19) Interior side to 1/2" gyp, bd. on 3/4" p.t. furring a 16" o.c, on 3/4" ridgid insul. bd. (11 2" conc, topping on 8" precast conc, panel - See structural plans Corr. floor 4sam - See struct, p uvuuuvuuu� )uuuuuvuv ' 5/8" drywall ceiling on 2x framing s 24" o.c. 8"xl6" poured tie beam w/ 4 *5 bars cont. - See floor framing plan for beams 3000 psi conc. 5/8" stucco on S" blk. wall w/ *5 bars vert, in filled cells per struct, plans Interior side to 1/2" gyp, bd. on 3/4" PA. furring a 16" o.c, on 3/4" ridgid ineul. bd. (R-5) 2" conc, topping on 8" brecast conc, eanel - See conc, tie beam - See structural plans 5/8" stucco on 8" frangible blk. walls See struct, plans NOTE: 1/2" GYP, BD, 0 IIN.) DRAFTSTOPPINa PER R302.12 SHALL ESE INSTALLED SO THERE IS NO MORE THAN 1000 S.F OF CONCEALED SPACE BETWEEN DRAFTSTOPS. II Digitally signed ark by Mark Corson Date: x s o n 2021.06.24 11:31:58-04'00' L Ix LU bar cont of plan >ars is o z In z z > � -6 O Q 4 9 Q N Oz O O= zrn���9�z� _ T o ij o 0 O c6 S Q) C N Q s O U Q)Q 04-I 4N m SINS N U Y- Q • U V1 ram,, M a W O C--I UN O 12 N 0 N.. y 4 M O O ��•I i••l U ~ U N O U U • DATE O�o/25/21 DRAWN BY pje me CHECKED MC REVISIONS