Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutTrussI
CA U 10N'Hll
54
6-00
t
-- -_
DO NOT ATTEMPT TO ERECT
1s
o0_ 00
4 os_ oo 14 vo 0o"SON
TRUSSES WITHOUT REFERRING TO
THE ENGINEERING DRAWINGS AND ,
� M lD r 0
U U Q
N co d 0
O O' O O,
Q° Q <C ' Q
F- F F- F-
o a D- a D_
CO 0 CD 0 CD
O O O O O
Q Q Q
F-
a
6>
O
Q
CONNEA"TOR SCHEDULE
1- F- F F-
a o rn N n� IL
O d LO cD r�
� r O r r r c- r � � p' U') M r — — T - - -
Q Q —Q Q Q_- Q d Q Q Q U U U �
Q
,
: I ROOF TRUSS FLOOR TRV
BSCI-131 SUMMARY SHEETS.
ALL PERMANENT BRACING MUST BE
IN PLACE PRIOR TO LOADING
TRUSSES. (ie. SHEATHING,_
SHINGLES, ETC.)
_QQ
1 C1
C 1
I
TY ID MODEL ROOF UPLIFT Q O SYMBOL
I
I
a
' I
I
ALL INTERIOR BEARING WALLS'
QT ID MODEL FLOOR UPLIFT SYMBOL MUST BE IN PLACE PRIOR TO
I
IN 1 1
INSTALLING TRUSSES.
C3
-
-
I
I
I
I
I
-
C3
I
r
I�
o
I
i
C5
!
I
E
O
T
-
IN
I
o
L
E7
i o ov
I
,
I
I I
I
I
0 00
E7
E7
_. -- - 1
I
:
t:
I
I:
I
-
= -
i
!
I
r
I
_I
I'
�I
E7
E7
:
I
I
u
is
I:
I:
I
v
a
E7
_ .:-...
_ ...-
=0
Ln 0
o
I
0-0
w
o
E7
00
7-00-00
1
-00
0-00-0
7 00
E7
I
0
r
E7
I
I
I:
E7--------
I
I
0
0
o
I
NIN
,o
CO
o_,
o
E7
0_
0=
I
f
LL
'
CL ,,
D
E7
E7.:.
I
�
�I
I
i
- _ _ .::.:.-...E7
E7
i
I
1-
I
F
I
I
I
E7
E7
i
.;
I
E7
I
!
E7
_,_.._:
i
I
I
v
I
E7
:
I
IL
E7
o
E7...:..
_ .... ..::.._ "
a
i
E7
M
E7
w.
I.
0
0
<---------
wiA,o
E7
Mo
s... .
rNow
..
1
05
i.
.. _.
...i
E7
:
I
E7
L
I
�
h
04
,.,
VO
(
�
--
E7
E7
�
0
f
03
VO
i
E7
b
18
S7EF
UP
a
E7
_ ...:- _....
02
VO
n
c
_:.._ _.._
.._,. _..
E7
o
I
i
0
_ , _....
--
0
A
LUS24
$20
435
JLA
0
A
HTU26
2940
_
T
1555
I A
JL
0
C
HTU26 2
Z940
2175
J LC
18
A
HTU26
=3580
1555
J LA'
0
E
HGUS26-2
4340
21 5
S
J LE
0
B
HTU28
4655
2020
J LB
0
G
HGUS26-3
4340
2155
J LG
d
C
HT 26-2
U
3580
2175
J LC
0
J
H 21 -4
GUS 0
9100
4D95
J L J
2-
b
_
HTU28 2
4655
3485
] LD
0
L
HHUS46
2830
1320'
L
J -
L
0:
E
HGUS26-7
5170
2155
J LE
d
M
THA422
1960
J LM
0
F
HGUS28-2
7460
3235
j LF
0
N
THAC422
1960
J LN
0
G
HGUS26-3
5170
2155
A LG
0
O
THA426
2435•
J LO '
0
H
HGU828-3
7460
3235
$ LH
P
SPECIAL
0
J
HGUS20-4
9100
4095
J, LJ
ACCESSORIES
- - " --
3z8 NAIL ON PLATES
SEAT PLATES
K
fTHJZ'6
2940
915
ACCESSORIES
48
3x8 NAIL ON PLATES
SCREWS
BOLTS
SEAT PLATES
QTY
MODEL
QTY
—
MODEL ,
SCREWS
BOLTS
SDS 1/4" x 3"
1/2'1x8"CARR. BOLTS
TY
MODEL
Q
MODEL
�
"
SDS 1/4 x 4-1/2
,
r
1,/2+WASHERS '
SDS 1/4" x 3"
1/2'SB" CARR. BOLTS
SDS 1/4" x 6" ;
i
1!2 NUTS
SDS 1/4 x 4-1/2
1/2" WASHERS`
A
HTU26
1 PLY TYP. °
°
°• HTU26 2 ° HHUS46 '
2 PLY TVP ° ° FLOOR TYP.
_
11<
SDS 1/4 x 6
-
1/2 NUTS
MISCELLANEOUS
ROOF TRUSS
^�
FLOOR TRUSS
S
f
MODE .. .. :.
..
ODEL �-
yin
I
1
REFER TO FINAL ENGINEERING
SHEETS FOR THE FOLLOWING.
1 NUMBER OF GIRDER PLIES AND
NAILING SCHEDULE.
2) BEARING BLOCK REQUIREMENTS.
3) SCAB DETAILS (IF REQUIRED)
4 UPLIFT AND GRAVITY R I E
WARNING
Backcharges Will Not Be Accepted I
Regardless of I -au lt Without Prior
Notification By Customer Within 48
Hours And Investigation By
Builders FirstSource.
NO EXCEPTIONS.
The General Contractor Is Responsible
For All Connections Other Than Truss
to Truss, Gable Shear Wall, And
Connections. Temporary and
Permanent Bracing, And Ceiling And
Roof Diaphr m Connections.
ROOF PITCH: 6/12
CEILING PITCH:
TOP CHORD SIZE: 2 X 4
BOTTOM CHORD SIZE: 2 X 4
OVERHANG LENGTH: 18"
I
END CUT: SQUARE
CANTILEVER: NIA
TRUSS SPACIN : 24"
BUILDING COD :' FBC2Q2d
BEARING HEIGHT
SCHEDULE
Lumber design values are in accordance with ANSI/TPI 1 section 6.3
These truss designs rely on lumber values established by others.
MiieK
RE: 2792357 - MiTek USA, Inc.
Site Information: 6904 Parke East Blvd.
Customer Info: Manny Garcia Project Name: Garcia Res Model: Custom Tampa, FL 33610-4115
Lot/Block: . Subdivision: .
Address: NE Corner Linwood & Summit St, .
City: Fort Pierce State: FL
Name Address and License # of Structural Engineer of Record, If there is one, for the building.
Name: License #:
Address:
City: State:
General Truss Engineering Criteria &_Design Loads (Individual Truss Design Drawings Show Special
Loading Conditions):
Design Code: FBC2020/TP12014 Design Program: MiTek 20/20 8.4
Wind Code: ASCE 7-16 Wind Speed: 163 mph
Roof Load: 40.0 psf Floor Load: N/A psf
This package includes 51 individual, Truss Design Drawings and 0 Addit;onal Drawings.
With my seal affixed to this sheet, I hereby certify that I am the Truss Design Engineer and this index sheet
conforms to 61G15-31.003, section 5 of the Florida Board of Professional Engineers- Rules.
No.
Seal#
Truss Name
Date
No.
Seal#
Truss Name--
Date
1
T24871877
A01
8/2/21
15
T24871891
A15
8/2/2t
Z
T24871878
A02
8/2/21
16
T24871892
A16
8/2/21
3
T24871879
A03
8/2/21
17
T24871893
A17
8/2/21
4
T24871880
A04
8/2/21
18
T24871894
C1
8/2/21
5
T24871881
A05
8/2/21
19
T24871895
C1P
8/2/21
6
T24871882
A06P
8/2121
20
T24871896
C3
8/2/21
7
T24871883
A07PT
8/2/21
21
T24871897
C5
8/2/21
8
T24871884
A08PT
8/2/21
22
T24871898
D01
8/2/21
9
T24871885
A09PT
8/2/21
23
T248718.99
D02
8/2/21
10
T24871886
Al OPT
8/2/21
24
T24871900
D03
8/2/21
11
T24871887
A11 PT
8/2/21
25
T24871901
D04
8/2/21
12
T24871888
Al2P
8/2/21
26
T24871902
D05
8/2/21
13
T24871889
A13P
8/2/21
27
T24871903
E3P
8/2/21
14
T24871890
A14P
8/2/21
28
T24871904
E7
8/2/21
This item has been electronically signed and sealed by -Velez, Joaquin, PE using a=Digital Signature.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies
The truss drawing(s) referenced above have been prepared by
MiTek USA, Inc. under my direct supervision based on the parameters
provided by Builders FirstSource - Plant City.
Truss Design Engineer's Name: Velez, Joaquin
My license renewal date for the state of Florida is February 28, 2023.
IMPORTANT NOTE: The seal on these truss component designs is a certification
that the engineer named is licensed in the jurisdiction(s) identified and that the
designs comply with ANSI/TPI 1. These designs are based upon parameters
shown (e.g., loads, supports, dimensions, shapes and design codes), which were
given to MiTek or TRENCO. Any project specific information included is for MiTek's or
TRENCO's customers file reference purpose only, and was not taken into account in the
preparation of these designs. MiTek or TRENCO has not independently verified the
applicability of the design parameters or the designs for any particular building. Before use,
the building designer should verify applicability of design parameters and properly
incorporate these designs into the overall building design per ANSI/TPI 1, Chapter 2.
*�`1Il{Itf Iill..
�. CiuIN V ••
GEN
:• No 6818Z
�p STATE OF •[l/:
���`�, .
ftlllllllt,
Joaquin Velez'PE No.68182.
VIM U.Sk Inc. FIL Gert6634;
6904 Parke East Blvd. Tampa EL 33610
Data.
August 2,2021
Velez,FILE COPY 2
RE: 2792357 -
Site Information:
Customer Info: Manny Garcia Project Name: Garcia Res Model: Custom
Lot/Block: . Subdivision: .
Address: NE Corner Linwood & Summit St, .
City: Fort Pierce State: FL
No. Seal# Truss Name Date
29
T24871905
G01
8/2/21
30
T24871906
G02
8/2/21
31
T24871907
G03
8/2/21
32
T24871908
G04
8/2/21
33
T24871909
G05
8/2/21
34
T248719-10
G06
8/2/21
35
T24871911
H5P
8/2/21
36
T24871912
H7
8/2/21
37
T24871913
P01
8/2/21
38
-T24871914
P02
8/2/21
39
T24871915
PB01
8/2721
40
T24871916
PB02
8/2/21
41
T24871917
PB03
8/2/21
42
T24871918
PB04
8/2/21
43
T24871919
V01
8/2/21
44
T24871920
V02
8/2/21
45
T24871921
V03
8/2/21
46
T24871922
VO4
8/2/21
47
T24871923
V05
8/2/21
48
T24871924
V06
8/2/21
49
T24871925
V07
8/2/21
50
T24871926
V08
8/2/21
51
T24871927
V09
8/2/21
2 of 2
MiTek USA, Inc.
6904 Parke East Blvd.
Tampa, FL 33610-4115
Job
Truss
Truss Type
Qty
Ply
2792357
A01
Half Hip Girder
2
2
T24871877
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MTek Industries, Inc. Fri Jul 30 12:46:57 Page: 1
ID:2rASSaSnLk9Bg98HiPNC3gz5M34-RfC9PsB70Hg3NSgPgnL8w3uITXbGKWrCDoi7J4zJC7f
612
Y o
9 m
T CQ 1 2
2245
5x8=
4x6-
Scale =1:82A
-1-6-0 7-0-0 10-0-7 15-6-5 21-0-2 26-6-0 31-11-14 37-5-11 42-11-9 46-0-0
1-6-0 7-0-0 3-0-7 5-5-14 5-5-14 5-5-14 5-5-14 5-5-14 5 5-14 3-0-7
5x6= 3x6- 3x6- 5x6= 3x6= 5x6= 3x6- 4x6= 3x4a_
3 25 4 26 27 28 529 30 31 6 32 3334 357 36 37 8 3839 40 941 42 4310 44 11
46 2120 47 48
7x8=
19 49 50 161 52 17 1653
4x6= 4x6= Bx10 WB =
5515 1-4 56
4x6=
m
3
1� 2
13 57 58 7x8=
4x6=
4x6= 4x6= 6x8-
7-1-12 12-9-6 18-3-3 23-9-1 29-2-15 34-8-13 40-2-10 46-0-0
7-1-12 5-7-10 5=5-14 5-5-14 5-5-14 5-5-14 5-5-14 5-9-6
Plate Offsets-(X, Y):
[2:0-4-0,0-1-15],
[3:0-3-0,0-2-0], [6:0-3-0,0-3-4], [8:0-3-0,0-3-0], [12:Edge,0-5-8]
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc)
Vdefl
Ud
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC 0.91
Vert(LL)
0.-86
18-19
>639
240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC 0.34
Vert(CT)
-1.01
18-19
>547
180
BCLL
0.0•
Rep Stress Incr
NO
WB 0:94
Horz(CT)
-0713
12
n/a
n/a
BCDL
10.0
Code
FBC2020/TPI2014
Matrix-MSH
Weight: 614 lb FT = 20%
LUMBER
TOP CHORD
2x4 SP No.1 *Except* 1-3:2x4 SP No.2
BOT CHORD
2x8 SP 240OF 2.0E
WEBS
2x4 SP No.3
OTHERS
2x4 SP No.3
BRACING
TOP CHORD-
Structural wood sheathing directly applied,
except end verticals.
BOT CHORD
Rigid ceiling directly applied or 5-11-8 oc
bracing.
REACTIONS
(lb/size) 2=3910/0-8-0, 12=39331
Mechanical
Max Horiz 2 303 (LC 8)
Max Uplift 2=-2412 (LC 8), 12=2348 (LC 8)
Max Grav 2=4080 (LC 13), 12=4028 (LC 13)
FORCES
-(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/42, 2-3=8535/4855, 3-4=-7725/4484,
4-5=11317/6531, 5-7=1382417993,
7-9=12736/7360, 9-10=5892/3358,
10-11=24/11, 11-12=66/56
BOT CHORD
2-22=- 416/7588, 20-22=5770/9798,
19-20=-7422/12626,18-19=8140/13866,
16-18=7963/13561, 15-16=6874/11690,
13-15=-4883/8279, 12-13=1973/3272
WEBS
3-22=1589/3202, 4-22=3266/1986,
4-20=1210/2456, 5-20=2100/1419,
5-19=502/1182, 6-19=836/679,
6-18=66/276, 7-18=-94/454,
7-16=-13141958, 8-16=775/1664,
8-15=2544/1670, 9-15=1499/2886,
9-13=-3801/2429, 10.13=-2204/4171,
10-12=5015/3029
NOTES
1) 2-ply truss to be connected together with 10d
(0.131"x3") nails as follows:
Top chords connected as follows:-2x4 - 1 row at 1-0-0
oc.
Bottom chords connected as follows: 2x8 - 2 rows
staggered at 1-0-0 oc.
Web connected as follows: 2x4 -1 row at 1-0-0 oc.
2) All loads are considered equally applied to all plies,
except if noted as front (F) or -back (B) face in the LOAD-
CASE(S) section. Ply to ply connections have been
provided to distribute only loads noted as (F) or (B),
unless otherwise indicated.
3) Unbalanced roof live loads have been considered for
this design.
4) Wind: ASCE 7-16; Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=46ft; eave=6ft; Cat. II; Exp C; Enclosed;
MWFRS (directional); -Lumber DOL=1.60 plate grip
DOL=1.60
5) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading,
requirements speck to the use -of this truss component.
6) Provide adequate drainage to prevent water ponding.
7) All plates are 4x6 MT20 unless otherwise indicated.
8) This truss has been designed for a 10.0 psf bottom
Chord live load nonconcurrent with any other live loads.
9) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
10) Refer to girder(s) for truss to truss connections.
11) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 2348 lb uplift at
joint 12 and 2412 lb uplift at joint 2.
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE No.ealik
MiTekUSA, InC.fL Cert 6834 .
`6904 Parke:Eest Blvd. Tampa FL 33618
Data.,
August 2,2021
Conti ue on page
WARNING - Verity design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/192020 BEFORE USE.
Design valid for use only with MTek® connectors. This design is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verity the applicability of design parameters and properly incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
Mew
always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSLITP11 Quality Criteria, DS049 and BCSI Building Component
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldod, MD 20601
6904 Parke East Blvd.
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
2T24871877
2
2792357
A01
Half Hip Girder
Job Reference(optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33564, Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 3012:48:57 Page: 2
1 D:2rASSaSnLk9Bg98Hi PNC3gz5M 34-RfC?PsB70Hg3NSgPgnL8w3ulTXbGKWrCDoi7J4zJC7f
12) Hanger(s) or other connection device(s) shall be
provided sufficient to support concentrated load(s) 317
Ib down and 349 Ib up at 7-0-0, 184 Ib down and 168 Ib
up at 8-0-12, 184 Ib down and 168 Ib up at 10-0-12,
184 Ib down and 168 Ib up at 12-0-12, 184 Ib down and
168 Ib up at 14-D-12, 184 Ib down and 168 Ib up at
16-0-12, 184 Ib down and 168 Ib up at 18-0-12, 184 Ib
down and 168 Ib up at 20-0-12, 184 Ib down and 168 Ib
up at 22-0-12, 184 Ib down and 168 Ib up at 24-0-12,
184 Ib down and 168 Ib up at 26-0-12, 184 Ib down and
168 Ib up at 28-D-12, 184 Ib down and 168 Ib up at
30-0-12, 184 Ib down and 168 Ib up at 32-D-12, 1 B4 Ib
down and 168 Ib up at 34-D-12, 184 Ib down and 168 Ib
up at 36-D-12, 184 Ib down and 168 Ib up at 3B-D-12,
184 Ib down and 168 Ib up at 40-0-12, and 184 Ib down
and 168 Ib up at 42-0-12, and 184 Ib down and 168 Ib
up at 44-D-12 on top chord, and 342 Ib down and 59 Ib
up at 7-0-0, 83 Ib down at B-0-12, 83 Ib down at
10-0-12, 83 Ib down at 12-0-12, 83 Ib down at 14-0-12,
83 Ib down at 16-D-12, 83 Ib down at 18-0-12, 83 Ib
down at 20-0-12, 83 Ib down at 22-D-12; 83 Ib down at
24-D-12, 83 Ib down at 26-0-12, 83 Ib down at 28-0-12,
83 Ib down at 30-0•-12, 83 Ib down at 32-0-12, 83 Ib
down at 34-0-12,-83 Ib down at 36-D-12, 83 Ib down at
38-D-12, 83 Ib down at 40-0-12, and 83 Ib down at
42-0.12, and 83 Ib down at 44-D-12 on bottom chord.
The design/selection of such connection device(s) is the
responsibility of others.
13) Overhang applied -to ply: 1(Front)
LOAD CASE(S) Standard
1) Dead + Roof Live -,(balanced): Lumber Increase=1.25,
Plate Increase=125
Uniform Loads (lb/ft)
Vert: 1-3=60,-3.11=60, 2-12=20
Concentrated Loads (lb)
Vert: 3=252 (B), 21=60-(B), 22=277 (B), 8=127
(B), 14=60 (B), 17=60 (B), 4=127 (B), 19=60-(B),
13=60 (B), 25=127 (B), 27=127 (B), 28=127 (B),
29=127 (B), 30=127 (B), 31=127 (B), 32=-127 (B),
34=127 (B), 35=127 (B), 36=127 (B), 37=127 (B),
39=127 (B), 40=127 (B), 41=127 (B),42=127 (B),
43=127 (B), 44=127 (B), 45=60 (B), 46=60 (B),
47=-60 (B), 48=60 (B), 49=60 (B), 50=60 (B),
51=60 (B), 52=60 (B), 53=60 (B), 54= 60 (B),
55=60 (B), 56=60 (B), 57=60 (B), 58=-60 (B)
®WARNING - Vedty design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 6/192020 BEFORE USE.
Design valid for use only with MTekdD connectors. This design Is based only upon parameters shown, and Is for an individual building component, not
a truss system. Before use, the building designer must verity the applicability of design parameters and property Incorporate this design into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
iwiTek'
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing oftrusses and truss systems, see ANSIRP11 Quality Criteria, DSB-89 and SCSI Building Component
6904 Parke East Blvd.
Saf W informadon available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 3S61D
Job
Truss
Truss Type
Oty
Ply
T24871878
2792357
A02
Half Hip
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33564, Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 3012:47:03 Page: 1
ID:ymnl RHNt7GJNrUPKIchyM5M3J-RfC?PsB70Hg3NSgPgnL8w3uITXbGKWrCDoi7J4zJC?f
-1-6-0 6-0-2 9-0-0 12-11-3 20-2-10 27-6-0 34-9-6 42-0-13 46-0-0
1-6-0 6-0-2 2-11-14 ' 3-11-3 7-3-6 7-3-6 7-3 6 7-3-6 3-11-3
5x6= 3x6= 5x6= 3X6= 5x6= 4x6= 3x4n
4 23 5 24 625 26 7 27 8 289 10
I
N
C?
TX
O
bXe=
4x6= 4x8= 5X6= 4x4= 6x8- 4x6=
4x4=
4x4=
9-1-12 16-6-14 -23-10-5 31-1-11 38-5-2 46-0-0
9-1-12 7-5-2 7-3-6 7-3-6 7-3-6 7-6-14
Scale = 1:82.6
Plate Offsets (X, Y): [4:0-3-0,0-2-0], [6:0-3-0,0-3-4], [8:0-3-0,0-3-4], [11:Edge,0-4-8]
Loading
(psf)
Spacing
2-D-0
CSI
DEFL
in
(loc)
Vdefl
L/d
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.71
Vert(LL)
0.62
15-16
>885
240
MT20 244/190
TCDL
10.0-
Lumber DOL
1.25
BC
0.76
Vert(CT)
-0.77
15=16
>717
180
BCLL
0.0'
Rep Stress Incr
YES
WB
0.99
HOR(CT)
0.17
11
n/a
n/a
BCDL
10.0
Code
FBC2020/TPI2014
Matrix -AS
Weight: 280 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x6 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied,
except end verticals.
BOT CHORD Rigid ceiling directly applied.
WEBS 1 Row at midpt 9-11
REACTIONS (lb/size) 2= 193010-8-0. 11 =1 833/
Mechanical
Max Horiz 2=367_(LC 12)
Max Uplift 2=1138 (LC 12). 11=1021 (LC 12)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=3623/2145, 3-4=3394/2017,
4-5=3026/1860, 5-7=4663/2697,
7-9=-4068/2315, 9-10=16/4, 10-11=70/85
BOT CHORD 2-18=2130/3201, 16-18=2378/3823,
15- 1 6=2797/4663, 13-15=2668/4540,
12-13=2033/3483, 11-12=882/1447
WEBS 3-18=347/395, 4-18=755/1360,
5-18=-1285/802, 5-16=301/795,
6-16=627/418, 6-115=14/206, 7-15=90/264,
7-13=747/559, 8-13=-449/927,
8-12=1511/994, 9-'12=863/1713,
9-11=2218/1359
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vuft=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=46ft; eave=6ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Extedor(2E)-1-6-13 to
3-0-7, Interior (1) 3-0-7 to 9-0-0, Exterior(21R) 9-D-0 to
15-6-1, Interior (1) 15-6-1 to 45-10-4 zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
Chord and any other members.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 1021 lb uplift at
joint 11 and 1138 lb uplift -at joint 2.
9) This truss design requires that a minimum of 7/16'
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
,Joaquin Velaz PE No.68192
MIT& USA, Inc.FL Cert 6634
6964 Parke East $l1id. Tampa FL,33610
Date:
August 2,2021
A WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 5119/2020 BEFORE USE.
Design valid for use only with MITek® connectors. This design is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TP11 Quality Criteria, DSB-89 and BCSI Building Component
6904 Parke East Blvd.
SafaVinfonnation available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
12792357
T24871879
A03
Half Hi p
1
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33564. Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 Mi rek Industries, Inc. Fri Jul 3012:47:04 Page: 1
I D:S9JAWnl?eROA??3buS7wVlz5M31-RfC?PsB7OH g3NSgPgnL8w3ulTXbG KWrCDoi7J4zJ C?f
1-6-0 6-11-2 11-0-0 17-11-5 25-2-4 31-61 38-9-3 46-0-0
1-6-0
6-11-2 4-0-14 6-11-5 7-2-15 6-4-0 7-2-15 7-2-13
5x6= 3x6= 5x6= 3x6= 5x6= 3x4n
4 225 23 24 6 7 25 8 26 9
4x6= 2x4o 4x8= 6x8= 4x4= 4x4= 5x6= 4x4-
6-11-2 11-1-12 20-1-0 1-4-4 36-7-8 46-0-0
6-11-2 4-2-10 8-11-4 3-3-4 8-3-4 9-4-8
Scale=1:82.7
0
10
Plate Offsets (X, Y):
[4:0-3-0,0-2-0], [6:0-3-0,0-3-0], [8:0-3-0,0-3.4], I10:Edge,0-4-8]
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc)
Vdefl
Ud
PLATES GRIP
TCLL (roof)
20.0
-Plate Grip DOL
1.25
TC
0.69
Vert(LL)
0.47
13-14
>999
240
MT20 244/190
TCDL
10.0 -
=Lumber DOL
1.25
BC
0.84
Vert(CT)
-0.66
13-14
>B39
180:
BCLL
0.0'
Rep Stress Incr
YES
WB
0.95
Horz(CT)
0.17
10
n/a
n/a
I
BCDL
10.0
Code
FBC2020rTP12014
Matrix -AS
Weight: 289 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x6 SP No.2
WEBS W SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied,
except end verticals.
BOT CHORD
Rigid ceiling directly applied.
WEBS
1 Row at midpt 5 16, 7-11
WEBS
2 Rows at l/3 pts B=10
REACTIONS
(lb/size) 2=1930/0--8-0, 10=1833/
Mechanical -
Max Horiz 2=432 (LC 12)
Max Uplift 2=-1131 (LC 12), 10=1028 (LC 12)
Max Grav 2=2268 (LC 17), 10=2090 (LC 17)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/42, 23=-4260/2105, 3-4=-3754/1932,
4-5=3359/1800, 5-7=-4404/2261,
7-9=2874/1409, 9-10=-186/210
BOT CHORD
2-17=2144/3816, 16-17=2144/3816,
14-16=2290/4269, 13 14=2294/4393,
11-13=1966/3806, 'f8w11=1227/2335
WEBS
3-17=6/243, 3-16=636/463,
4-16=-566/1386, 5-16=12551634,
5-14=55/435, 6-14=1321222,
6-13=-409/379, 7-13= 276/763,
7-11 =1 366/831. B-11=517/1478,
8-10=-2905/1522
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; VuR=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=251t;
B=45ft; L=46ft; eave=6ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Extedor(2E)-1-6-13 to
3-0-7, Interior (1) 3-0-7 to 11-0-0, Extedor(2R) 11-0-0 to
17-6-1, Interior (1) 17-6-1 to 45-10-4 zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DCL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psi bottom
chord live load nonconcurrent with any other live loads.
6) • This truss has been designed for a live load of 20.0psf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
chord and any other members, with BCDL = 10.Opsf.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 1028 lb uplift at
joint 10 and 1131 lb uplift at joint 2.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin yelez PE No.88182
MITek USA, Ina.:FL Can 8634
6804 Parke EastPlvd. Tampa FL,33910
Date:
August 2,2021
A WARNING -Verily design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/19r2020 BEFORE USE.
'
Design valid for use only with MITek® connectors. This design is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design Into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSVMlf Quality Criteria, DS049 and BCS/ Building Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
2792357
A04
Hip
T24871880
Job Reference (optional)
Builders FirstSource irampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 15 2021 Print: 8.430 S Jul 18 2021 MTek Industries, Inc. Fri Jul 3012:47:05 Page: 1
I D:S9JA Wnl?eROA??3buS7wVjz5M 31-RfC?PsB70H g3NSgPgnL8w3ulTXbGKWrCDoi7J4zJC?f
11-6-0 6-2-4 13-0-0 19-10-8 26-1-8 33-0-0 39-2-12 46-0-0
"1-6-p 6-9-4 6-2-12 6-10-8 6-3-0 6-10-8 6-2-12 6-9 4 n
5x6= 3x6= 5x8= Sx6=
4 25 26 27 @8 7
4x6= 2x4n 3x8- 5X8WB= 3x6= 5XBWB- 3xB= 2x4n 4x6=
6-9-4 13-1-12 23-0 0 32-10-4 39-2-12 46-0-0
6-9-4 6-4-8 9-10-4 9-10-4 6-4-8 6-9 4
Scale = 1:81
Plate Offsets ()(-Y):[3:0-3-Dt0-3-4],[4:0-3-8,0-2-4],[6:0-3-0,0-3-0],[7:0-3-8,0-2-4]
Loading
(pst)
Spacing
2-0-0
CSI
DEFL
in
(loc)
Well
Ud
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.69
Vert(LL)
-0.45
11-13
>999
240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.80
Vert(CT)
-0.82
11-13
>672
180
BCLL
0.0•
Rep Stress Incr
YES
WB
0.78
Horz(CT)-
0.21
9
n/a
n/a
BCDL
10.0
Code
FBC2020/rP12014
Matrix -AS
Weight: 244 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.1 'Except' 14-12:2x4 SP M 31
WEBS 2x4 SP No.3
OTHERS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceilingdirectly-applied.
WEBS 1 Row at midpt 5-15,-6-11
REACTIONS (lb/size) 2=1936/0-8-0, 9=1838/ Mechanical
Max Horiz 2=312 (LC 11)
-Max Uplift 2=-1155 (LC 12), 9=1010 (LC 12).
-Max Gram 2=2260 (LC 20),-9=2168 (LC 21)
FORCES (lb) - Maximum Compression/Maximum
-Tension
TOP CHORD 1-2=0/42, 2-4=-4175/2185, 4-5=-3109/1844,
5-7=-3705/2147,7-8=3506/1953,
-8-9=-4188/2208
BOT CHORD 2-16=1846/3866, 15-16=1848/3861,
13-15=1718/3718, 11-13=173B/3650,
10-11=1844/3680, 9-1 0=1 844/3680
WEBS 3-16=0/242, 3-15=767/529, 4-15=-472/1177,
�15=-931/494, 5-13=0/332, 6-13=0/330,
6-11=927/486, 7-11=480/1177,
8-11=794/543, 8-10=0/244
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vult=163mph (&second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; 11=2511;
B=45ft; L=46ft; eave=6ft; Cat. 11; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
3-0-7, Interior (1) 3-0-7 to 13-0-0, Extedor(2R) 13-0-0 to
19-6-1, Interior (1) 19-6-1 to 33-041, Extedor(2R) 33-0-0
to 39-2-12, Interior (1) 39-2-12 to 46-0-0 zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live -load nonconcurrent with any other live loads.
6) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
chord and any other members, with BCDL = 10.Opsf.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 1010 lb uplift at
joint 9 and 1155 lb uplift at joint 2.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin'Ve19z.PE No.68192
MiTekUSA .Im FL Cert6834 _
""Parke East Blvd. TampaFL 33610
Date.
August 2,2021
A WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 51192020 BEFORE USE.'°
Design valid for use only with Mrrek® connectors. This design Is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design Into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANS11TP11 Quality Criteria, DSB-89 and BCSI Building Component
6904 Parke East Blvd.
Salta intbrmation available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
City
Ply
12792357
T24871881
A05
Hip
1
1
Job Reference (optional)
Builders FirstSource (rampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 18 2021 Print 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 3012:47:06 Page: 1
ID:wLtYj7ldPIW1 d9enRAf9lxz5M3H-RfC7PsB7OHg3NSgPgnLBw3ulTXbGKWrCDoi7J4zIC7f
1-6-0 7_9 4 15-0-0 23-0-0 31-0-0 38-2-12 46-0-0
1_g_p 7-9-4 7-2-12 8-0-0 8-0-0 7-2-12 7-9-4
7x8a 2x4u 7xB11
4 25'_6 527 28 6
o
m
Cn
v=
0
4x6- Wu 5x8 WB - 3x6= 4x8- 3xB= 3x6- 5x8 WB = 2x4u 4x6=
7-9-4 15-1-12 23-0-0 30-10-4 38-2-12 46-0-0
7-9-4 7-4-8 7-10-4 7-10-4 7-4-8 7-9-4
Scale = 1:81.2
Plate Offsets (X, Y):13:0-4-0,0-3-0],[4:0-4-4,0.2-0],-16:044,0-2-0],[7:0-4-0,0-3-01
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc)
Udefl
Lid
PLATES GRIP
TCLL (roof)
20.0 .
Plate Grip DOL•
1.25
TC
0.81
Vert(LL)
0.40
11-12-
>999
240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.77
Vert(CT)
-0.63
11-12
>871
180
BCLL
0.0'
Rep Stress Ina
YES
WB
0.73
Horz(CT)
0.20
8
n/a
n/a
BCDL
10.0
Code
FBC2020lrP12014
Matrix -AS
Weight: 246 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.1
WEBS
2x4 SP No.3
OTHERS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied.
BOT CHORD
Rigid ceiling directly applied.
WEBS
1 Row at midpt 3-14, 7-11
REACTIONS
(lb/size) 2=1936/0-8-0, 8=1838/ Mechanical
Max Horiz 2=356 (LC 11)
Max Uplift 2=1155 (LC 12), 8=1010'(LC 12)
Max Grav 2=2265 (LC 20), 8=2173.(LC 21)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/42, 2-4=-4130/2159, 4-5=3224/2011,
5-6=3224/2011, 6-8=-4133/2171
BOT CHORD
2-16=1809/3850, 14-16=1811/3844,
12-14=1281/3032, 11-12=1269/2815,
9-11=1805/3616, 8-9=1803/3622
WEBS
3-16=0/310, 3-14=941/607, 4-14=197/758,
4-12=-323r704, 5-12=534/515,
6-12=-315r701, 6-11=203/764,
7-11=958/622, 7-9=0/313
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; VuR=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=46ft; eave=6ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
3-0-7, Interior (1) 3-0-7 to 15-0 , Exterior(21R) 15-0-0 to
21-6-1, Interior (1) 21-6-1 to 31-0-0, Exterior(2R)-31-0-0
to 37-6-1, Interior (1) 37-6-1 to 46-0-0 zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) -Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6)- ' This truss has been designed for a live load cf-20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members, with BCDL = 10.Opsf.
7) Refer to girder(s) for truss to -truss connections.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 1155 lbupliftat
joint 2 and 1010 lb uplift at joint 8.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
Chord and 1/2" gypsum sheetrock be applied directly to.
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin;Velaz PE No.88182
MIT& USA, Ihcr FL.Cert 8634
8664 Parke:East Blvd. Tampa FL, 33610
bate_:
August 2,2021
A WARNING - Verity design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE 10II-7473 rev. 51192020 BEFORE USE.
Design valid for use only with MITek® connectors. This design Is based only upon parameters shown, and Is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design Into the overall
building design. Bracing Indicated is to buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
We[(
prevent
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TP/f Quality Criteria, OS"9 and BCS/Building Component
69D4 Parke East Blvd.
Satetyinformadon available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
city
Ply
2792357
A06P
Hip
1
1
T24871882
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 30 12:47:07 Page: 1
ID:OXRwxTJFA2elEJD?tAOa8z5M3G-RfC?PsB70Hg3NSgPgnL8w3uITXbGKMDoi7J4zJC?f
1-6-Q 6-8-3 12-1-0 17-0-0 23-0-0 29-0-0 34-5-13 39-6-12 46-0-0
1-6-0
6-8-3 5-4-13 4-11-0 6-0-0 6-0-0 5-5-13 5-0-15 6-5-4
5x6= 2x4a 5x8=
5 26 27628 7
10
4x6= 2x4n 6x8= 4x8= 4x8= 3x6= 48= 3x6- 4x6-
, 6-8 3 , 12-1-0 12;t-0 23-0-0 28-10-4 36-11-0 46-0-0
6-8-3 5-4-13 024-0 10-7-0 5-10-4 8-0-12 9-1-0
Scale = 1:81.4
Plate Offsets (X, Y):[3:0.3-0-,0-3-0),[5:0-3--0,0-2-0],[7:0-6-0,0-2-8),*[8:0-3-0,0-3-0]
Loading
(psf)
Spacing
2-0-0
-CSI
DEFL
in
(loc)
Vdefl
Lid
PLATES GRIP
TCLL (roof)
-20.0
Plate Grip DOL
1.25
Ta
0.55
Vert(LL)
0.20
17-20
>727
240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.98
Vert(CT)
-0.79
14-16
>518
180
BCLL
—0.0'
Rep Stress Incr
YES
WB
0.97
Horz(CT)
0.06
-10
n/a
rile
BCDL
10.0
Code
FBC2020/TPI2014
Matrix -AS
Weight: 263 Ito FT = 20%
LUMBER
TOP CHORD
2x4 SP No.2
BOT CHORD
2x4 SP No.1 *Except* 12-10:2x4-SP No.2
WEBS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied.
BOT CHORD
Rigid ceiling directly applied.
WEBS
1 Row at midpt 5.16, 5-14, 6-14, 7-14,
8-13
REACTIONS
(lb/size) 2=24610-8-0, 10=1236/ Mechanical,
16=2292/0-8-0
Max Horiz 2=400 (LC 11)
Max Uplift 2=431 (LC 12), 10=656 (LC 12),
16=1618 (LC 12)
Max Grav 2=326 (LC 24), 10=1571 (LC 21),
16=2578(LC 2)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP- CHORD
1-2=0/42, 2-4=637/806, 4-5=-437/808,
5-6=-1 174171 Z 6-7=-11741712.
7-9=2623/1217, 9-10=2841/1293
BOT CHORD
2-17=-639/97, 16-17=-638/84, 14-16=0/438,
13-14=319/1341, 11-13=717/1933,
10-11=1038/2488
WEBS
3-17=788/1199t 3-16=535/1345,
4-16=356/416, 5-16=1941/1249,
5-14=684/1422, 6-14=-400/404,
7-14=539/345; 7-13=-343/840,
8-13=862/574, 8-11=244/741,
9-11=-420/414-
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vuft=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=46ft; eave=6ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
3-0-7, Interior (1) 3-0-7 to 17-0-0, Exterior(2R) 17-0-0 to
23-6-1, Interior (1) 23-6-1 to 29-0-0, Extedor(2R) 29-0-0
to 35-6-1, Interior (1) 35-6-1 to 46-D-0 zone; porch left
exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip
DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
Chord live load nonconcurrent with any other live loads.
6) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
chord and any other members, with BCDL = 10.Opsf.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 431 Ito uplift at -
joint 2, 1618 lb uplift at joint 16 and 656 lb uplift at joint
10.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item -has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE 60.68182
MiTek U4, lhr, FLCert;6634'
8994 Parksiii st Blvd. Tampa FL 33610
bate:
August 2,2021
®WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/192020 BEFORE USE.
Design valid for use only with MiTek® connectors. This design Is based only upon parameters shown, and is for an individual building component, not
��a
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design Into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
_
MiTek
is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/lPlf Quality Criteria, DSB49 and BCS/ Building Component
69U Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T24871883
2792357
A07PT
Hi p
1
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33564,
0
to
o O1
`r=
0
4x6= 2x4u
6-3-12
6-3-12
Scale = 1:81.6
Run: 0.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MiTek Industries, Inc. Fit Jul 30 12:47:08 Page: 1
I D:sk?18pKtxMmksToAZbad8Mz5M3F-RfC?PsB70Hg3NSgPgnL8w3ulTXbGKWrCDoi7J4zJC7f
-8-8 12-1-0 14-8-12, 19-0-0 27-0-0 31-4-4 38-4-0 46-0-0
1_6_0 7-8-8 4 4-8 2-7-12 4 3-4 8-0-0 4 4-4 6-11-12 7-8-0
5x6- 5x6=
6 3031 32 33 7
Zu •— 3xB-
-6x8= 3x4u Zp
14-10-8 416 8
12-5-0 15-2-0
0-4-0 0-3-8
2-5-8 2-8-8
10
5x12= 4x12= 4x6=
3x4n
1-0 31-2-8 38-4-0 46-0-0
1-0 n_�_a 7-1-6 7-8-0
Plate Offsets (X, Y): [4:0-3-0,0-3-0), [6:0=3-8,0-2-4), [7:0-3-8,0-2-4), [9:0-4-0,0-3-0), [11:0-3-8,0-2-0), [14:0-3-8,0-2-8]
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc)
I/defl
Ud
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.70
Vert(LL)
-0.24
14-15
>999
240-
MT20 244/190
TCDL
10.0
Lumber_DOL
1.25
BC
0.92
Vert(CT)
-0.43
14-15
>948
180
-
BCLL
0.0'
Rep Stress Incr
YES
WB-
0.95
Horz(CT)
0.09
10
n/a
n/a
BCDL
10.0
Code
FBC2020frP12014
Matrix -AS
Weight: 281 lb FT = 20%
LUMBER
TOP CHORD 2x4 SPNo.2
BOT CHORD 2x4 SP No.2 *Except* 19-5,8-12:2x4 SP No.3
WEBS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied.
BOT CHORD
Rigid ceiling directly applied. Except:
10-0-0 oc bracing: 17-19, 12-14
WEBS
1 Row at midpt 6-17, 7-14, 4-20, 7-15
REACTIONS
(lb/size) 2=140/0-8-0, 10=1204/ Mechanical,
20=2447/0-8-0
Max Horiz 2=444 (LC 11)
Max Uplift 2=406 (LC 12), 10=644 (LC 12),
20=1643 (LC 12)
Max Grav 2=256 (LC 24), 1 0=1 523 (LC 21),
20=2734 (LC 2)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/42, 2-3=106/810, 3-5=656/1154,
5-6=151/357, 6.7=1051/627,
7-8=2342/1291, 8-10=2713/1213
BOT CHORD
2-21=-880/118, 20-21=892/216,
19-20=117/28, 18-19=0/0, 17-19=0/114,
5-17=233/293, 15-17=0/645,
14-15=224/1225, 12-14=0/146,
8-14=366/429, 12-13=0/0, 11-12=8/44,
10-11=951/2355
WEBS
17-20=1096/1045, 6-17=1630/1005,
7-14=753/1479, 11-14=-969/2374,
9-14=-480/426, 9-11=220/265,
3-20=-562/1126, 3-21=804/293,
4-20=1858/773, 4-17=542/1494,
7-15=-707/567, 6-15=-446/1151
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vuft=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=46ft; eave=6ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
3-0-7, Interior (1) 3-0-7 to 19-0-0, Extedor(2R) 19-0-0 to
25-6-1, Interior (1) 25-6-1 to 27-0-0, Exterior(2R) 27-0-0
to 33-6-1,-Interior (1) 33-6-1 to 46 0-0 zone; porch left
exposed;C-C-for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip
DOL=1.60
3) Building Designer/ Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) • This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members, with BCDL = I O.Opsf.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 406 lb uplift at
joint 2, 644 lb uplift at joint 10 and 1643 lb uplift at joint
20.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic Copies.
Jgagwn;Velez PE No.68182
Wilk USA, Inc. FIL Cert;6634'
CIS Parke East Blvd, Tampa FL, 33610
Gate:
August 2,2021
®WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/192020 BEFORE USE.
Design valid for use only with MTek® connectors. This design is based only upon parameters shown, and Is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MOW
always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSLIP/f Qualify Cdteda, DSB-89 and BCSI Building Component
6904 Parke East Blvd.
Safety Intormadon available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 2DS01
Tampa, FL 36610
Job
Truss
Truss Type
Oty
Ply
2792357
A08PT
Piggyback Base
3
1
T24871994
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33564,
Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 MTek Industries, Inc. Fri Jul 30 12:47:10 Page: 1
ID_EHDtFU1tMPuwTHgggQg85z5M32-RfC7PsB70Hg3NSgPgnL6v,3uITXbGKWrCDoi7J4zJC7f
1-6-0 7_g_g 12-1-0 14-8-12 17-4-8 , 23-0-0 28-7-8 31-4-4 38-4-0 46-0-0
1_g_p 7-8-8 4 4 8 2-7-12 2-7-12 5-7-8 5-7-8 2-8-12 6 11_12 7-8-0
5x6- 2x4a 5x6=
N
4x6- 2x4.a BXB= 3x4n 5x12= 4x12= 4x6=
14-10-8 5x12- 3x4a
6-3-12 12-1-0 12i15-0 15��-0 19-2-8 , 23-0-0 30-11-0 31;2-8 38-4-0 46-0-0
6-3-12 5-9-4 0-4-0 0-3-8 4-0-8 3-9-8 7-11-0 0-3-8 7-1-8 7-8-0
2-5-8
Scale=1:81.4
Plate Offsets (X, Y): [4:13-3-OA3-0], [6:0-3-Lj 2-0], [8:0-3_0,0-2-01, 110:GA-0,0-3-0], [12:0-3-8,0-2-0], [15:0-3-8,0-2-8]
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in (loc)
Udefl
L/d
PLATES GRIP
TCLL (roof)
20.0
Plate -Grip DOL
1.25
TC
0.67
Vert(LL)
-023 15-16
>999
240
MT20 244/190
TCDL
10.0-
LumberDOL
1.25
BC
0.90
Vert(CT)
-0.42- 15-16
>964
180
BCLL
-0.0'
Rep Stress Incr
YES
WB
0.95
Horz(CT)
0.OB 11
rile
n/a
BCDL
10.0
Code
FBC2020rTP12014
Matrix -AS
Weight: 287 lb FT = 20%
LUMBER
TOP CHORD
2x4 SP No.2
BOT CHORD
2x4 SP No.2 *Except* 20-5,9-13:2x4 SP No.3
WEBS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied,
except
2-0-0 oc puriins (5-2-15 max/: 6-8.
BOT CHORD
Rigid ceiling directly applied: Except:
11O-0-0 oc bracing: 18-20, 13-15
WEBS
1 Row at midpt 6.18, 6=16, 8-16, 4-21
REACTIONS
(lb/size) 2=114/0.8-0, 11=1195/ Mechanical,
21=2482/0-8-0
Max Horiz 2=409 (LC 11)
Max Uplift 2=399 (LC 12). 11=641 (LC 12),
21 =1 653 (LC 12)
Max Grav 2=222 (LC 24), 11=1507 (LC 21),
21=2759 (LC 2)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/42, 2-3=-111/852, 3-5=676/1196,
5-6=197/394, 6-7=117216M
7-8=1172/686,8-9=2282/1264,
9-11=-2678/1207
BOT CHORD
2-22=920/133, 21-22=9321230,
20-21=118/31, 19-20=0/0, 18-20=0/116,
5-1 8=1 81/231, 16-18=21/394,
15-16=-314/1388, 13-15=0/146,
9-15=336/419, 13-14=0/0, 12-13=4/42,
11-12=948/2324
WEBS
18-21=1143/1056, 6-18=1572/1008,
6-16=749/1471, 7-16=380/404,
8-16=590/375, 8-15=704/1361,
12-15=971/2346, 10-15=-490/430,
10-12=217/266, 3-21=563/1125,
3-22=-805/293, 4-21=-1842/775,
4-18=508/1470
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vuh=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=46ft; eave=6ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
3-0-7, Interior (1) 3-0-7 to 17-4-8, Exterior(21R) 17-4-8 to
23=10-9, Interior (1) 23-10-9 to 28-7-8, Extedor(21R)
2817-8 to 35-1-9, Interior (1) 35-1-9 to 46-0-0 zone;
porch left exposed;C-C for members and forces &
MWFRS for reactions shown; Lumber DOL=1.60 plate
gnp DOL=1:60
3) Building Designer/ Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) • This truss has been designed for a live load of 20.0psf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members, with BCDL = 10.Opsf.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 399 lb uplift at
joint 2, 641 lb uplift at joint 11 and 1653 lb uplift at joint
21.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
10) Graphical punin representation does not depict the size
or the orientation of the punin along the top and/or
bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE No.68182
MiT&USA,Jnc;FLi Oe 0634 .
8804 Perke.Fast Btvd. Tampa FL 3300
Date:
August 2,2021
®WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 6119/2020 BEFORE USE.
Design valid for use only with MTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design into the overall
building design. Bracing Indicated Is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing MiTek°
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSIITP/f Quality Crfteda, DSB-89 and SCSI Building Component 6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601 Tampa, FL 3651D
Job
Truss
Truss Type
Qty
Ply
T24871885
2792357
A09PT
Piggyback Base
2
1
_Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33554, Run: 8.43 S Jul 162021 Print 8.430 S Jul-16 2021 MiTek Industries, Inc. Fri Jul 3012:47:10 Page: 1
ID:yWBHd8 CsIriVFVbp500XUz5MtK-RfC4PsB70Hg3NSgPgnL8w3ulTXbGKWrCDoi7J4zIC?f
7_8_8 12-1-0 14-8-12 17-4-B 23-0-0 28-7-8 31 4-4 37-10-12 46-0-0
1_B_0 7-8-8 4-4-8 2-7_12 2-7-12 5-7-8 5-7-8 2-8-12 6-6-8 8-1-4
5x6= 2x4a 5x6=
M
�i
a 00
mm
M N
O O
4x6= 2x4a 6x8= 3x4n 5x12- 3x10-
15-2-8X12= 3x4 u
6-1-0 12-1-0 14-10-8, 19-2-8 23-0-0 30-1.1-0_ 31-2-8- 38-0-8 45-8-8 46-0-0
6-1-0 6--0-0 2-9-8 40-8 3-9-8- 7-11-0 0-3-8 6-10-0 7-8-0
0-3-8
Scale = 1:86.8
cl`
Plate Offsets (X, Y):
[4:0-3-0,0-3-0], [6:0-3-0,0-2-0], [8:0-3-0,0-2-0], [10:0-5-4,0-3-4], [13:0-3-8,0-1-B], [16:0-3-12,0-2-8]
Loading
(psf)
Spacing
2-D-0
---CSI
DEFL
in
(loc)
Udefl
Ud
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
. TC
0.84
Vert(LL)
-0.24
16-17
>999
240
MT20- 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.90
Vert(CT)
-0.43
16-17
>945
180
BCLL
0.0'
Rep Stress Incr
YES
WBthX-AS
0.89
Horz(CT)
0.08
28
n/a
n/a
BCDL
10.0
Code
FBC2020frP12014
Weight: 303 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2 *Except` 21-5,9-14:2x4 SP No.3
WEBS
2x4 SP No.3 *Except* 11-12:2x4 SP No.1
OTHERS.
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied,
except end verticals, and 2-0-0 oc purlins
(54-8 max.): 6-8, 10-11.
BOT CHORD
Rigid ceiling directly applied. Except:
10-0-0 oc bracing: 19-21, 14-16
WEBS
1 Row at midpt 6-19, 6-17, 8-17, 4-22,
1 D-12
REACTIONS (lb/size) 2=93/D-8-0, 22=2505/0-B-0,
28=1158/0-3-8
Max Horiz 2=338 (LC 12)
Max Uplift 2=325 (LC 11). 22=1757 (LC 12),
28=-609 (LC 12)
Max Grav 2=211 (LC 24), 22=2781 (LC 2).
28=1360 (LC 21)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=-213/890, 3-5=-936/1226,
5-6=326/439, 6-7=1117/650, 7-8=1117/650,
8-9=2190/1245, 9-10=2171/1042,
1(3-11=164/86, 12-24=-445/1175,
11-24=-445/1175
BOT CHORD 2-23=905/50, 22-23=-919/153,
21-22=121/34, 20-21=0/0, 19-21=0/129,
5-19=181/283, 17-19=0/296,
16-17=-559/1389, 14-16=0/142,
9-16=365/467, 14-15=0/0, 13-14=28/48,
12-13=-973/2104
WEBS 19-22=1128/999; 6-19=-1580/1150,
9) This truss design requires that a minimum of 7/16"
6-17=792/1452, 7-17=380/408,
structural wood sheathing be applied directly to the top
8-17=570/413, 8-16=7.16/1308,
chord and 1/2" gypsum sheetrock be applied directly to
13-16=981/2131, 10-16=-282/203,
the bottom chord.
10-13=-253/329, 3-22=553/1097,
10) Graphical purlin representation does not depict the size
-3-23=823/300, 4-22=1824/992,
or the orientation of the purin along the top and/or
4-19=718/1454, 10-12=2201/1006,
bottom chord.
11-28-1507/743 LOAD CASE(S)- Standard
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE7-16; VuR=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.0psf; h=25ft;
B=45ft; L=46ft; eave=6ft; Cat. 11; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
3-0-7, Interior (1) 3-0-7 to 17-4-8, Exterior(2R) 17-4-8 to
21-11-11,Interior (1) 21-11-11 to 28-7-8, Exterior(2R)
28-7-8 to 33-2-11, Interior (1) 33-2-11 to 45-6-12 zone;
porch left exposed;C-C for members and forces &
MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements=specific to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members, with BCDL = I O.Opsf.
7) Bearing at joint(s) 28 considers parallel to grain value
using ANSI/TPI 1 angle to grain formula. Building
designer should verify capacity of bearing surface.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 325 lb uplift at
joint 2, 1757 lb uplift at joint 22 and 609 lb uplift at joint
28.
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE No.68182
MiTilkUSA, nc. FL`.Ce t 6634'
890b Parke East Blvd. Tampa FL 83610
Date:
August 2,2021
®WARNING - verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/1912020 BEFORE USE.
Design valid for use only with Mrrek® connectors. This design Is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the building designer must verity the applicability of design parameters and property incorporate this design into the overall
building design. Bracing indicated is to buckling of individual truss web antl/or chord members only. Additional temporary and permanent bracing
MiTek"
prevent
is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSUTPIf quality Criteria, DSB-89 and BCSI Building Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
12792357
A10PT
Piggyback Base
2
1
T24871886
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33564,
Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MTek Industries, Inc. Fri Jul 3012:47:11 Page: 1
I D:KMRPYKo9g29BUmHzbt4csuz5MGr-RfC?PsB70Hg3NSgPgnL8w3ulTXbGKWrCDoi7J4zJC?f
1-6-0 12-1-0 14-8-121 17-4-8 I 23-0-0 28-7-8 I 35-10-12 40-9-10 I 46-0-0
1-6-0 7-8-8 4-4-8 2-7-12 2-7-12 5-7-8 5-7-8 7-3-4 4-10-14 5-2-6
5x6= 3x6= 5x6=
6 40 41 74213 8
no
o^
m
d�
dr w rr
`r 38
C 2
�= 1
O 45 22
4x6=
6-1-0
6-1-0
Scale = 1:88.8
3x4e
54 0 5
61' 439
34
3
46to1
0 J
21 19
6x8 = 3x4 n
5x12=
15-2-0
44 6x8= 3x6=
6x8n
9 10
11
�I
7
0 0
m o
c7 cV
12
O O
1747 16 48 15 14
H13H
5x8=
(b to
3x8= 3x6= 3x8=
3x8=
4x8=
3x6=
31-4-4
36-10-12
30-11-0
35-2-B 37-4-0
I " 4-0-8 ' 3-9-8 5-5-12 *1-11-4 ' 1-10-42-0-0' ' '' B-4-8
0-3-8 0-6-0 0-10-0
0-5-4 -0-10-4
0-5-4
Plate Offsets (X, Y): [4:0-3-0,0-3-0], [6:0-3-0,0-2-0], [8:0-3-8"0-2-4], [33:0--3-8,0-1-8]
Loading
(psf)
Spacing
2=0-0
CSI
DEFL
in
(loc)
Udefl
Ltd
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.76
Vert(LL)
-0.19
16-18
>_999
240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.71
Vert(CT)
-0.40
12-13
>999
180
BCLL
OA'
-Rep Stress Incr
—YES
WB
0.78
Horz(CT)
-0.05
37
n/a
n/a
BCDL
10.0
Code
FBC2020/TPI2014
Matrix -AS
Weight: 304 lb FT = 20%
LUMBER
TOP CHORD
2x4 SP No.2
BOT CHORD
2x4 SP No.2 *Except* 20-5:2x4 SP No.3,
14-12:2x4 SP-No.1
WEBS
2x4 SP No.3 *Except* 11-12:2x4 SP No.2
OTHERS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied,
except end verticals, and 2-0-0 cc purlins
(3-5-10 max.): 6-8, 9-11.
BOT CHORD
Rigid ceiling directly applied. Except:
5-3-0 cc bracing: 13-15
10-0-0 cc bracing: 18-20
WEBS
1 Row at midpt 6.18, 6-16. 4-21, 10-12;
9-15
REACTIONS
(lb/size) 2=108/0-B-0, 21=2482/D-B-0,
37=1158/0-3-8
Max Horiz 2=403 (LC 12)
Max Uplift 2=315 (LC 11), 21 =1 755 (LC 12).
37=619 (LC 12)
Max Grav 2=219 (Lc 24), 21=2746 (LC 2),
37=1326 (LC 21)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/42, 2-3=220/849, 3-5=940/1197,
5-6=317/404, 6-7=1093/649,
7-8=-1465/911, 8-9=1676/856,
9-10=2626/1268, 1 D-1 1 =1 75/58,
12-33=538/1212, 11-33=538/1212
BOT CHORD
2-22=-848/32, 21-22=862/96,
2(3-21=141/29, 19-20=0/0, 1B-20=0/128,
5-18=-179/278, 16-18=3/295,
15-16=389/1043, 13-15=1286/2646,
12-13=831/1559
WEBS 18-21=1042/932, 6-18=-1518/1148,
6-16=-774/1386,7-16=779/704,
7-15=-435/617, B-15=0/366, 3-21=552/1096,
3-22=-623/300,4-21=-1821/1020,
4-18=742/1450, 9-13=486/455,
10-13=-548/1338, 10-12=1737/970,
9-15=13871742, 11-37=13491673
NOTES
1) Unbalanced roofJive loads have been considered for
this design.
2) Wind: ASCE 7-16; Vuft=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
8=45ft; L=46ft; eave=6ft; Cat. ll; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
3-0-7, Interior (1) 3-0.710-17-4-8, Extedor(2R) 17-4-8 to
21-11-11, Interior (1) 21-11-11 to 28-7-8, Exterior(2R)
28-7-8 to 33-2-11, Interior (1) 33-2-11 to 45-6-12 zone;
porch left exposed;C-C for members and forces A
MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) All plates are 2x4 MT20 unless otherwise indicated.
6) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
7) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
Chord and any other members, with BCDL = 10.Opsf.
8) Bearing at joint(s) 37 considers parallel to grain value
using ANSIRPI 1 angle to grain formula. Building
designer should verify capacity of bearing surface.
9) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 315 lb uplift at
joint 2, 1755 lb uplift at joint 21 and 619 lb uplift at joint
37.
10) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 10 gypsum sheetrock be applied directly to
the bottom chord.
11) Graphical purin representation does not depict the size
or the orientation of the purlin along the top and/or
bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin:Velez PE No.69192
MiTefcUSA, Inc. FL:Cert $634
6904 Parke &4 Blvd..T.ampa FC M610
;Date:
August 2,2021
® WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII.7473 rev. 51192020 BEFORE USE.
`
Design valid for use only with MTek® connectors. This design Is based only upon parameters shown, and Is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSr/TF11 quality Criteria, DSB49 and BCS/ Building Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
city
Ply
T24871887
2792357
A11PT
Piggyback Base
9gy
1
1
Job Reference (optional)
Builders FlrstSource (Tampa, FL), Tampa, FL- 33564,
Scale = 1:81.4
Run: 8.43 S Jul 16 2021 Print 8.43M Jul 16 2021 MiTek Industries, Inc. Fri Jul 3012:47:14 Page: 1
I D:KwZgM9LVigubUcNM71CsfZz5M3E-RfC7PsB70Hg3 NSgPgnL8w/3ulTXbG KWrCDoi7J4zJC7f
-1-6-0 7_g_g 12-1-0 14-8-12 17 4 8 } 23-0-0 28-7-8 31-_41 , 38 4-0 _46-0-0
1_g_p 7-6-8 4-4-8 2-7-12 2-7-12 5-.7---8 5-7-8 2-8-12 6-11-12 7-8-0
Sx6= 2x4a 5x6=
IT
- -- n
4x6= 2x4b 6x8= 3x4u 5x12= 4x12= 4x6=
14-10-8 5x12- 3x4n
6-1-0 12-1-0 12-q-0 15-2-0 19-2-8 i 23-0-0 30-11-0 31-�-8 38-4-0 46-0-0
6-1-5 6-0-0 0-4-0 0-3-8 4-0-8 _3-9-8 7-11-0 0.3_g 7-1-8 7-8-0
2-5-8
Plate Offsets (X, Y):
[4:0-3-0,0-3-0], [6:0-3-0,0-2-0], [8:0.3-0,0-2-0], [10:0-4-0,0-3-0], [12:0-3-8,0-2-0], [15:0-3-8,0-2-8]
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc)
Udefl
Ud .
PLATES GRIP
TCLL-(roof)
20.0
Plate Grip DOL
1.25
TC
0.67
Vert(LL)
-0.23
15-16
>999
240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.90
Vert(CT)
-0.42
15-16
>964
180
BCLL
0.0'
Rep Stress Incr
YES
WB
0.95-
Horz(CT)
0.08
11
n/a
n/a
BCDL
10.0
Code
FBC2020/rP12014
Matrix AS
-
Weight: 287 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2 `Except• 20-5,9-13:2x4 SP No.3
WEBS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied,
except
2-0.0 cc purlins (5-2-15 max.): 6-8.
BOT CHORD
Rigid ceiling directly applied. Except:
10-0-0 oc bracing: 18-20, 13-15
WEBS
1 Row at midpt 6-18, 6-16, 8-16, 4-21
REACTIONS
(lb/size) 2=113/0-8-0, 11=1195/ Mechanical,
21=2484/0-8-0
Max Horiz 2=409 (LC 11)
Max Uplift 2=397 (LC 12), 11=641 (LC 12).
21=1656 (LC 12)
Max Grav 2=220 (LC 24), 11 =1 507 (LC 21),
21=2762 (LC 2)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/42, 2-3=114/849, 3-5=683/1198,
5-6=209/398, 6-7=1171/680,
7-8=1171/680, 8-9=2282/1258,
9-11 =2677/1202
BOT CHORD
2-22=919/126, 21-22=934/240,
20-21=121/37, 19-20=0/0, 18-20=01131,
5-18=-181/229, 16-'18=19/383,
15-16=310/1388, 13-15=0/146,
9-15=-336/419, 13-14=0/0, 12-13=-4/42,
11-12=944/2323
WEBS
18-21=-1144/1065, 6-18=1572/1015,
6-16=751/1471, 7-16=380/404,
8-16=-590/378, 8-15=704/1361,
12-15=96812346, 10-15=-490/431,
10-12=-217/266,3-21=553/1095,
3-22=822/300, 4-21=1843/769,
4-18=-499/1470
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2). Wind: ASCE 7-16; Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=46ft; eave=6ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and-C-C Exterior(2E)-1-6-13 to
3-0-7, Interior (1) 3-0.7 to 17-4-8, Exterior(2R) 17-4-8-to
23-10-9, Interior (1) 23-10'9-to 28-7-8, Exterior(21R)
28-7-8 to 35-1-9, Interior (1) 35-1-9 to 46-0-0 zone;
porch left exposed;C-C for -members and tomes &
MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
3) Building Designer / Project=engineer responsible for
-verifying applied roof -live load shown covers rain loading
requirements speck to the -use of this truss component.
4) Provide adequate drainage -to prevent waterponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) ` This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3=06-00 tall by 2-OD-00 widewill fit between the bottom
Chord and any other members, with BCDL = 10.Opsf.
7) Refer to girder(s) for trussto truss connections.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 397 lb uplift at
joint 2, 641 lb uplift at joint 11 and 1656 lb uplift at joint
21.
9) This truss design requires that a minimum of 7116"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
10) Graphical purlin representation does not depict the size
or the orientation of the purlin along the top and/or
bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
-Joaquin Velez PE No.68192
MiTefi USA, Inc. FL Cert 6834
liaK Parke East Blvd. Tampa FL,3X10
Data,
August 2,2021
®WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-1473 rev. 5/19/2020 BEFORE USE.
Design valid for use only with MITek® connectors. This design Is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
Mel(
always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing oftrusses and truss systems, see ANSbTP11 Quality Criteria, DSB-89 and BCS/ Building Component
6904 Parke East Blvd.
Setetyinformatlon available from Truss Plate Institute, 2670 Crain Highway, fluke 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
City
Ply
2792357
Al2P
Hip
1
1
T24871888
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 30 12:47:15 Page: 1
ID:o673ZVL8TzOS5myZgOj5Cnz5M3D-RfC?PsB7OHg3NSgPgrtL8w3ulTXbGKWrCDoi7J4zJC7f
;1'6'Q 6-8-3 12-1-0 18-10-0 23-0-0 27-2-0 33 4-0 39-4-5 46-0-0
1-6-0 6-8-3 5-4-13 6-9-0 4-2-0 4-2-0 6-2-0 6-0-6 6-7-11
5x6= 3x6= 5x6-
5 296 627 28 7
f0
4x6= 2A 6x8= 3x8= 5xB= 3x8= 4x8= 3x6= 4XS=
, 12-1-0 121
6-8-3 15-0 18-11-12 27-0-4 36-9-14 46-0-0
6-8-3 5-4-13 0-W-0 6-6-12 8-0-8 9-9-10 9-2-2
Scale = 1:81.8
Plate Offsets (X, Y): [3:0-3-0,0-3-0], [5:0-4-0,0.2-8], [7:0-3-0,0-2-0], [8:0-- 0,0-3-0], [16_0-3-8,0-3-0]
Loading
(psf)
Spacing
2-0.0
CSI
DEFL
-in
(loc)
I/deft
Lid
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.56
Vert(LL)
0.21
17-20
>707
240
MT20 244/190
TCDL
10.0
-Lumber DOL
1.25
BC
0.76
Vert(CT)
-0.47
11-13
>869
180-
BCLL
0.0'
Rep Stress Incr
YES
WB
0.70
Horz(CT)
0.05
10
n/a
n/a
BCDL
10.0
Code
FBC2020/TPI2014
Matrix -AS
Weight: 268 lb FT = 20%
LUMBER
TOP CHORD
2x4 SP No.2
BOT CHORD
2x4 SP No.1
WEBS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied.
BOT CHORD
Rigid ceiling directly applied.
WEBS
1 Row at midpt 4-14, 5-14, 6-14, 8-13,
4-16
REACTIONS
(lb/size) 2=27310-8-0, 10=1246/ Mechanical,
16=2255/0-8-0
Max Horiz 2=441 (LC 11)
Max Uplift 2=-459 (LC 12), 10=666 (LC 12),
16=1579-(LC 12)
Max Grav 2=360 (LC 21), 10=1582 (LC 18).
16=2531 (LC 2)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/42, 24=543/191, 4-5=826/475,
5-6=-643/516, 6-7=1324/868,
7-9=2651/1244, 9-1O=2863/131$
BOT CHORD
2-17=-633/114, 16-17=629/117,
14-16=751/806, 13-14=92/994,
11-13=676/1827, 10-11=-1045/2504
WEBS
3-17=763/256, 3-16=579/1297,
4-14=-885/1646, 5-14=-115/184,
6-14=974/594, 6-13=342/768,
7-13=-60/334,8-13=-938/643,
8-11-284/846, 9-11=-442/443,
4-16=2029/1396
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vutt=163mph (3-second gust)
Vasd=126mph; TGDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=46ft; eave=6ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Extedor(2E)-1-6-13 to
3-0-7, Interior (1) 3-0-7 to 18-10-0, Exterior(2R) 18-10-0
to 25-4-1, Interior (1) 25-4-1 to 27-2-0; Exterior(2R)
27-2-0 to 33-4-12, Interior (1) 33-4-12 to 46-0-0 zone;
porch -left exposed;C-C for members and forces &
MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
3) Building Designer/Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members, with BCDL = 10.0psf.
7) Refer -to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 459 lb uplift at
joint 2 1579 lb uplift at joint 16 and 666 lb uplift at joint
10.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This -item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies -of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin, Velez PE No:63182
MIT& USA, Inc. FL`.CertB634 .
6004 Parke.East Blvd. Tampa FL 33610
Date:
August 2,2021
® WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 51192020 BEFORE USE.
Design valid for use only with MTrek® connectors. This design is based only upon parameters shown, and Is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design Into the overall
building design. Bracing Indicated is to prevent buckling of Individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANS1,TPI1 Quality Criteria, DSB49 and BCS/ Building Component
6904 Parke East Blvd.
Safetylrriormation available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 2D601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T24871889
2792357
A13P
Hip
1
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 162021 MTek Industries, Inc. Fri Jul 30 12:47:16 Page: 1
ID:HJhRmrMmEHBJjwWIEjEKk z5M3C-RfC7PsB70Hg3NSgPgnL8w3ulTXbGKWrCDoi7J4zJC7f
1-6-Q 5-11-11 12-1-0 16-10-0 23-0-0 29-2-0 34-7-3 40-0-5 46-0-0
1-6-0 5-11-11 6-1-5 4-9-0 6-2-0 6-2-0 5-5-3 5-5-3 5-11-11
5x8= 2x4u 5x8=
5 27 2829 7
10
4x6- 2x4o 6x8- 3x8- 4x8= 3x6= 4x8= 3x6= 4X6=
4x6=
5-11-11i 12-1-0 12t5 --0 16-11-12 23-0-0 29-0-4 37-3-12 46-0-0
5-11-11 6-1-5 024-0 4-6-12 6-0-4 6-0 4 8-3-8 8-8-4
Scale = 1:81.4
Plate Offsets (X, Y):[3:0-3-0,0-3-0],(5:0-6-0,0-2-8],[7:0-6-0,0-2-8],[8:0-3-0,0-3-0],[17:0-3-8,0-3-0]
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc)
Vdefl
Lid
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TIC
0.47
Vert(LL)
-0.20
11-13
>999
240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.93
Vert(CT)
-0.37
11-13
>999
180
BCLL
0.0 •
Rep Stress Incr
YES
WB
0.62
Horz(CT)
0.06
10
n/a
n/a
BCDL
10.0
Code
FBC2020rrP12014
Matrix -AS
Weight: 272 lb FT = 20%
LUMBER
TOP CHORD
2x4 SP No.2
BOT CHORD
2x4 SP No.2
WEBS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied.
BOT CHORD
Rigid ceiling directly applied.
WEBS
1 Row at midpt 4-17, 4-15, 5-15, 5-14,
6-14. 7-14. 8-13
REACTIONS
(lb/size) 2=267/0-8-0, 10=1244/ Mechanical,
17=2262/0-8-0
Max Horiz 2=397 (LC 11)
Max Uplift 2=-453 (LC 12), 10=664 (LC 12),
17=1588 (LC 12)
Max Grav 2=343 (LC 24), 1 0=1 581 (LC 21),
17=2510 (LC 2)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/42, 2-4=588/814, 4-5=568/338,
5-6=1182r735, 6-7=11821735,
7-9=2675/1230, 9-10=2904/1327
BOT CHORD
2-18=600/100, 17-18=-596/104,
15-17=728/835,14-15=0/489,
13-14=333/1387,11-13=-734/1962,
10-11=1074/2549
WEBS
3-18=730/263, 3-17=632/1359,
4-17=-2093/1383,4-15=-BB3/1638,
5-15=1033/816. 5-14=757/1291.
6-14=-415/420, 7-14=-588/310,
7-13=320/901, 8-13=840/579,
8-11=234/715, 9-11=-415/415
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vuh=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=46ft; eave=6ft; Cat. ll; Exp C: Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
3-D-7, Interior (1) 3-0-7 to 16-10-0, Exterior(2R) 16-10-0
to 23-4-1, Interior (1) 23-4-1 to 29-2-0, Exterior(2R)
29-2-0 to 35-8-1, Interior (1) 35-8-1 to 46-0-0 zone;
porch left exposed;C-C for members and forces &
MWFRS for reactions shown; Lumber DOL-=1.60 plate
grip DOL=1.60
3) Building Designer/ Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specfic to the use of this truss component.
4-) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) • This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members, with BCDL = 10.Opsf.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 453-lb uplift at
joint 2, 15BB lb uplift at joint 17 and 664 lb uplift at joint
10.
9) This truss design requires that a minimum -of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin;Velez PE 110.6811112
MIT&USA, Ir&.FL:Cert,8834
' 6804 Parke Eest$Ivd. Tampa FL. 33610
::Date:
August 2,2021
® WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/192020 BEFORE USE.
Design valid for use only with MTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property incorporate this design into the overall
building design. Bracing Indicated is to buckling of Individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
prevent
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing oftrusses and truss systems, see ANSI/TP11 Qualify Crlferfe, DSB-89 and BCS/ Building Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Oty
Ply
2792357
A14P
Hip
1
1
T24871890
=(optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 18 2021 Print 8.430 S Jul 16 2021 MTek Industries, Inc. Fri Jul 30 12:47:17 Page: 1
ID:IVFp BNO?bGAL45xoRIZHCz5M3B-RfC?PsB70Hg3NSgPgnLBw3ul7XbGKWrCDoi7J4zJC7f
-1-6-0 7-6-4 12-1-0 14-10-0 19-5-111 26-6-6 31-2-0 38-3-12 46-0-0
1-6-0 7-6-4 4-4-12 2-9-0 4-7-10_ 7-0-11 4-7-10 7-1-12 7-8-4
5x6- 3x6= 5x6- 5x6=
5 6 299 30 31 7 8
46= 2x4a 6x8= 3x8= 3x8= 3x6= 3x8= 48- 2x4n 4x6=
14-11-1 sue=
6-3-12 12-1-0 12;5-0123-0-0 31-0-4 38-3-12 46-0-0
6-3-12 5-9-4 p_q-0 8-0-4 8-0-4 7-3-8 7-84
2-6-12
Scale = 1:81.2
Plate Offsets (X, Y):
[3:D-3-0,0-3-4],[5:0-3-0,0.2-0),17:0-3-0,0-3-0),[8:D-3-0,0-2-0),[9:0=4 0,0-3-0]
Loading
(pso
Spacing
2-0-0
CSI
DEFL
in
(loc)
Udefl
Ud
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.69
Vert(LL)
0.20
11-25
>999
240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.82
Vert(CT)
-0.33
13-14
>999
180
BCLL
0.0'
Rep Stress Incr
YES
WB
0.74
0.06
10
n/a
n/a
BCDL
10.0
Code
FBC2020/rP12014
Matrix -AS
_Horz(CT)
Weight: 266 lb FT = 20%
LUMBER
TOP CHORD
2x4 SP No.2
BOT CHORD
2x4 SP No.2
WEBS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied.
BOT CHORD
Rigid ceiling directly applied.
WEBS
1 Row at mfdpt 6-16, 7-14, 7-13, 9-13,
5-18
REACTIONS
(lb/size) 2=204/0-8-0, 10=1221/ Mechanical,
18=2349/0-8-0
Max Horiz 2=353 (LC 11)
Max Uplift 2=-420 (LC 12). 10=652 (LC 12).
18=1632 (LC 12)
Max Grav 2=276 (LC 24). 10=1529 (LC 21),
18=2593 (LC 2)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/42, 24=642/941, 4-5=-5D9/937,
5-6=-86/106, 6-8=1639/946,
8-10=2724/1243
BOT CHORD
2-19=678/106, 18-19=690/186,
16-18=-171/540, 14-16=75/774,
13-14=371/1362, 11-13=985/2360,
10-11=984/2366
WEBS
5-16=-629/1512, 6-16=1470/923,
6-14=-438/1018, 7-14=613/539,
7-13=161/296, 8-13=1071493,
9-13=973/638, 9-11=0/312, 3-18=555/1158,
3-19=811/297, 4-18=216/258,
5-18=2130/1128
NOTES
1) Unbalanced roof five loads have been considered for
this design.
2) Wind: ASCE 7-16; VuB=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf, h=251L;
B=45ft; L=46ft; eave=6ft; Cat. II; Exp_C; Enclosed;
MWFRS (directional) and C-C Exteriog2E)=1-6-13 to
3-0-7, Interior (1) 3-0-7 to 14-10-0, Exterior(21R) 14-10-0
to 21-4-1, Interior (1) 21-4-1 to 31-2-0, Extedor(2R)
31-2-0 to 37-8-1, Interior (1) 37-8-1 to 46-0-0 zone;
porch left exposed;C-C for members -and forces &
MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
3) Building Designer /Project engineer responsible for
verifying applied roof live load shown covers rein loading
requirements speck to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) • This truss has been designed for a live load of 20.0psf
on the bottom chord_jn all areas where a rectangle
3-06-00 tall by 2-0040 wide will fit between the bottom
chord and any other members, with BCDL = 10.0psf.
7) Refer to girder(s) for -truss to truss connections.
8) Provide mechanical -connection (by others) of truss to
- bearing plate capable of withstanding 420 lb uplift at
joint 2, 652 lb uplift at joint 10 and 1632 lb uplift at joint
18.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has-been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
,Joaquin Velez PE No.68182
MITekUSA, 1&..FLconB634 .
69D4 Parke;Eest Blvd. Tampa FL 33810
.:Date:
August 2,2021
® WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 51192020 BEFORE USE.
Design valid for use only with MTek® connectors. This design Is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property incorporate this design Into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MOW
always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSLITP11 Querrry Criteria, DSB-89 and SCSI Building Component
6904 Parke East Blvd.
SaBrylnlormeilon available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
12792357
T24871891
A15
Hi P
1
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564,
Scale = 1:81
Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MTek Industries, Inc. Fri Jul 3012:47:18 Page: 1
I D:IVFp_BN O?bGAL45xoRIZH Cz5M3B-RfC?PsB7OHg3NSgPgnL8w3ulTXbGKWrCDoi7J4zJ C?f
1-6-0 6-4-12 12-1%0 19-7-15 26-4-1 33-2-0 39-7-4 46-0-0
1-6-0 6 4-12 6-5-4 6-9-15 6-8-3 6-9-15 6-5-4 6-4-12
5x8= 2x4u 5x8= Sx6=
4 2$ 26 27 128 7
4x6- 2x4n 3x6= 4x8= 3x8= 2u4n 5x8 WE = 3x8= 2x4n 4x6=
6-4-12 12-11-12 19-7-15 26-4-1 33-0-4 39-7-4 46-0-0
6-4-12 6-7-0 6-8-3 6-8-3 6-8-3 6-7-0 6-4-12
Plate Offsets (X, Y): [3:0-3-0,0-3-4], [4:0-5-8,0-2-4], [6:04-0,0-3-0), [7:0-3-8,0-2-4]
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc)
Udefl-
Ud
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC_
0.68
Vert(LL)
0:48
13-14
>999
240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0-97
Vert(CT)
-0.72
13-14
>770
180
BCLL
0.0'
-Rep Stress Incr
YES
WB
0.83
Horz(CT)
0.25
9
n/a
n/a
BCDL
10.0
Code
FBC2020/TPI2014
Matrix -AS
Weight: 252 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No
WEBS 2x4 SP No.3
OTHERS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceiling directly applied.
WEBS 1 Row at micipt 6-14, 6-11
REACTIONS (lb/size) 2=193610-8-0, 9=1838/ Mechanical
Max Horiz 2=309 (LC 11)
Max Uplift 2=1155 (LC 12), 9=1010 (LC 12)
Max-Grav 2=2264 (LC 20), 9=2168 (LC 21)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-4=-4221/2193, 4-5=3678/2172,
-5-7=3678/2172, 7-8=3510/1958,
8-9=-4229/2221
BOT CHORD 2-17=1861/3910, 16-17=1863/3904,
14-116=1402/3214, 13-14=1750/3726,
11-13=1750/3726, 1D-11=1868/3721,
9-10=186B/3721
WEBS 3-17=0/257, 3-16=789/520, 4-16=157/629,
4-14=-491/1011, 5.14=-426/432,
6-14=136/137, 6-13=0/359, 6-11=1029/479,
7-11=-477/1171, 8-11=818/542, 8-10=0/259
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; VuB=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=46ft; eave=6ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
3-0-7, Interior (1) 3-D-7 to 12-10.0, Exterior(2R) 12-10-0
to 194-1, Interior (1) 19-4-1 to 33-2-0, Exterior(2R)
33-2-0 to 39-7-4, Interior (1) 39-74 to 46-0-0 zone;C-C
for members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
-chord live load nonconcurrent-with any other live loads.
6) ' This truss has been designed for a live load of 20.Dpsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will rit between the bottom
chord and any other members, with BCDL = 10.Opsf.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 1010 lb uplift -at
joint 9 and 1155 lb uplift at joint 2.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin'Velez PE 90.68182
MITekUSA, Ine FUCert.6634 .
896d;Parke East Blvd. Tampa FL 3300
Date:
August 2,2021
®WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 51192020 BEFORE USE.
Design valid for use only with MTeklb connectors. This design Is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the building designer must verily the applicability of design parameters and property incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TP/1 quality Criteria, DSB-89 and SCSI Building Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
2792357
A-16
Hip
1
1
T24871892
Jo b Reference o tional
Builders.FirstSource (rampa, FL), Tampa, FL- 33564,
Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 3012:47:19 Page: 1
ID _X1 bUlcxDcOn_vy2veypkWz4784-RfC7PsB7OHg3NSgPgnL8w3uITXbGKV*CDoi7J4zJC7f
-1-6-0 5-8-4 10-10-0 16-11-0 23-0-0 29-1-0 35-2-0 40-3-12 46-0-0
1-6-0 5-8 4 5-1-12 6-1-0 6-1-0 6-1-0 6-1-0 5-1-12 5-8-4
5x6=
17 4
3x6= 5x6= 3x6= 5x6=
525 26 627 287 29 8
4x6=
2x4n 4x8= 6XB= 4x4= 4x4= -6x8= 4x8= 2x4a 4x6-
5-8-4 10-11-12 18-11-5 27-0-11 35-0-4 40-3-12 46-0-0
5-8-4 5-3-8 7-11-9 IB-1-5 7-11-9 5-3-8 5-8 4
Scale = 1:80.8
Plate Offsets (X, Y):
[2:0-1-4,0-0-5],[4:0-3-0,0-2-0],[6:0-3-0,0-3-G],[8:0-3-0,0-2-0],[10:0-1-4,0-0-5]
Loading
(psi)
Spacing
2-0-0
CSI
DEFL
in
(loc)
Udefl
Lid
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0:61
Vert(LL)
0.50
14-15
>999
240
MT20- 2441190
TCDL-
10.0
Lumber DOL
1.25
BC
0-.76
Vert(CT)
-0.71
14-15
>780
180
BCLL
0.0'
Rep Stress Incr
YES
-WB
-0A8
Horz(CT)
0.18
10
n/a
n/a
BCDL
10.0
Code
FBC2020/rP12014
Matrix -AS
Weight: 280 lb FT = 20%
LUMBER
TOP CHORD
2x4 SP No.2
BOT CHORD
2x6 SP No.2
WEBS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied.
BOT CHORD
Rigid ceiling directly applied_
WEBS
1 Row at midpt 5-17. 7-12
REACTIONS
(lb/size) 2=193310-8-0, 10=1836/
Mechanical
Max Horiz 2=264 (LC 11)
Max Uplift 2=-1154 (LC 12), 10=1009 (LC 12)
Max Grav 2=2205 (LC 20). 10=2111 (LC 21)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/42, 2-3=-4212/2259, 3-4=3629/2024,
4-5=3245/1911, 5-7=4192/2434,
7-8=3238/1915, 8-9=3622/2045,
9-10=-4207/2275
BOT CHORD
2-18=1931/3890, 17-18=-1931/389D,
15-17=2005/4128, 14-15=2169/4356,
12-14=2038/4009, 11-12=191213697,
10-11=-1912/3697
WEBS
3-18=0/220, 3-17=671/466, 4-17=571/1286,
5-17=1239/679, 6-15=88/540,
6-15=284/228, 6-14=-286/218,
7-14=79/543, 7-12=-1244/676,
8-12=577/1284, 9-12=-660/471, 9-11=0/211
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vult=163mph (3-secondgust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=251t;
B=45ft; L=46ft; eave=6ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
3-0-7, Interior (1) 3-0-7 to 10-10-0, Extedor(2R) 10-10-0
to 17-4-1, Interior (1) 17-4-1 to 35-2-0, Exterior(2R)
35-2-0 to 41-8-1, Interior (1) 41-8-1 to 45-11-4 zone;C-C
for members and forces & MWFRS-for reactions shown;
Lumber-DOL=1.60 plate grip DOL=1.60
3) Building -Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of -this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed fora 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-0&00 tall by 2-OG-00 wide will fitIietween the bottom
chord and any other members, with BCDL = 10.Opsf.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 1009 lb uplift at
joint 10 and 1154 Ib.uplift at joint 2..
9) This truss design requires that a rrrinimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
JoaquiitVelez PE No.681$2
Mirk USA, Ine. FL.Cert6634 .
StIDaParire EaM BIvd, Tampa FL 33610
Date:
August 2,2021
A WARNING - Verity design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 51192020 BEFORE USE.
Design valid for use only with Mrrek® connectors. This design is based only upon parameters shown, and Is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly Incorporate this design Into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSVTP/f Quality Criteria, DSB-89 and BCS/ Building Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
City
Ply
T24871893
2792357
A17
Half Hip
1
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 Mlrek Industries, Inc. Fri Jul-30 12:47:20 Page: 1
ID: DhoBBWOOmuO tyEg8M8HopPz5M3A-RfC9PsB7OHg3N Sg PgnL8w3uITXbG KWrCD oi7J4zJC7f
-1-6-0 5-8-15 8-10-0 16-2-8 23-7-0 30-11811 38-4-0 46-0-0
1-6-0 5-8-15 3-1-1 7-4-8 7-4-8 7-4-8 7-4-8 7-8
-0
5x6- 3x6= 5x6= 5x6= 3x6= 3x4-
4 21 22 5 23 6 7 —24 -8 25 9
4x6= 4x8= 6x8= 4x4= 4x4= 6x8= 44=
8-11-12 18-0-10 27-3-4 36-5-14 46-0-0
8-11-12 9-0-14 9-2-10 9-2-10 9-6-2
Scale = 1:82.6
Plate Offsets (X, Y):
[4:0-4-0,0-2-8], [6:0-3-0,0-3-4], [7:0-3-0,0-3.0], [9:Edge,0-1-8], [10:Edge,0-4-8]
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc)
Vdefl
Ud
PLATES GRIP
TCLL-(roof)
20.0
Plate Grip DOL
1.25
TC
0.76
Vert(LL)
0.66
13-14
-:?,837
240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.82
Vert(CT)_
-0.83
13-14
-:%63
180
BCLL
0.0'
Rep Stress Incr
YES
WB
0.99
Horz(CT)
0.19
10
n/a
n/a
BCDL
10.0
Code
FBC2020ITP12014
Matrix -AS
-Weight: 272 Ib FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x6 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied,
except end verticals.
BOT CHORD Rigid ceiling directly applied.
WEBS 1 Row at midpt 5-16, 7-11
WEBS- 2 Rows at 1/3 pts 8-10
REACTIONS (lb/size) 2=1930/D-8-0, 10=1833/
Mechanical
Max Hbriz 2=362 (LC 12)
Max Uplift 2=-1138 (LC 12), 10=1021 (LC 12)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=-3635/2148, 3-4=3423/2030,
4-5=3065/1888, 5-8=-4597/2694,
8-9=52/36, 9-10=204/228
BOT CHORD 2-16=2131/3211, 14-16=2691/4422,
13-14=2850/4808, 11-13=2474/4229,
10-11=1575/2684
WEBS 3-16=-302/348, 4-16=-607/121 1,
5-16=1657/939, 5-14=117/464,
6-14=-353/360, 6-13=-328/360,
7-13=225/572, 7-11=-1403/931,
8-11=-482/1151, 8-10=3048/1781
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=46ft; eave=6ft; Cat. 11; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
3-D-7, Interior (1) 3-0-7 to 8-10-0, Extedor(2R) 8-10-0 to
15-4-1, Interior (1) 15-4-1 to 45-10-4 zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain -loading -
requirements speck to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load-nonconcurrent with any other -live loads.
6) • This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
chord and any other members.
7) Refer to girder(s) for truss to truss connections.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 1021 lb uplift at
joint 10 and 1138 lb uplift at joint 2.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Josquin.Velez PE No.6082
MIT& USA,:Ihc. FL CertA634
' 6904 Parke EastBlvd.Tampa. FL 33610
bate_:
August 2,2021
®WARNING -Verily design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 6/1912020 BEFORE USE.
Design valid for use only with MiTek® connectors. This design Is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek"
I always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI?P/1 Quaky Criteria, DSB-89 and SCSI Building Component
6904 Parke East Blvd.
Satetykr/ormadon available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Ply
2792357
C1
Jack -Open T12
1
T24871894
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 16 2021 Print- 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 3012:47:20 Page: 1
I D:QFskPU36FBRwTrBmGS4xpz5Nyy-RfC?PsB70Hg3NSgPgnL8W3uITXbGKWrCDo17J4zJC?f
-1-6-0 0-11-4
1-6-0 0-11-4
12
6 r
ST1.5x8 STP
3
2
T o�
1 S S _ 4
3x4 -
0-11=4-
Scale =1:21
Plate Offsets (X, Y): [2:Edge,0-0.4]
Loading
(psf)
Spacing 2-0-0
CSI
DEFL in
(loc) Udefl Ud
PLATES -GRIP
TCLL (roof)
20.0
Plate Grip DOL 1.25
TC 0.38
Vert(LL) 0.00
-7 >999 240
MT20 244/190
TCDL
10.0
Lumber DOL 1.25
BC 0.07
Vert(CT) 0.00
7 >999 180
BCLL
0.0'
Rep Stress Incr YES
WB 0:00
Horz(CIT 0.00
4 n/a n/a
-BCDL
10.0
Code FBC2020/TPI2014
Matrix -MP
Weight: 6 lb FT = 20%
LUMBER
6) Provide mechanical connection (by others) of truss to
TOP CHORD
2x4 SP No.2
bearing plate capable of withstanding 297 lb uplift at
BOT CHORD
2x4 SP No.2
joint 2, 30 lb uplift at joint 4-and 13 lb uplift at joint-3.
BRACING
LOAD CASE(S) Standard
TOP CHORD
Structural wood sheathing directly applied or
0-11-4 oc purlins.
BOT CHORD
Rigid ceiling directly applied or 10-0-0 cc
bracing.
REACTIONS
(lb/size) 2=210/0-8-0, 3=131 Mechanical,
4=30/ Mechanical
Max Holtz 2=106 (LC 12)
Max Uplift 2=-297 (LC 12), 3=13 (LC 1),
4=30 (LC t)
Max Grav 2=210 (LC 1), 3=41 (LC 12). 4=77
(LC 12)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=171/64
BOT CHORD 2-4=70/190
NOTES
1) Wind: ASCE 7-16; VuB=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf,, BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E) zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
2) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
3) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
4) • This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
Chord and any other members.
5) Refer to girder(s) for truss to truss connections.
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Wez:PE No.68182
MNUSA, Inc FL:Cert.6634
62 ,p arh Eaat Blyd. Tampa FL.33910'
)ate;
August 2,2021
A WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 51192020 BEFORE USE.'°
Design valid for use only with Mrrek® connectors. This design Is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verity the applicability of design parameters and properly Incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing We[(
always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSk7Pf1 Quality Crlteda, DSB-89 and BCSI Building Component 6904 Parke East Blvd.
Safely Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 206011 Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
12792357
T24671895
MID
Jack -Open
P
4
Job Reference o tional
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 16 2021 Print B.430 S Jul-16 2021 MiTek Industries, Inc. Fri Jul 30 12:47:22 Page: 1
I D:QFskPU35FBRvvTrBmGS4xpz5Nyy-RtC?PsB7OHg3NSgPgnLBw3ulTXbGKWrCDoi7J4z1C?f
-1-6-0 0-11-4
1-6-0 0-11-4
12
6 j—
ST1.5x8 STP
3
2
or
rn o
u
1 6 4
3x4 =
Scale = 1:21
0-11-4
Plate Offsets (X, Y): {2:Edge,0-0-4]
Loading (psf)
Spacing_
2-0-0
CSI
DEFL
in-
(loc)
Udefl
Ud
PLATES GRIP
TCLL (roof) 20.0
Plate Grip DOL
1.25
TC
0.38
Vert(LL)
0.00
7
>999
240
NLT20 244/190
TCDL 10.0
Lumber DOL
1.25
BC
0.07
Vert(CT)
0.0D
7
>999
180
BCLL 0.0
-Rep Stress Incr
YES
WB
0.00
Horz(CT)
0.00
4
n/a
n/a
BCDL 10.0
Code
FBC2020/rP12014
Matrix -MP
Weight: 6 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or
0-11-4 oc pudins.
BOT CHORD Rigid ceiling directly applied or 10.0-0 oc
bracing.
REACTIONS (lb/size) 2=210/0-8-0, 3=13/ Mechanical,
4=30/ Mechanical
Max Horiz 2=106 (LC 12)
Max Uplift 2=297 (LC 12). 3=13 (LC 1),
4=30 (LC 1)
Max Grav 2=210 (LC 1), 3=41 (LC 12), 4=77
(LC 12)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=-171/64
BOT CHORD 2-4=70/190
NOTES
1) Wind: ASCE 7-16; VuR=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
8=45ft; L=24ft; eave=4ft; Cat. Il; Exp C; Enclosed;
MWFRS (directional) and C-C Extedor(2E) zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
2) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
3) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
4) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
chord and any other members.
5) Refer to girder(s) for truss to truss connections.
6) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 297 lb uplift at
joint 2, 30 lb uplift at joint 4 and 13 lb uplift at joint 3.
LOAD CASE(S) Standard
This item teas been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE No.68782
MIT& USA, lihm FL:Cert 0634
8%4;Parke Eas( Blyd. Tampa FL, 23 00
Date:
August 2,2021
®WARNING -Verity design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 6/19/2020 BEFORE USE.
°
Design valid for use only with Mrrek® connectors. This design Is based only upon parameters shown, and Is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design into the overall
building design. Bracing Indicated Is to prevent buckling of Individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek°
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSVrP11 Quallty Criteria, DSB-99 and BCSI Building Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Sulle 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Oty
Ply
2792357
C3
Jack -Open
12
1
T2487189s
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33564,
m
m
N LE
Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MTek Industries, Inc. Fri Jul 30 12:47:22 Page: 1
ID:QFskPU36FBRvvTrBmGS4xpz5Nyy-RfC?PsB70Hg3NSgPgnLBw3ulTXbGKWrCDoi7J4zJC?f
-1-6-0 1 2-11-4
1-6-0 1 2-11-4
3x4 =
12
6r
3
c�
2-11-4
'
Scats = 1:22.1
Plate Offsets (X, Y): [2:0-1-4.0-0-2]
Loading
(psf)
Spacing 2-0-0
CSI
DEFL in (loc) Vdefl L/d
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL 1.25
TC
0.39
Vert(LL) -0.01—4---7 >999 240
MT20 244/190
TCDL
10.0
Lumber DOL 1.25
BC
0.14
Vert(CT) -0.01 4-7 >999 180
BCLL
0.0'
Rep Stress Incr YES
WB
O.OQ
Horz(CT) 0.00
3 n/a n/a
BCDL
10.0
Code FBC2020/TPI2014
Matrix -MP
Weight: 12 lb FT = 20%
LUMBER
6) Provide mechanical connection (by others) of truss to
TOP CHORD
2x4 SP No.2
bearing plate capable of withstanding 59 lb uplift at joint
BOT CHORD
2x4 SP No.2
3 and 225 lb uplift at joint 2.
BRACING
LOAD CASE(S) Standard
TOP CHORD
Structural wood sheathing directly applied or
2-11-4 cc pudins.
BOT CHORD
Rigid -ceiling directly applied or 10-0-0 cc
bracing.
REACTIONS
(lb/size) 2=234/0-6-0, 3=62/ Mechanical,
4=27/ Mechanical
Max Horiz 2=169 (LC 12)
Max Uplift 2=225_(LC 12), 3=59 (LC 12)
Max Grav 2=234 (LC. 1). 3=69 (LC 17), 4=48
{iC 3)
FORCES
(Ib) - Maximum Compression/Maximum
Tension -
TOP CHORD 1-2=0/42, 2-3=252/77
BOT CHORD 2-4=-47/181
NOTES
1) Wind: ASCE 7-16; Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
1-5-3, Interior (1) 1-5.3 to 2-10-8 zone;C-C for members
and forces & MWFRS for reactions shown; Lumber
DOL=1.60 plate grip DOL=1.60
2) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
3) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
4) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
chord and any other members.
5) Refer to girder(s) for truss to truss connections.
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
,Joaquinvelez PE No.9a192
MTTek USA, IneFLfCert6634
6904jparke EastBdd. Tarnpa:FL,33910
'bate.:
August 2,2021
® WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/1M020 BEFORE USE.
Design valid for use only with MTek® connectors. This design Is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly Incorporate this design into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrica8on, storage, delivery, erection and bracing oftrusses and truss systems, see ANSU/P/1 OuaW Criteria, DSB-89 and BCS/ Building Component
6904 Parke East Blvd.
Satetylnformadon available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T24871897
2792357
C5
Jack -Open
12
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33564, Run: 8.43 S Jul 16 2021 Print 0.430 S Jul 16 2021 MTek Industries, Inc. Fri Jul 3012:47:22 Page: 1
I D:uSQBcg4kOVZmXcQNKzzITOz5Nyx-RfC7PsB7OHg3NSg Pqn L8w3ulTXbGKWrCDol7J4zJC7f
-1-6-0 4-11-4
1-6-0 4-11-4
3x4 -
I 4-11-4 I
Scale = 1:23.9
Plate -Offsets (X, Y): [2:0.14,D-0-2)
Loading (psJ-
Spacing
2-0_0
CSI
DEFL
in
(loc)
Vdeft
Ud
PLATES GRIP
TCLL (roof) 20.0
Plate Grip DOL
1.25
TC
0.57
Vert(LL)
0.06
4-7
>914
240
MT20 244/190
TCDL 10.0
Lumber DOL
1.25
BC
0.45
Vert(CT)
-0.07
4-7
>842
180
BCLL 0.0'
Rep Stress Incr
YES -
WB
0.00
Horz(CT)
0.00
3
n/a
n/a
BCDL 10.0
Code
FBC2020frP12014
Matrix -AS
Weight: 18lb FT=20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 2=304/0-8-0, 3=123/ Mechanical,
4=561 Mechanical
Max Hodz 2=233 (LC 12)
Max Uplift 2=234 (LC 12). 3=130 (LC 12)
Max Grav 2=304 (LC 1), 3=133 (LC 17), 4=87
(LC 3)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=-293/87
BOT CHORD 2-4=39/177
NOTES
1) Wind: ASCE 7-16; Vuft=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=oft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
1-5-3, Interior (1) 1-5-3 to 4-10-8 zone;C-C for members
and forces & MWFRS for reactions shown; Lumber
DOL=1.60 plate grip DOL=1.60
2) Building Designer/ Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
3) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
4) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
chord and any other members.
5) Refer to girder(s) for truss to truss connections.
6) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 130 lb uplift at
joint 3 and 234 lb uplift at joint 2.
7) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
Chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin;Velez PE 46:681i62
Mrr USA,.fnc. FL:Cert 8634
SOD4 Parke East Blvd. Tampa FL 339,10
-Date:
August 2,2021
® WARNING - Vedfy design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 51192020 BEFORE USE.
Design valid for use only with MTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the building designer must vedfythe applicability of design parameters and property incorporate this design into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPH Quality Criteria, DS049 and SCSI Building Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610-
Job
Truss
Truss Type
Qty
Ply
12792357
T24871898
D01
Hip Girder
1
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, 'Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 3012:47:23 Page: 1
ID:KB56wzYAiu1BOEAdcNOr9z5M2z-RfC7PsB7OHg3NSgPgnL8w3ul7XbGKWrCDoi7J4zJC7f
I-1-6-0 1 7-0-0 1 9-11-12 1 15-4-4 I 18-4-0 I 25-4-0 126-10-01
1-6-0 7-0-0 2-11-12 5 4-8 2-11-12 7-0-0 1-6-0
4x6= 3x4= 3x4= 4x6=
3 17 4 18 19 20 5 21 6
4x4= 8x8- 3x4= 4x4=
4x6 =
4x6-
I 7-1-12 1 12-8-0 1 18-2-4 1 25-4-0 I
7-1-12 5-6-4 5-6-4 7-1-12
Scale = 1:50.7
Plate Offsets -(X,-Y):
[2:0-1-8,0-0-1),[7:0-1-8,0-0-1)
Loading
(psf)
Spacing
2-0.0
CSI
DEFL
in
(loc)
Ildefl -1Jd
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.93
Vert(LL)
0.27
10
>999 -240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
1.00
Vert(CT)
-0.32
10-12.
>950 -180
BCLL
0.0'
Rep Stress Incr
NO
WB
0.51
Harz(CT)
011
7
n/a n/a
BCDL
10.0
Code
FBC2020/rP12014
Matrix-MSH
Weight: 138 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP M 31 'Except' 3-6:2x4 SP No.1
BOT CHORD 2x6 SP No.2
WEBS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied or
1-9-13 oc puffins.
BOT CHORD
Rigid ceiling directly applied or 4-9-7 oc
bracing.
REACTIONS
(lb/size) 2=2103/0-8-0.7=2105/0-8-0
Max Horiz 2=160 (LC 6)
Max Uplift 2=1344 (LC 8), 7=1344 (LC 8)
Max Grav 2=2180 (LC 13), 7=2182 (LC 14)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/42, 2-3=-4211/2382, 3-4=-3776/2237,
4-5=-4469/2581, 5-6=3777/2236,
6-7=-4212/2381, 7-8=0/42
BOT CHORD
2-12=1908/3794, 10-12=2354/4430,
9-10=-2354/4387, 7-9=-1907/3701-
WEBS
3-12=-625/1456, 6-9=624/1457,
4-12=1016/718,4-10=0/290,5-10=0/288,
5-9=1 DW719
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vuh=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=25ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional); Lumber DOL=1.60 plate grip
DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
Chord and any other members.
7) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 1344 lb uplift at
joint 2 and 1344 lb uplift at joint 7.
8) Hanger(s) or other connection device(s) shall be
provided sufficient to support concentrated load(s) 275
lb down and 275 lb up at 7-0-0, 203 lb down and 168 lb
up at 9-0-12, 104 lb down and 168 lb up at 11-0-12,
184 Ib down and 168 lb up at 12-8-0, 184 lb down and
168 Ib up at 14-3-4, and 203 lb down and 168 lb up at
16-3-4, and 275 lb down and 275 lb up at 18-4-0 on top
chord, and 420 lb down and 133 lb up at-7-0-0, 831b
down at 9-D-12, 83 lb down at 1140-12, 83 lb down at
12-8-0, 83 lb down at 14-3-4, and 83 lb down at 16-3-4.
and 420 lb down and 133 lb up at 18-3-4 on bottom
chord. The designtselection of such connection device
(s) is the responsibility of others.
9) In the LOAD CASE(S) section, loads applied to the face
of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Roof Live (balancedr Lumber Increase=1.25,
Plate Increase=1.25
Uniform Loads (lb/ft)
Vert: 1-3=60, 3-6=60, 6-8-60, 2-7=20
Concentrated Loads (lb)
Vert: 3=184 (F), 6=184 (F), 11=60 (F), 12=346
(F), 9=346 (F), 10=60 (F), 17=127 (F), 18=127
(F), 19=127 (F), 20=127 (F), 21 =1 27 (F), 22=60
(F), 23=60 (F), 24=60 (F)
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquirtmeiez PE 146.68132
MiTek USA,.Inc.:FLiCerC:6634
' 696d Parke East Blvd, Tampa FL.33610
'Date:
August 2,2021
® WARNING -Verity design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/192020 BEFORE USE.
Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly Incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSVTP/1 Dualffy Criteria, DSB-89 and SCSI Building Component
6904 Parke East Blvd.
Sarefylnformation available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T24871899
2792357
D02
Hip
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564,
Scale = 1:48.8
Run: 8.43S Jul 16 2021 Print 8.430 S Jul 16 2021 Mrrek Industries, Inc. Fri Jul 30 12:47:23 Page: 1
I D:GmdaeDyREgs8eiwO FadMM pz5M3k-RfC?PsB70Hg3NSgPgn L8w3ulTXbGKWrCDoi7J4zJC?f
I-1-6-0 1 6-3-5 I 9-0-0 1 16-4-0 1 19-0-11 1 25-4-0 1
1-6-0 6-3-5 2-8-11 7-4-0 2-8-11 6-3-5 1
4x6 =
19 20 2122
4x8 =
3x8= 3x6- 3x4=
STP
3x4 =
1 9-1-12 1 16-2-4 I 25-4-0 1
9-1-12 7-0-8 - 9-1-12
Plate Offsets (X, Y): [5:0-5-4,0-2-0], [7:0-0-12,Edge] -
Loading (psf)
Spacing
2-0-0
CSI
DEFL
in
(loc)
VdefI
Ud
PLATES GRIP
TCLL (roof) 20.0
Plate Grip DOL
1.25
TC
0.65
Vert(L'L)
0.17
8-13
>999
240
MT20 244/190
TCDL 10.0
Lumber DOL
1.25
BC
0.74
Vert(CT)
-0.35
B-13
>857
180
BCLL 0.0'
Rep Stress Incr
YES
- WB
0.17
Horz(CT)
0.06
7
n/a
n/a
BCDL 10.0
Code
FBC2020/TPI2014
Matrix -AS
Weight: 118 lb FT = 20%
LUMBER
TOP CHORD
2x4 SP No.2
BOT CHORD
2x4 SP No.2
WEBS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied.
BOT CHORD
Rigid ceiling directly applied.
WEBS
1 Row at midpt 5-10
REACTIONS
(lb/size) 2=111010-8-0, 7=101O/0-8-0
Max Horiz 2=194 (LC 11)
Max Uplift 2=702 (LC 12), 7=553 (LC 12)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/42, 2-3=-1740/1124, 3-4=-1526/1042,
4-5=1341/989, 5-6=1535/1050,
6-7=1753/1127
BOT CHORD
2-10=-895/1513, 8-10=674/1347, .
7-8=888/1529
WEBS
3-10=-303/320, 4-10=141/430,
5-10=141/141, 5-8=163/435, 6-8=317/333
NOTES
1) Unbalanced roof live loads have been considered for
this -design.
2) Wind: ASCE 7-16; Vuft=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=25ft; eave=oft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Extedor(2E)-1-6-13 to
1-5-3, Interior (1) 1-5-3 to 9-0-0, Exterior(2R) 9-0-0 to
13-2-15, Interior (1) 13-2-15 to 16-4-0, Exterior(2R)
16-4-0 to 20-6-15, Interior (1) 20.6-15 to 25-4-0 zone;C-
C for members and forces & MWFRS for reactions
shown; Lumber DOL=1.60 plate grip DOL=1.60
3) Building Designer/ Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10:0 psf bottom
chord live load nonconcurrent with any other live loads.
6) • This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
7) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 553 lb uplift at
joint 7 and 702 lb uplift at joint 2.
8) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic Copies.
.Joaquin Velez PE No.68182
MiTek usA,.lpc;fL Cert9634
69D4Parke East Blvd, Tampa FL 33610
.,bate:
August 2,2021
® WARNING - Veriy design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/192020 BEFORE USE.
Design valid for use only with Mrrek® connectors. This design Is based only upon parameters shown, and Is for an Individual building component, not
��°
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSUIP/1 Quality Criteria, DSB-89 and BCS/ Building Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T248719oD
2792357
D03
Hip
1
1
Job Reference (optional)
Builders First5ource (Tampa, FL), Tampa, FL - 33564, Run: 6.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 3012:47:24 Page: 1
ID:kyByrYz3787GsVPoIBbvlz5M3j-RfC4PsB70Hg3NSgPgnL8w3uITXbGKWrCDoi7J4zJC7f
•1-6-0 1 7-2-3 1 11-0-0 1 14-4-0 1 18-1-13 1 25-4-0
1-6-0 7-2-3 3-9-13 3 4-0 3-9- 33 7-2-3
4x8= 4x4=
4 21 5
3TP
7
2x4 at 3x6 - 3x4 = 3x8 = 2x4 a
3x4 - 3x4 =
7-2-3 1 11-1-12 14-2-4 18-1-13 25-4-0
7=2-3 3-11-9 3-0-8 3-11-9 7-2-3
Scale = 1:48.9
Plate Offsets (X, Y): [4:0-5.4,0 2-0]
Loading (psf)
Spacing
2-0-0
CSI
DEFL
in
(IOC)
Vdefl
Lid
PLATES= GRIP
TCLL (roof) 20.0
Plate Grip DOL
1.25
TC
0.55
Vert(LL)
0.16
8-15
>999
240
MT20 244/190-
TCDL 10.0
Lumber DOL
1.25—
BC
0.62
Vert(CT)
-020
8-15
>999
180
BCLL 0.0•
Rep Stress Incr
YES
WB
0.31
Horz(CT)
0.06
.7
—n/a
-n/a
BCDL 10.0
Code
FBC2020/rP12014
Matrix -AS
-Weight: 132 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 2=1110/13-8-0, 7=1010/0-8-0
Max Horiz 2=231 (LC 11)
Max Uplift 2702 (LC 12). 7=553 (LC 12)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=1761/1079, 3-4=1330/960,
4-5=-1135/897, 5-6=13341961,
6-7=1756/1088
BOT CHORD 2-12=843/1503, 10-12=843/1503,
9-10=537/1133, 8-9=835/1518,
7-8=835/1518
WEBS 3-12=0/260, 3-10=554/424, 4-10=243/413,
4-9=1191123. 5-9=260/403, 6-9=-570/443,
6-8=0/262
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=25ft; eave=4ft; Cat. 11; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
1-5-3, Interior (1) 1-5-3 to 11-0-0, Exterior(2E) 11-0-0 to
14-4-0, Exterior(2R) 14-4-0 to 18-6-15, Interior (1)
18-6-15 to 25-4-0 zone;C-C for members and forces &
MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
chord and any other members.
7) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 553 lb uplift at
joint 7 and702 lb uplift at joint 2.
8) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed -by Velez, Joaquin, PE
using a -Digital Signature.
Printed -copies of this
document are not considered
signed and sealed and the
signature must be verified
on any -electronic copies.
Joaquin:ye)ez PE No.68182
MiTek USA. Inc. FlLcort 8634
6904,Parke.Ee9t Bvd. Tampa FL 33910
Date:
August 2,2021
®WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE 10II-7473 rev. 5/192020 BEFORE USE.
Design valid for use only with MTek® connectors. This design Is based only upon parameters shown, and Is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSIITP11 Quality Made, DSB-89 and BCSI Building Component
6904 Parke East Blvd.
Safety information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20501
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T24871901
2792357
D04
Common
2
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33554, Run: 8.43 S Jul 15 2021 Print 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 3012:4726 Page: 1
I D: oa3CQtxpTXkHOYLOht67pez5M31-RtC?Ps B7OHg3NSgPgnL8w3u ITXbGKWrC Doi7J4zJ C?f
-1-6-0 6-7-4 12-8-0 18-8-12 25-4-0
1-6-0 6-7-4 6-0-12 6-0-12 6-7-4
4x6 =
iTP
6
3x4 - 3x6- 3x4 =
4x4= 4x4=
8-7-8
16-8-8
1
25-4-0
8-7-8
8-1-0
8-7-8
Scale = 1:49.8
Plate Offsets (X, Y):
[6:0-1-4,Edge]'
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc)
Vdefl
Lid
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.55
-Vert(LL)
0.16
7-12
>999
240
MT20 244/190
TCDL
10.0 -
Lumber DOL
1.25
BC
0.82
Vert(CT)
-0.30
7-12
>999
180
BCLL
0.0'
Rep Stress Incr
YES
WB
0.44
Horz(CT)
0.06
6
n/a
n/a
BCDL
10.0
Code
FBC2020rrP12014
-Matrix-AS
Weight: 115 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 2=1110/0-8-0, 6=1010/0-8-0
Max Horiz 2=261 (LC 11)
Max Uplift 2=702 (LC 12). 6=553 (LC 12)
Max Grav 2=1220 (LC 17). 6=1134 (LC 18)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=1922/1187, 3-4=1767/1160,
4-5=1775/1188, 5-6=193211214
BOT CHORD 2-9=959/1835, 7-9=-493/1167,
6-7=-956/1698
WEBS 4-7=399/835, 5-7=436/498, 4-9=378/818,
3-9=-427/490
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16, Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=25ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
1-5-3, Interior (1)1-5-3 to 12-8-0, Exterior(2R)12-8-0 to
15-8-0, Interior (1) 15-8-0 to 25-4-0 zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
4) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
5) • This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas when: a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members, with BCDL=10.0psf.
6) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 553 lb uplift at
joint 6 and 702 lb uplift at joint 2.
7) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE 96.68182
Wait USA, Inc. FL:Cert:6634
' 6904; Parke East Blvd, Tampa FL 33610
Date:
August 2,2021
®WARNING -verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE 101II-7473 rev. 5/192020 BEFORE USE.
Design valid for use only with MITek® connectors. This design is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of Individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/lP11 Quality Criteria, DSB-89 and SCSI Building Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
tyPiyT2487192792357
D05
Common Girder
1
I-Q
3
Job Reference o tional
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MITek Industries, Inc. Fri Jul 3012:47:27 Page: 1
ID:s7XjidXYxavKO4bR3fUclxz5M3_ RfC7PsB70Hg3NSgPgnL8w3ulTXbGKWrCDoi7J4zJC1f
-1-6-0 4-8-3 8-4-2 12-8-0 16-11114 20-7-13 25-4-0
1-6-0 4-8-3 3-8-0 4-3-14 4-3-4 3-8-0 4-8-3
4x6 u
3TP
5x8 = 5x8 =
8x10 = 10x12 = Bx10 =
8x10 WB -
Scale = 1:52
6-11-0
6-11-0
12-8-0
5-9-0
18-5-0
5-9-0
25-4-0
6-11-0
Plate Offsets (X, 1):[2:0-2-4,0-D-1],[8:0-2=4,0-D-1),[9:0-4-12,D-5-12),[11:0-6-0,0-6-4],[12:0-4-12,0-5-12]
Loading
(psf)
-Spacing
2-0-0
CSI
DEFL
in (loc)
Well
Ud
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC 0.99_
Vert(LL)
0.38 11-12
>797
240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC 0.63
Vert(CT)
-0.46 11-12
>658
180
BCLL
0.0'
Rep Stress Incr
NO
1NB 1.00
Horz(CT)
0.10 8
n/a
n/a
BCDL
10.0
Code
FBC2020/TPI2014
Matrix-MSH
Weight: 505 Ib FT = 20%
LUMBER
TOP CHORD
2x4 SP No.2
BOT CHORD
2x8 SP 240OF 2.0E
WEBS
2x4 SP No.3 *Except* 11-5:2x4 SP No.2
OTHERS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied.
BOT CHORD
Rigid ceiling directly applied or 6-6-5 oc
bracing.
WEBS
1 Row atmidpt 5-11,B-11
REACTIONS
(lb/size) 2=8791/0-8-0, 8=1043710-8-0
Max Horiz 2=261 (LC 7)
Max Uplift 2=5148 (LC 8), B=5B68 (LC 8)
Max Grav 2=9418 (LC 13). 8=12144 (LC 14)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/42, 2-3=-20855/11188,
3-4=20744/11134, 4-5=-1494717784,
5-6=14943f7782, 6-7=21211/10507,
7-8=-21613/10607
BOTCHORD
2-12=9900/1 B768, 11-12=8646/16731,
9-11=8281/16836, 8-9=-9419/19178
WEBS
4-12=3343/5815, 3-12=1401291,
4-11=-4582/2780,5-11=-6701/13065,
6-11=4886/2281, 6-9=2714/6314,
7-9=-390/319
NOTES
1) 3-ply truss to be connected together with 10d
(0.131 "xW) nails as follows:
Top chords connected as follows: 2x4 - 1 row at 0-4-0
oc.
Bottom chords connected as follows: 2x8 - 4 rows
staggered at 0-4-0 oc.
Web connected as follows: 2x4 - 1 row at 1-0-0 oc.
2) All loads are considered equally applied to all plies,
except If noted as front (F) or back (B) face in the LOAD
CASE(S) section. Ply to ply connections have been
provided to distribute only loads noted as (F) or (B),
unless otherwise Indicated.
3) Unbalancedroof live loads have been considered for
-this design.
4) Wind: ASIDE 7-16; Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.20sf; BCDL=6.Opsf; h=25ft;
B=45ft; L=25ft; eave=4ft; Cat. 11; Exp C; Enclosed;
MWFRS (directional); Lumber DOL=1.60 plate grip
DOL=1.60
5) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
6) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
7) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 5868 lb uplift at
joint 8 and 5148 lb uplift at joint 2.
9) Hanger(s) or other connection device(s) shall be
provided sufficient to support concentrated load(s) 400B
lb down and 2360 lb up at 7-1-8, 1813 lb down and
1033 lb up at 9-0-12, 2107 lb down and 1040 lb up at
11-D-12, 2160 lb down and 1022 lb up at 13-0-12, 2163
lb down and 1022 lb up at 15-D-12, 1553 lb down and
668 lb up at 17-0-12, 1503 lb down and 656 lb up at
19-0-12, 1488 lb down and 653 lb up at 21-0-12, and
1488 lb down and 653 lb up at 23-0-12, and 1489 lb
down and 652 lb up at 24-6-0 on bottom chord. The
design/selection of such connection device(s) is the
responsibility of others.
10) Overhang applied to ply: 3(Back)
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25,
Plate Increase=1.25
Uniform Loads (Ib/ft)
Vert: 1-5=60, 5.8=60, 2-8=20
Concentrated Loads (1b)
Vert: 12=3913 (B), 17=-1813 (B), 18=1813 (B),
19=1818 (B), 20=1818 (B), 21=1219 (B), 22=1184
(B), 23=1176 (B), 24=1176 (B), 25=1178 (B)
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE No.68182
MiTek USA, Ine. FL:Ce.t.6834
' 8804 Parke East Blvd. Tampa. FL,33610
Date:
August 2,2021
® WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 511912020 BEFORE USE.
Design valid for use only with MTekO connectors. This design is based. only upon parameters shown, and Is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design Into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing MiTek°
Is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI?P/f Quardy Criteria, DSB-89 and SCSI Building Component 6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601 Tampa, FL 36610
Job
Truss
Truss Type
ty
Ply
IQ
T24B71903
2792357
E3P
Jack -Open
3
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564.
r
m
N
Scale = 1:21.9
REE
Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 30 12:47:27 Page: 1
I D:ymnlRHNt7GJNrUPKIchyWz5M3J-RfC?Ps B70Hg3NSgPgnL8w3ulTXbGKWrCDoi7J4zJC?f
-1-6-0 1 3-0-0
1-6-0 1 3-0-0
3x4 -
12
6 [—
3-0-0
3
Plate Offsets (X, Y):
[2:0-0-4,Edge]
Loading
(psi)
Spacing
2-0-0
CSI
DEFL
in
(loc)
Udefl Lid
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.38
Vert(LL)
0.02
4-7
>999- 240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.23
Vert(CT)
0.02
4-7
>999 180
BCLL
0.0•
Rep Stress Incr
YES
WB
0.00
Horz(CT)
0:00
3
n/a n/a
BCDL
10.0
Code
FBC20201rP12014
Matrix -MP
Weight: 12 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or
3-0-0 oc purlins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 cc
Bracing.
REACTIONS (lb/size) 2=23610-3.0, 3=64/ Mechanical,
4=281 Mechanical
Max Horiz 2=171 (LC 12)
Max Uplift 2=-291 (LC 12), 3=73 (LC 12),
4=47 (LC 9)
Max Grav 2=236 (LC 1), 3=64 (LC 1). 4=50
(LC 3)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=151/108
BOT CHORD 2-4=62/114
NOTES
1) Wind: ASCE 7-16; Vuft=163mph (3-second gust)
Vesd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
1-5-3, Interior (1) 1-5-3 to 2-11-4 zone; porch left
exposed;C-C for members and forces & MWFRS for
reactions shown; Lumber DOL=1.60 plate grip
DOL=1.60
2) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
3) This truss has been designed for a 10.0 psf bottom
Chord live load nonconcurrent with any other live loads.
4) • This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
chord and any other members.
5) Refer to girder(s) for truss to truss connections.
6) Provide mechanical connection (by others) of truss to
bearing plate at joint(s) 2.
7) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 73 lb uplift at joint
3, 291 lb uplift at joint 2 and 47 Ib uplift at joint 4.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin;Velez PE No.68182
MITBk USA,.Ih; :. f 1. Cert 8834
6904; Parke East Blvd. Tampa. FL 33610
Date:
August 2,2021
®WARNING -verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/19/2020 BEFORE USE. °
Design valid for use only with Mlrek® connectors. This design Is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design Into the overall p
building design. Bracing indicated Is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing iVliTek°
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANS11TP/f Quality Criteria, DSB-89 and SCSI Building Component 6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601 Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
2792357
E7
Jack -Open
�52
1
T24871904
Job Reference (optional)
Builders FirstSource (ramps, FL), Tampa, FL - 33564,
ui
v
Scale = 1:27.7
IE
Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021' MiTek Industries, Inc. Fri Jul 30 12:47:28 Page: 1
I D: uSQ6cg4kOVZmXcQNKzzJTOz5Nyx-RfC?PsB7OH g3NSg PgnL8w3ulTXbGK WrCDo17J4zJC9f
-1-6-0 7-0-0
1-6-0 7-0-0
4x4 -
7-0-0
Plate Offsets (X, Y): [2:D-1-4,Edge]
Loading (psf)
Spacing
2-0-0
CSI
DEFL
in
(loc)
I/deft
L/d
PLATES GRIP
TCLL (root) 20.0
Plate Grip DOL
1.25
TC
0.90
Vert(LL)
0.20
4-7
>411
240
MT20 244/190
TCDL 10.0
Lumber DOL
1.25
BC
0.79
Vert(CT)
-0.23
4-7
>361
180
BCL-L 0.0'
Rep Stress Incr
YES
WB
0.00
Horz(CT)
-0.01
3
n/a
n/a
BCDL 10.0
Code
FBC20201rP12014
Matrix -AS
Weight: 25 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.1
BOT CHORD 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 2=382/0-8-0, 3=187/ Mechanical,
4=801 Mechanical
Max Horiz 2=300 (LC 12)
Max Uplift 2=-254 (LC 12), 3=200 (LC 12)
Max Grav 2=382 (LC 1), 3=201 (LC 20),
4=123 (LC 3)
FORCES (Ib) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=341/116
BOT CHORD 2-4=-95/212
NOTES
1) Wind: ASCE 7-16; VuR=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. 11; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
1-5-3, Interior (1) 1-5-3 to 6-11-4 zone;C-C for members
and forces & MWFRS for reactions shown; Lumber
DOL=1.60 plate grip DOL=1.60
2) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
3) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
4) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3.06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
5) Refer to girder(s) for truss to truss connections.
6) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 200 lb uplift at
joint 3 and 254 lb uplift at joint 2.
7) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 112" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered -
signed and sealed and the
signature must be verified
on any electronic copies.
,Joaquin Velez PE N6.68382
MiTek USA, Inc:;FLCort8634 .
6904 Parke;EastBlvd. Tampa FL.33610
Date:
August 2,2021
® WARNING - Verity design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 51192020 BEFORE USE.
Design valid for use only with MITek® connectors. This design Is based only upon parameters shown, and Is for an Individual building component not
a truss system. Before use, the building designer must verify the applicability of design parameters and property incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
Mew
always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSLITP/f Quality Criteria, DS949 and SCSI Building Component
6904 Parke East Blvd.
SaIWInrormadon available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 3661D
Job
Truss
Truss Type
Qty
Ply
T24871905
2792357
G01
Hip Girder
1
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 3012:47:28 Page: 1
ID:s?XjidX-YxavK04bR3fUclxz5M3_ RfC?PsB7OHg3NSgPgnL8w3u[TXbGKWrCDoi7J4zJC?f
1 -1-6-0 1 7-0-0 1 10-5-0 1 'NO-0
20-10-0 122-4-0 1
1-6-0 7-0-0 3-5-0 3-5-0 7-0-0 1 1-6-0 1
4x4 -
4x8 = 2x4 a 4x8 =
18 19 4 20 21 5
2x4 n 3x8 =- 2x4 n
US =
1 7-1-12 I 10-5-0 1 13-8-4 1 20-10-0
7-1-12 3-3-4 3-3-4- 7-1-12
4x4 -
Scale = 1:43.8
Plate Offsets (X, 1):
[3:0-5-4,0-2-0],[5:0-5-4,0-2-0]
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc)
Vdefl
Lid
PLATES GRIP
TCLL (root)
20.0
Plate Grip DOL
1.25
TC
0.99
Vert(LL)
0.18
9
>999
240
MT2(7 244/190
TCDL
10:0
Lumber DOL
1.25
-BC
0.94
Vert(CT)
-0.22
B-17
>999
180
BCLL
0.0`
Rep Stress Incr
NO
WB
0.23
Horz(CT)
0b9
6
n/a
We
BCDL
10.0
Code
FBC2020/TPI2014
Matrix-MSH
Weight: 98 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.1 'Except' 3-5:2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceiling directly applied or 4-8-4 oc
bracing.
REACTIONS (lb/size) 2=1737/0-B-0, 6=1737/0-8-0
Max Hortz 2=159 (LC 6)
Max Uplift 2=4126 (LC 8), 6=1126 (LC 8)
Max Grav 2=1802 (LC 13), 6=1802 (LC 14)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=3289/1858, 3-4=3214/1936,
4-5=-3214/1936, 5-6=-3289/1858, 6-7=0/42
BOT CHORD 2-11=1445/2959, 9-11=1448/2984,
8-9=1448/2902, 6-8=1445/2877
WEBS 3-11=93/612, 3-9=342/523, 4-9=512/550,
5-9=342/524, 5-8=93/612
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; VuR=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. 11; Exp C; Enclosed;
MWFRS (directional); Lumber DOL=1.60 plate grip
DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
chord and any other members.
7) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 1126 lb uplift -at
joint 2 and 1126 lb uplift at joint 6.
8) Hanger(s) or other connection device(s) shall be
provided sufficient to support concentrated load(s) 275
lb down and 275 lb up at 7-0-0, 203 lb down and 168 lb
up at 9-D-12, 195 lb down and 158 lb up at 1D-5-0, and
203 lb down and 168 lb up at 11-9-4, and 275 lb down
and 275 lb up at 13-10-0 on top chord, and 420 lb down
and 133 lb up at 7-0-0, 83 lb down at 9-D-12, 83 lb
down at 10-5-0, and 83 lb down at 11-9-4, and 420 lb
down and 133 lb up at 13-9-4 on bottom chord. The
design/selection of such connection device(s) is the
responsibility of others.
9) In the LOAD CASE(S) section, loads applied to the face
of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25,
Plate Increase=1.25
Uniform Loads (Ib/ft)
Vert: 1-3=60, 3-5=60, 5-7=60, 12-15=20
Concentrated Loads (lb)
Vert: 3=184 (B), 5=184 (B), 11=-346 (B), 9=-60 (B),
4=127 (B), 8=346 (B), 18=127 (B), 21=127 (B),
22=-60 (B), 23=60 (B)
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE No.68182
MITek'USA, Inc. FL:Cert:8934 .
69H,Parke East Blvd Tampa.FL, 33610
Date:
August 2,2021
® WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5119/2020 BEFORE USE.
Design valid for use only with MTek® connectors. This design is based only upon parameters shown, and Is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly Incorporate this design into the overall
building design. Bracing indicated is to buckling of Individual truss web and/or chord members only. Add@lonal temporary and permanent bracing
MiTek'
prevent
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSYTPlf Quality Criteria, DSB-89 and SCSI Building Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
12792357
T248719os
G02
Hip
1
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 30 12:47:29 Page: 1
I D:oa3CQtxpTXkHOYLOht67pcz5M31-RfC4PsB7OHg3NSgPgnL8w3ulTXbG KWrCDoi7J4zJC7f
1-6-0 6 3-5 9-0-0 11-10-0 14-6-11 20-10-0 22-4-0
1-6-0 6-3-5 2-8-11 2-10-0 2-8-11 6-3-5 1-6-0
2�
4x4= 4x4=
4 20 21 5
o
m v
12
6&
19r
2x
L
r?
-
2x4
6
a
22
h
C13
Ca
18
2
23
7
0 1
'
11 10 9
. 8
'
3x4= 4x6=
4x4=
4x4=
3x4 =
9-1-12
11-8-4
20-10-0
9-1-12
2-6-8
9-1-12
Scale = 1:47.2
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc)
Vdefl Ud
PLATES
GRIP
TCLL (roof)
20.0
Plate Grip-DOL
1.25
TC
0.48
Vert(LL)
-0.19
9-17
>999 240
MT20
244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.74
Vert(CT)
-0.37
9-17
>673 180
BCLL
0.0'
Rep Stresslncr
YES
WB
0.17
Horz(CT)
0.04
7
n/a rile
BCDL
10.0
Code
FBC2020/TPI2014
Matrix -AS
Weight: 95 lb
FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 2=927/0-8-0.7=927/0-8-0
Max Horiz 2=196 (LC 10)
Max Uplift 2=598 (LC 12), 7=598 (LC 12)
Max Grav 2=1026 (LC 17), 7=1026 (LC 18)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=1465/930, 3-4=1259/818,
4-5=1086/767, 5-6=1259/818,
6-7=1465/930, 7-8=0/42
BOT CHORD 2-11=640/1405, 9-11=392/1138,
7-9=675/1290
WEBS 3-11=-411/421, 4-11=229/495, 5-9=229/496,
6-9=-412/421
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; VuR=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Dpsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
1-5-3, Interior (1) 1-5-3 to 9-0-0, Extedor(2E) 9-D-0 to
11-10-0, Exterior(2R) 11-10-0 to 16-0-15, Interior (1)
16-0-15 to 22-4-13 zone;C-C for members and forces &
MWFRS for reactions shown; Lumber DOL=1.60 plate
grip DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) ' This truss has been -designed for a live load of 20.Opsf
on -the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members, with BCDL = I O.Opsf.
7) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 598 lb uplift at
joint 2 and 598 lb uplift at joint 7.
8) This truss design requires that a minimum of 7116"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to -
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE No.68132
Mi r6k:USA, inr;FL Cert 8634
69b4Perke,Ead B.twd. Tampa FL, 33610
Date.
August 2,2021
®WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/19/2020 BEFORE USE.
Design valid for use only with MTek® connectors. This design is based only upon parameters shown, and Is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSYTP11 Quality Criteria, DSB49 and SCSI Building Component
6904 Parke East Blvd.
Safety information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Oty
Ply
Tzae71so7
2792357
G03
Common
3
1
Job Reference (optional)
Builders FlrstSource (Tampa, FL), Tampa, FL - 33564,
Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 3012:47:30 Page: 1
ID:kyByrYz3787GsVPol8bvlz5M3j-RfC7PsB70Hg3NSgPgnL8w3ulTXbGKWrCDoi7J4zJC7f
1 -1-6-0 1 5-1-6 1 10-5-0 1 15-8-10 _ 1 20-10-0 1 22-4-0 1
1-6-0 5-1-6 5-3-16 5-3-10 5-1-6
4x6 =
A
3x4= 3x6- 3x4=
3x4 =
7
3x4 =
1 7-0-2 1 13-9-15 1 _ 20-10-0 1
7-0-2 6-9=13 7-0-2
Scale = 1:44.5
Plate Offsets (X, Y): [2:0-1-4,0-0-2]
Loading (psf)
Spacing
2-041
CSI
DEFL
in
(loc)
11dell
Ud
PLATES GRIP
TCLL (roof) 20.0
Plate Grip DOL
1.25
TC
0.43
Vert(LL)
0.08
B-10
>999
240
-MT20 244/190
TCDL 10.0
LumberDOL
1.25
BC
0.49
-Vert(CT)
-0.12
10-13
>999
180
BCLL 0.0'
Rep Stress Incr
YES
WB
0.24
Horz(CT)
'0-.03
6
n/a
n/a
BCDL 10.0
Code
FBC20201TPI2014
Matrix -AS
Weight: 98 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 2=927/0-8-0, 6=927/0-8-0
Max Hodz 2=-221 (LC 10)
Max Uplift 2-598 (LC 12), 6=598 (LC 12)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=-1443/1080, 3-4=1275/1014,
4-5=1275/1014, 5-6=1443/1DBO, 6-7=0/42
BOT CHORD 2-10=774/1270, 8-10=370/826,
6-8=811/1260
WEBS 4-8=318/488, 5-8=337/436, 4-10=318/488,
3-10=337/436
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vuh=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=oft; Cat. 11; Exp C; Enclosed;
MWFRS (directional) and C-C Extedor(2E)-1-6-13 to
1-5-3, Interior (1) 1-5-3 to 1 D-5-0, Exterior(2R) 1D-5-0 to
13-5-0, Interior (1) 13-5-0 to 22-4-13 zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
5) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
chord and any other members.
6) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 598 lb uplift at
joint 2 and 598 lb uplift at joint 6.
7) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Jpaquin.Veiez PE No.68132
MIT& USA, (nc. FL Cert 6634
604; Padre East Blvd. Tampa FL 33610
Date:
August 2,2021
®WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev, 5/19/2020 BEFORE USE.
Design valid for use only with Meek® connectors. This design Is based only upon parameters shown, and Is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property incorporate this design Into the overall
building design. Bracing indicated is to prevent buckling of Individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSYnell Quality Crit ria, DSB-69 and BCSI Building Component
6904 Parke East Blvd.
Safetylnformation available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T24871909
2792357
G04
Common
3
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16.2021 MTek Industries, Inc. Fri Jul 30 12:47:30 Page: 1
I D:oa3CQlxpTXkH OYLOhtB7pez5M31-RfC7 PsB7OHg3NSg PgnL8w3ulTXbGKWrCDoi7J4zJC7f
1-6-0 5-1-6 10-5-0 15-8-10 20-10-0
1-6-0 5-1-6 5-3-10 5-3-10 5-1-6
vi
ch
C3 1
3x4 =
Scale = 1:44.5
4x6-
3x4= 3x6= 3x4=
7-0-2 13-9-14 20-10-0
7-0-2 6-9-13 7-0-2
3x4 -
Plate Offsets (X, Y):
[2:Edge,0-0-4], [6:Edge,0-0-4]
Loading
(psf)
Spacing
2-0-0-
CSI=
DEFL
in
(loc)
Vdefl
Ud
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.45
Vert(LL)
0.08
7-12
>999
240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.50
-Vert(CT)
-0.13
7-12
>999
180
BCLL
O.V
Rep Stress Incr
YES
WB
0.26
Horz(CT)
0.04
6
n/a
n/a
BCDL
10.0
Code
FBC2020/rP12014
Matrix -AS
Weight: 95 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 2=931/0-8-0, 6=830/0-8-0
Max Horiz 2=218 (LC 11)
Max Uplift 2=-604 (LC 12), 6=-452 (LC 12)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=1451/1103, 3-4=1283/1036,
4-5=-1296/1065,5-6=-1467/1131
BOT CHORD 2-9=-894/1266, 7-9=-453/833, 6-7=903/1285
WEBS 4-7=-341/505, 5-7=348/451, 4-9=314/488,
3-9=337/438
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vuft=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
1-5-3, Interior (1) 1-5-3 to 10-5-0, Extedor(2R) 10-5-0 to
13-5-0, Interior (1) 13-5-0 to 20-10-0 zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
5) • This truss has been designed for a live load of 20.0psf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will id between the bottom
chord and any other members.
6) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 452 lb uplift at
joint 6 and 604 lb uplift at joint 2.
7) This truss design requires that a minimum of 7116"
structural wood sheathing be applied directly to the top
Chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Josquin'Velez PE No.68182
MiTek'USA, floc. FL` Gert 6834
' 8904'Parke East Blvd. Tampa FL 33610
Date;
August 2,2021
®WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/192020 BEFORE USE.
'
Design valid for use only with MTek® connectors. This design is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
Me[(
always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSVnP11 Quality Crireda, DSB49 and SCSI Building Component
6904 Parke East Blvd.
Sefetylydorrnatfon available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T24871909
2792357
G05
Roof Special
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33564,
Run: 8.43 S Jul 16 2021 Print 0.430 S Jul 16 2021 M7ek Industries, Inc. Fri Jul 30 12:47:31 Page: 1
ID:laeltmF6LWOb8YKOCKaDt5z5M3L-RfC7PsB7OHg3NSgPgnL8w3uITXbGKWrCDoi7J4z1C7f
I -1-670 1 5-5-12 1 10-5-0 1 12-7-8 I 14-7-8 1 20-6-0 20j1Q-0
1-6-0 5-5-12 4-11-4 2-2-8 2-0-0 5-10-9 0-4-0
4x6 =
4
12
6f
2x4
21
5
2x4 u
22 7x8-
cn rn
m
6
3
6
-4
7 23
7x10
n
20
9 10
0
8
r7
`F=
2
12
o 1
•
•
•
13
2x4 n 2x4
n 7x10
=
3x4 =
3x10=
4x12 =
4x4=
4x6
1
6-7-14
1
12-9-4
1 14-9-4 1.
16-9-4 1
20-6-0
I
6-7-14-
6-1-6
2-0-0
2-0-0
3-8-13
Scale = 1:45.5
Plate Offsets (X, Y): [6:0-4-0,0-3-4], [7:0:5-12,Edge], IB:0-3-15,0-2-1]
Loading
(psi)
Spacing
2-0-0
CSI
DEFL
in (loc)
Udefl Ltd
PLATES
GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.69
Vert(LL)
-0.43 9
>573 240
MT20
244/190
TCDL
10:0
Lumber DQL
1_25
BC
0.91
Vert(CT)
--0.56 9
>440 180
BCLL
0.0 •
Rep Stress Incr
YES
WB
0.37
Horz(CT)
0.35 8
n/a nta
BCDL
10.0
Code
FBC20201TP12014
Matrix -AS
Weight: 119 lb
FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2 *Except* 6-8:2x6 SP M 26
BOT CHORD 2x4 SP No.2 `Except' 12-5:2x4 SP No.3,
11-7:2x4 SP M 31, 7-9:2x6 SP No.2
WEBS 2x4 SP No.3
WEDGE Right: 2x6 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 2=918/0-8-0, 8=819/0-8-0
Max Horiz 2=217 (LC 11)
Max Uplift 2=-597 (LC 12). 8=-444 (LC 12)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=-140911062, 3-4=1314/1115,
4-5=1613/1331, 5-7=2220/1622,
7-8=-6721511
BOT CHORD 2-13=-853/1223, 12-13=-28/102,
11-12=0/110, 5-11=30/93,
10-11=-1453/2233, 7-10=-144512230,
7-9=219/335, 8-9=297/400
WEBS 3-13=-326/444,4-13=-267/327,
11-13=-5151893,4-11=-676/948,
6.10=-33/154, 6-11=10051768
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; VuR=163mph (3-second gust)
Vesd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. 11; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
1-5-3, Interior (1) 1-5-3 to 10-5-0, Exterior(2R) 10-5-0 to
13-5-0, Interior (1) 13-5-0 to 20-6-0 zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
4) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
5) • This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06.00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
6) Bearing at joint(s) 8 considers parallel to grain value
using ANSI/rPI 1 angle to grain formula. Building
designer should verify capacity of bearing surface.
7) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 597 Ib uplift at
joint 2 and 444 lb uplift at joint 8.
8) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin 'Velsz PE 66.6816P
MiTefi USA, Ire. FL:COL6634 .
8904 Parke EesFBivd, Tampa.FL 33610
"Date:
August 2,2021
A WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 51192020 BEFORE USE.'°
Design valid for use only with MITek® connectors. This design Is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of Individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing oftrusses and truss systems, see ANSI?P/1 Quality Criteria, DSB-89 and BCS/Building Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T24871910
2792357
G06
Common Girder
1
.3
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33564, Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 3012:47:32 Page: 1
ID:OpzLVH WWAHnTnwOFVyzNmkz5M34-RfC9PsB7OHg3NSgPgnL8WJulTXbGKWrCDoi7J4zJC?f
c
Scale = 1:46.6
a7
0 1
-1-6-0 5-5-12 1 10-5-0 15-4-4 20-10-0
1-6-0 5-5-12 4-11-4 4-11-4 5-5-12
4x6 a
5x8 = 5x8 =
3x8 a
10x12 = 3x8 u
8xl o =
1 5-5-12 1 10-5-0 1 15-4-4 1 20-10-0 1
5-5-12 4-11-4 4-11-4 5-5-12
Plate Offsets (X, l):[2:0-4-0,0-1-15),-[6:0-4-0,0-1-15],[7:0-5-4,0-1-8),[9:0-6-0,0-6-4),[10:0-5-4,0-1-8)
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc) Udefl
Ud
PLATES GRIP
TCLL-(roof)
20.0
Plate Grip DOL
1.25
TC 0.75
Vert(LL)
0.27
9-10 >940
240
MT20 244/190
TCDL
10.0 _
Lumber DOL
1.25
BC 0.53
Vert(CT)
-0.32
9-10 - >780
180
SCLL
0.0'
Rep Stress Incr
NO
WB 0.80
Horz(CT)
0.07
6 n/a
n/a
BCDL
10.0
Code
FBC2020rrP12014
Matrix-MSH
Weight: 387 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x6 SP 240OF 2.0E
WEBS 2x4 SP ND.3 *Except* 9-4:2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or
2-0-14 cc purlins.
BOT CHORD Rigid ceiling directly applied or 7-1-11 oc
bracing.
WEBS 1 Row at midpt 5-9
REACTIONS (lb/size) 2=6841/0-8-0, 6=9120/0-8-0
Max Horiz 2=218 (LC 7)
Max Uplift 2=4031 (LC 8), 6=51311 (LC 8)
Max Grav 2=7198 (LC 13), 6=10477 (LC 14)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=-16204/8859,
3-4=-12636/6775, 4-5=12654/6779,
5-6=18012/9062
BOT CHORD 2-10=7810/14569, 9-10=-7810/14569,
7-9=8009/16057, 6-7=-8009/16057
WEBS 4-9=-5772/10978,5-9=-5511/2504,
5-7=1899/4648, 3-9=-3696/2278,
3-10= 1757/3118
NOTES
1) 3-ply truss to be connected together with 1 Od
(0.131"x3") nails as follows:
Top chords connected as follows: 2x4 - 1 row at 0-4-0
oc.
Bottom chords connected as follows: 2x8 - 4 rows
staggered at 0-4-0 DO.
Web connected as follows: 2x4 - 1 row at 1-0-0 oc.
2) All loads are considered equally applied to all plies,
except if noted as front (F) or back (B) face in the LOAD
CASE(S) section. Ply to ply connections have been
provided to distribute only loads noted as (F) or (B),
unless otherwise indicated.
3) Unbalanced roof live loads have -been considered for
this design.
4) Wind: ASCE 7-16; Vuft=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.0psf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional); Lumber DOL=1.60 plate grip
DOL=1.60
5) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
6) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
7) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 5131 lb uplift at
joint 6 and 4031 lb uplift at joint 2.
9) Hanger(s) or other connection device(s) shall be
provided sufficient to support concentrated load(s) 4008
lb down and 2360 lb up at 7-1-8, 1813 lb down and
1033 lb up at 8-10-12, 2106 lb down and 1021 lb up at
10-10-12, 2160 lb down and 1022 lb up at 12-10-12,
1516 lb down and 664 lb up at 14-1D-12, 1562 lb down
and 676 lb up at 16-1G-12, and 1562 lb down and 678
lb up at 18-10-12, and 1489 lb down and 652 lb up at
2D-0-0 on bottom chord. The design/selection of such
connection device(s) is the responsibility of others.
10) Overhang applied to ply: 1(Front)
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25,
Plate Increase=1.25
Uniform Loads (lb/ft)
Vert: 1-4=60, 4-6=60, 2-6=20
Concentrated Loads (Ib)
Vert: 15=3913 (F), 16=1813 (F), 17=1816 (F),
18=1818 (F), 19=1211 (F), 20=1226 (F), 21=1226
(F), 22=1178 (F)
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
-Joaquin Velez PE No.68182
Mi Nit USA, inc. FL:Cert6634 .
6804 Parke East Blvd. Tampa FL 33610
bate:
August 2,2021
®WARNING - verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 51IM020 BEFORE USE.
Design valid for use only with Mrfek® connectors. This design Is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property incorporate this design into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek"
is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/lP11 Qualify Criteria, DSB-89 and BCS/ Building Component
6904 Parke East Blvd.
Safefylnformation available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T24871911
2792357
1-15P
Diagonal Hip Girder
2
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 3012:47:33 Page: 1
ID:5T2iluRXp7vTRr vb Lk_Fz5M36-RfC?PsB7OHg3NSgPgnL6w3uITXbGKWrCDoi7J4zJC?f
I -2-2-3 I 4-2-3
2-2-3 4-2-3
3x4 -
Scale = 1:21.9
12
4.24 [—
4-2-3
Plate Offsets (X, Y): (2:0-0-9,Edge]
Loading (psf)
Spacing
2-0-0
CSI
DEFL
in-
(loc)-
Udefl
Lid
PLATES GRIP
TCLL (roof) 20.0
Plate Grip DOL
-1.25
TC
0.48
Vert(LL)
-0.07
4-7
>727
240
MT20 244/190
TCDL 10.0
Lumber-DOL
1.25
BC
0.46
Vert(CT)
-0.07
4-7
>758
180
BCLL 0.0'
Rep Stress Incr
NO
WB
0.00
Horz(CT)
0.00
2
n/a
n/a
BCDL 10.0
Code
FBC2020/TPI2014
Matrix -MP
Weight: 16 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
BRACING
TOP CHORD Structural wood sheathing directly applied or
4-2-3 oc puffins.
BOT CHORD Rigid ceiling directly applied or 10-0-0 oc
bracing.
REACTIONS (lb/size) 2=250/0-3-14, 3=69/ Mechanical,
4=16/ Mechanical
Max Horiz 2=171 (LC 22)
Max Uplift 2=-443 (LC 8), 3=94 (LC 8), 4-70
(LC 5)
Max Grav 2=316 (LC 13), 3=95 (LC 13), 4=47
(LC 3)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/45, 2-3=-449/231
BOT CHORD 2-4=227/398
NOTES
1) Wind: ASCE 7-16; Vuft=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h 25ft;
B=45ft; L=24ft; eave=oft; Cat. II; Exp C; Enclosed;
MWFRS (directional); porch left exposed; Lumber
DOL=1.60 plate grip DOL=1.60
2) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
3) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
4) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OG-00 wide will fit between the bottom
chord and any other members.
5) Refer to girder(s) for truss to truss connections.
6) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 94 lb uplift at joint
3, 443 lb uplift at joint 2 and 70 lb uplift at joint 4.
7) Hanger(s) or other connection device(s) shall be
provided sufficient to support concentrated load(s) 129
lb down and 97 lb up at 1-5-0, and 129 lb down and 97
lb up at 1-5.0 on top chord, and-128 lb down and 58 lb
up at 1-5.0, and 128 lb down and 58 lb up at 1-5-0 on
bottom -chord. The design/selection of such connection
device(s) is the responsibility of others.
8) In the LOAD CASE(S) section, loads applied to the face
of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25,
Plate Increase=1.25
Uniform Loads (Ib/ft)
Vert: 1-3=60, 4-5=20
Concentrated Loads (lb)
Vert: 8=61 (F=31, B=31), 9=68 (F=34, B=34)
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin;velezA 96.68182
MiTek USA, Inc:fL:CeR:8634
' 8904 Parke East Bvd. Tempe FL 3300
Date:
August 2,2021
® WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 6/19/2020 BEFORE USE.
Design valid for use only with MTek® connectors. This design is based only upon parameters shown, and Is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly Incorporate this design Into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing MOW
always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANS11TPl1 Quality Criteria, DSB-89 and BCSI Building Component 6904 Parke East Blvd.
Safetylnformation available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf. MD 20601 Tampa, FL 36610
Job
-Truss
Truss Type
Qty
Ply
2792357
H7
Diagonal Hip Girder
6
1
T24871912
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564,
Scale = 1:32.1
Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul.30 12:47:33 Page: 1
ID:uSOSeg4kOVZmXcQN Kzz1TOz5Nyx-RfC7 PsB7OHg3N Sg PgnL8w3u ITXbGKWrCDoi7J4zJC7f
1 -2-2-3 I 3-1-8 I 9-10-1 1
I 2-2-3 1 3-1-8 6-8-9
2x4 u 4x4 -
4x4 -
I 3 1 8 I 9-6-9 9�101-1
3-1-8 6-5-1 0-3-8
Loading
(psf)
Spacing
2-0-0
CSI•
DEFL
in
(loc)
Vdefl
L/d
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.75
Vert(LL)
-0.11
6-7
>999
240
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.90-
Vert(CT)
-0.25
6-7
>469
180
BCLL
0.0'
- Rep Stress Incr
NO
WB
0.32
Horz(CT)'
0.02
5
n/a
n/a
BCDL
10.0
Code
FBC2020frP12014
Matrix-MSH
Weight: 44 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.1
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3-
BRACING
TOP CHORD Structural wood sheathing directly applied or
5-1-7 oc pudins.
BOT CHORD Rigid ceiling directly applied or 6-10-11 oc
bracing.
WEBS 1 Row at midpt 3-6
REACTIONS (lb/size) 2=469/0-10-15, 4=210/ Mechanical,
5=2451 Mechanical
Max Horiz 2=299 (LC 8)
Max Uplift 2=451 (LC 8), 4=227 (LC 8),
5=87 (LC 8)
Max Grav 2=607 (LC 13), 4=210 (LC 1),
5=298 (LC 14)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/45, 2-3=1342/433, 3-4=211/59
BOT CHORD 2-7=626/1223, 6-7=-613/1237, 5-6=0/0
WEBS 3-7=0/277, 3-6=1255/622
NOTES
1) Wind: ASCE 7-16; Vult=183mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional); Lumber DOL=1.60 plate grip
DOL=1.60
2) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
3) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
4) ' This truss has been designed for a live load of 20.0psf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
5) Refer to girder(s) for truss to truss connections.
6) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 227 lb uplift at
joint 4,451 lb uplift at joint 2 and 67 lb uplift at joint 5.
7) Hanger(s) or other connection device(s) shall be
provided sufficient to support concentrated load(s) 129
lb down and 97 lb up at 1-5-0, 129 lb down and 97 lb up
at 1-5-0, 125 lb down and 12 lb up at 4-2-15, 125 lb
down and 12 lb up at 4-2-15, and 165 lb down and 84 lb
up at 7-0-14, and 165 Ib down and 84 lb up at 7-0-14
on top chord, and 65 lb down and 58 lb up at 1-5-0, 65
lb down and 58 lb up at 1-5-0, 22 lb down at 4-2-15, 22
lb down at 4-2-15, and 36 lb down at 7-0-14, and 36 lb
down at 7-0-14 on bottom chord. The design/selection
of such connection device(s) is the responsibility of
others.
8) In the -LOAD CASE(S) section, loads applied to the face
of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25,
Plate Increase=1.25
Uniform Loads (Iblft)
Vert: 1-4=60, 5-8=20
Concentrated Loads (lb)
Vert: 11=61 (F=31, B=31), 13=-77 (F=39, B=-39),
14=68 (F=34, B=34), 15=5 (F=2, B=2), 16=56
(F=28, B=-28)
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE No.68182
MiT&IJSA;,Inc. FL:Con 6834
88Qg Parke East B.Nd. Tampa FL 33610
"Date:
August 2,2021
® WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mil-7473 rev. 5/192020 BEFORE USE.
Design valid for use only with MITek® connectors. This design is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing MiTek•
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSVrPH Qualify Crfterla, DSB-89 and SCSI Building Component 6904 Parke East Blvd,
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601 Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T24871913
2792357
P01
Hip Girder
1
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8,43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 30 12:47:34 Page: 1
I D:DzKcmKbgl7XdVrTPrC4n??z5M2v-RfC?PsB70Hg3NSgPgnLBw3ulTXbGKWrCDoi7J4zJC?f
T----.
N
of
Scale = 1:27.8
1 -1-6-0 1 3-0-0 1 5-4-0 1 B-4-0_ -- 19-10-0 1
1-6-0 1 3-0-0_ 1 2-4-0 1 3-0-0 1-6-0
1-9-0
4x4 = 4x4 =
12
6-r- 3 15 4
2x4 a 2x4 u
2x4 -
2x4 =
1 3-1-12 I 5-2-4 1 8-4-0 1
3-1-12 2-0-8 1 3-1-12
Plate Offsets (X, Y):
[2:0-4-0,0-0-4], [5:0-4-0,0.0-4]
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc)
I/defl
L/d-
PLATES GRIP
TCLL (roof)
20.0
Plate -Grip DOL
1.25
TC
0.25
Vert(LL)
0.02
7-14
>999
240
MT20 244/190
TCDL
10.0
Lumber DOL
1.26
BC
0.15
Vert(CT)
0.02
7-14
>999
180
BCLL
0.0'
- Rep Stress Incr
NO
WB
0.05
Horz(CT)
-0.01
5
n/a
n/a
BCDL
10.0
Code
FBC2020/TPI2014
Matrix -MP
Weight: 35lb Fr = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied or
6-0-0 cc purlins.
BOT CHORD Rigid ceiling directly applied or 8-7-14 cc
bracing.
REACTIONS (lb/size) 2=450/0-3-0, 5=450/0-3-0
Max Horiz 2=85 (LC 6)
Max Uplift 2=-578 (LC 8). 5=578 (LC 8)
Max Grav 2=450 (LC 17), 5=450 (LC 18)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=514/619, 3-4=-431/580,
4-5=513/619, 5-6=0/42
BOT CHORD 2-8=-456/465, 7-8=-46B/469, 5-7=-458/463
WEBS 3-8=-121/121, 4-7=121/121
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vu@=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=oft; Cat. II; Exp C; Enclosed;
MWFRS (directional); porch left and right exposed;
Lumber DOL=1.60 plate grip DOL=1.60
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Provide adequate drainage to prevent water ponding.
5) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
6) ' This truss has been designed for a live load of 20.0psf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
7) Provide mechanical connection (by others) of truss to
bearing plate at joint(s) 2, 5.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 578 lb uplift at
joint 2 and 578 lb uplift at joint 5.
9) Hanger(s) or other connection device(s) shall be
provided sufficient to -support concentrated load(s) 192
lb down and 83 lb up at 3-0-0, and 46 lb down and 40 lb
up at 4-2-0, and 192-lb down and 83 lb up at 5-4-0 on
top chord, and 112 lb down and 28 lb up at 3-0-0, and
14 lb down and 14 lb up at 4-2-0, and 112 lb down and
28 lb up at 5-3-4 on bottom chord. The design/selection
of such connection device(s) is the responsibility of
others.
10) In the LOAD CASE(S) section, loads applied to the face
of the truss are noted as front (F) or back (B).
LOAD CASE(S) Standard
1) Dead + Roof Live (balanced): Lumber Increase=1.25,
Plate Increase=1.25
Uniform Loads (lb/ft)
Vert: 1-3=60, 3-4=60, 4-6=60, 9-12=-20
Concentrated Loads (lb)
Vert: 3=-5 (F), 4=-5 (F), 8=-11 (F), 7=-11 (F), 15=5
(F), 16=8 (F)
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin:Velez PE Nc.68182
Mi7ek usA :tnc:,FL Cert 8634 .
699b;Perke East Blvd. Tampa FL 33610
.'Oats:
August 2,2021
®WARNING -Verity design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE 14II-7473 rev. 5/192020 BEFORE USE.
Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not
�19
a truss system. Before use, the building designer must verify the applicability of design parameters and property incorporate this design Into the overall
building design. Bracing indicated Is to buckling of Individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTele
prevent
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing oftrusses and truss systems, see ANSI/TP11 Qualify Criteria, DSB-89 and BCSI Building Component
6904 Padre East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
2792357
P02
Common
2
1
T24871914
Job Reference (optional)
Builders FirstSource rrampa, FL), Tampa, FL - 33564,
U0
� N
M
Run: 8.43 S Jul 16 2021 Print: 0.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 30 12:47:34 Page: 1
ID:ymnl RHNt7GJNrUPldchyWz5M3J-RfC7PsB70Hg3NSgPgnL8x/3ulTXbGKWrCDoi7J4z1C?f
1 -1-6-0 i 4-2-0 1 8-4-0 1 9-10-0 1
I 1-6-0 I 4-2-0 1 4-2-0 1 1-6-0
3x4 =
12
BF
4x4 =
2x4 u
3x4 -
Scale = 1:27.2
4-2-0
4-2-0
8-4-0
4-2-0
Plate Offsets (X, Y):
12:0-0-8,Edge],[4:0-0.8,Edge]
Loading
(psf)
Spacing
2-0-0
CSI
-DEFL
-in
(loc) Udefl
L/d
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.64
Vert(LL)
0.07
6-12 >999
240
MT20 244/190
TCDL
10:0
Lumber DOL
1.25
BC
0.45
Vert(CT)
0.06
6-12 >999
180
-
BCLL
0.0 °
Rep Stress Incr
YES
WB
0.12
Harz(CT)
-0.01
4 n/a
n/a
BCDL
10.0
Code
FBC2020rrP12014
Matrix -AS
Weight: 34 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD -Rigid ceiling directly applied.
REACTIONS (lb/size) 2=427/0-3-0, 4=427/0-3-0
Max Horiz 2-106 (LC 10)
Max Uplift 2=-508 (LC 12), 4=508 (LC 12)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/42, 2-3=-409/1313, 3-4=-409/1297,
4-5=0/42
BOT CHORD 2-6=-898/318, 4-6=898/318
WEBS 3-6=733/189
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; VuR=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. ll; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E)-1-6-13 to
1-5-3, Interior (1) 1-5-3 to 4-2-0, Extedor(2R) 4-2-0 to
7-2-0, Interior (1) 7-2-0 to 9-10-13 zone; porch left and
right exposed;C-C for members and forces & MWFRS
for reactions shown; Lumber DOL=1.60 plate grip
DOL=1.60
3) Building Designer/ Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
4) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
5) • This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
chord and any other members.
6) Provide mechanical connection (by others)_ of truss to
bearing plate at joint(s) 2, 4.
7) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 508 lb uplift at
joint 2 and 508 lb uplift at joint 4.
8) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has-been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez F,E No.68182
MiTek USA, Inm FL Cart-8634
89U8 Parke Eas! Blvd. Tampa FL 339,10
Date:
August 2,2021
® WARNING -verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE 14II-7473 rev. 51192020 BEFORE USE.
Design valid for use only with Mrrek® connectors. This design is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design Into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing MiTek°
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing oftrusses and truss systems, see ANSVrP/f Quality Criteria, DSB-89 and SCSI Building Component 6904 Parke East Blvd.
Se"Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 213601 Tampa, FL 36610
Job
Truss
Truss Type
Llty
Ply
T24871915
2792357
PB01
Piggyback
1
Job Reference o tional
Builders FirstSource (rampa, FL), Tampa, FL - 33564,
N v
m
W
KE
Scale = 1:24.4
Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 Mi rek Industries, Inc. Fri Jul 3012:47:35 Page: 1
ID:huMZPsPeXCWuaOFKvrol Mdz5M39-RfC7PsB70Hg3NSgPgnL8w3ulTXbGKWrCDoi7J4zJC?f
0-10-13 2-8-3 1 6-8-3 9-4-6 1 10-3-3
0-10-13 2-8-3 4-0-0 2-8-3 0-10-13
2X4 =
12 3x6
6 [— -
2x4 u 3X6 -
2x4 u
9-4-6
2X4 =
Plate Offsets (X, Y): [3:0-3-0.,0-2-0], [5:0-3-0,0-2-0]
Loading (psf)
Spacing 2=0-0
CSI
DEFL in (loc) I/defl Ud
PLATES GRIP
TCLL (roof) 20.0
Plate Grip DOL 1.25
TC 0.18
Vert(LL) n/a n/a 999
MT20 244/190
TCDL 10.0
Lumber DOL 1.25
BC 0.19
Vert(CT) rile n/a 999
BCLL 0.0'
Rep Stress Incr YES
WB 0.08
Horz(CT) 0.00 13 n/a n/a
BCDL 10.0
Code FBC2020/TPI2014
Matrix -AS
Weight: 33 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD- 2x4 SP No.2
OTHERS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 2=275/9-4-6, 6=275/9-4-6,
8=271/9-4-6, 9=275/9-4-6,
13=275/9-4-6
Max Horiz 2=61 (LC 11), 9=61 (LC 11)
Max Uplift 2=207 (LC 12), 6=207 (LC 12),
8=153 (LC 9), 9=207 (LC 12),
13=-207 (LC 12)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/16, 2-3=-307/448, 3-4=299/460,
4-5=-299/460, 5-6=307/448, 6-7=0/16
BOT CHORD 2-8=264/245, 6-8=264/245
WEBS 4-8=-163/280
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Dpsf; h=25ft;
B=45ft; L=24ft; eave=oft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E) zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) Truss designed for wind loads in the plane of the truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consult qualified building designer as per ANSUTPI 1.
4) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
5) Provide adequate drainage to prevent water ponding.
6) Gable requires continuous bottom chord bearing.
7) Gable studs spaced at 6-0-0 oc.
8) This truss has been designed for a 10.0 psf bottom.
Chord live load nonconcurrent with any other live loads.
9) ' This truss has been designed for a live load of 20.0psf
on the bottom chord in all areas where a rectangle
3-0&00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
10) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 207 lb uplift at
joint 2, 207 lb uplift at joint 6, 153 lb -uplift at joint 8, 207
lb uplift at joint 2 and 207 Ib uplift at joint 6.
11) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
12) See Standard Industry Piggyback Truss Connection
Detail -for Connection to base truss as applicable, or
consult qualified building designer.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Vetaz PE No.68182
MiTek 1 jSA, lne.FL Cert6634 .
6004 Parke Eadt Blvd, Tampa FL 33610
.'bate:
August 2,2021
® WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 51192020 BEFORE USE.
Design valid for use only with Mrek® connectors. This design Is based only upon parameters shown, and Is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly Incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek°
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI?p/1 quality Criteria, DSB-89 and BCS/ Building Component
6904 Parke East Blvd.
Safety lydormadon available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
12792357
PB02
Piggyback
5
1
T24B7191s
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33564, Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MiTek Industries, Inc. Fd Jul 30 12:47:36 Page: 1
ID:huMZPsPeXCWuaOFKvrol Mdz5M3B-RfC?PsB70Hg3NSgPgnL.8w3uITXbGKWrCDoi7J4zJC9r
i 0-10-131
4-8-3 9-4-6 110-3-3 1
10-10-13 4-8-3 4-8-3 0-10-13
12
3x4 =
4x6 =
2x4 n
Scale = 1:28.7
'
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.35
Vert(LL)
TCDL
10.0
Lumber DOL
-1.25
BC
0.36
Vert(CT)
BCLL
0.0•
Rep Stress Incr
YES
WB
0.10
Horz(CT)
BCDL
10.0
Code
FBC2020/rP12014 -
--Matrix-AS
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
OTHERS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 2=223/9-4-6, 4=223/9-4-6.
6=374/9-4-6, 7=22319-4-6,
11=223/9-4-6
Max Horiz 2=97 (LC 10). 7=97 (LC 10)
Max Uplift 2=180 (LC 12), 4=180 (LC 12).
6=158 (LC 12), 7=180 (LC 12).
11=180 (LC 12)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/16, 2-3=127/237, 3-4=128/229,
4-5=0/16
BOT CHORD 2-6=79/86, 4-6=72/88
WEBS 3-6=221/341
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vuft=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E) D-4-3 to
3-4-3, Interior (1) 3-4-3 to 5-7-8, Extedor(2R) 5-7-8 to
8-7-8, Interior (1) 8-7-8 to 1D-10-13 zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) Truss designed for wind loads in the plane of the truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consult qualified building designer as per ANSI/rPI 1.
4) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
3x4 =
in (loc) I/deft Lld- PLATES —GRIP
n/a n/a 999 MT20- 244/190
n/a n/a 999
0.00 2 n/a n/a
5) Gable requires continuous bottom chord bearing.
6) Gable studs spaced at 6-D-0 oc.
7) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
8) • This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
9) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 180 lb uplift at
joint 2, 180 lb -uplift at joint 4, 158 lb uplift at joint 6, 180
lb uplift at joint 2 and 180 lb uplift at joint 4.
10) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
11) See Standard Industry Piggyback Truss Connection
Detail for Connection to base truss as applicable, or
consult qualified building designer.
LOAD CASE(S) Standard
Weight: 36 lb FT = 20%
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
-Joaquin Velez PE`N6.66762
'MiT& USA, Inc. FL`Cert.6634 .
69040arke East Blvd. Tarnpa:FL 33610
dates
August 2,2021
®WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 5/19/2020 BEFORE USE.
Design valid for use only with MITek® connectors. This design is based only upon parameters shown, and Is for an Individual building component, not
a truss system. Before use, the building designer must verity the applicability of design parameters and properly Incorporate this design Into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing We[(
always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSIMP/1 Quality Criteria, DSS-89 and SCSI Building Component 6904 Parke East Blvd.
Safietyinfonnadon available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601 Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
12792357
Tz4871917
PB03
Piggyback
9
1
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 MTek Industries, Inc. Fri Jul 30 12:47:37 Page: 1
ID:huMZPsPeXCWuaOFKvrol Mdz5M39-RfC?PsB7OHg3NSgPgnL8w3ulTXbGKWrCDoi7J4rJC?f
i0-10-131
3-7-7 1 5-8-15 9-4-6 1 10-3-3
0.10-13 3-7-7 1 2-1-8 3-7-7 0-10-13
2x4 -
2x4 u
3x6 =
3x6 =
1r-
6
3
4
5
2x4 it
9-4-6
Scale-= 1:28.8
2x4 =
Plate -Offsets (X, Y): [3:0.3-0,0.2-0], [5:0-3-0,0.2-0]
Loading (psf)
Spacing 2-0-0
CSI
DEFL in (loc) Udefl Ud
PLATES GRIP
TCLL_(roof) 20.0
Plate Grip DOL 1.25
TC 0.26
Vert(LL) n/a n/a 999
MT20 244/190
TCDL 10.0
Lumber DOL 1.25
BC 0.23
_Vert(CT)- n/a n/a 999
BCLL 0.0
Rep Stress Incr YES
WB 0.05
Horz(CT) 0.00 13 rile n/a
BCDL 10.0
Code FBC20201rP12014
Matrix -AS
Weight: 34 lb FT = 20%
LUMBER
TOP CHORD
2x4 SP No.2
BOT CHORD
2x4 SP No.2
OTHERS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied.
BOT=CHORD
Rigid -ceiling directly applied.
REACTIONS
(lb/size) 2=282/9-4-6, 6=282/9-4-6,
8=258/9-4-6, 9=28219-4-6,
13=282/9-4-6
Max Horiz 2=78 (LC 11). 9=78 (LC 11)
Max Uplift 2=-224 (LC 12), 6=224 (LC 12),
8=89 (LC 9), 9=224 (LC 12),
13=-224 (LC 12)
FORCES
(Ib) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=0/16, 2-3=292/4311 3-4=292/460,
4-5=292/460, 5-6=293/430, 6-7=0/16
BOT-CHORD 2-8=215/215, 6-8=215/215
WEBS 4-8=121/173
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
S=45ft; L=24ft; eave=oft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E) 0-4-3 to
3-4-3, Interior (1) 3-4-3 to 4-6-12, Exterior(2E) 4-6-12 to
10-1 D-13 zone;C-C for members and forces & MWFRS
for reactions shown; Lumber DOL=1.60 plate grip
DOL=1.60
3) Truss designed for wind loads in the plane of the truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consult qualified building designer as per ANSUTPI 1.
4) Building Designer / Project engineer responsible for
verifying applied roof live -load shown covers rain loading
requirements speck to the use of this truss component.
5) Provide adequate drainage to prevent water ponding.
6) Gable requires continuous bottom chord.bearing.
7) Gable studs spaced at 6-D-0 oc.
8) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
9) • This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
chord and any other members.
10) Provide mechanical -connection (by others) of truss to
bearing plate capable of withstanding 224 lb uplift at
joint 2, 224 lb uplift at joint 6, 89 lb uplift at joint 8, 224 lb
uplift at joint 2 and 224 lb uplift at joint 6.
11) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
12) See Standard Industry Piggyback Truss Connection
Detail for Connection to base truss as applicable, or
consult qualified building designer.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin:Velez PE N6.68182
MiTilk USA, jrre: FL Cert6634
' 690b; Parke,EEM Blvd. Tampa FL.33610
August 2,2021
®WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 5/19/2020 BEFORE USE.
Design valid for use only with MiTek® connectors. This design Is based only upon parameters shown, and Is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property incorporate this design into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek°
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSIITP/f Quality CrHede, DSB-89 and BCSI Building Component
6904 Parke East Blvd.
Saretylnformatlon available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 213601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
2792357
PB04
Piggyback
1
T24871916
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33564, Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 Mi rek Industries, Inc. Fri Jul 30 12:47:37 Page: 1
I D:rLHQH 17GaJPehasl9arRm2z5LRU-RfC?PsB70Hg3NSgPgnL8w3ulTXbGKWrCDoi7J4zJC?f
1-0-10-131 1-7-7 1 7-8-15 1 9-4-6 1 10-3-3 1
10-10-131 1-7-7 1 6-1-8 1 1-7-7 0-10-13
12
6r
3x6 = 2x4 it 3x6 =
3 16 4 17 5
8
2x4 - 2x4 it 2x4 -
Scale = 1:26.7
I
9-4-6
I
Plate Offsets (X, Y):
[3:0-3-0,0-2-0], [5:0-3-0,0.2-0]
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc) I/defl
Ud
PLATES GRIP
TCLL (root)
20.0
Plate Grip DOL
1.25
TC
0.22
Vert(LL)
file
- n/a
999
MT20- 244/190
TCDL
10.0
- Lumber DOL
1.25
BC
0.18
Vert(CT)
n/a
- n/a
999
BCLL
0.0'
Rep Stress Incr
YES
WB
0.12-
Horz(CT)
0.00
13 n/a
n/a
BCDL
10.0
Code
FBC20201TPI2014
Matrix -AS
Weight: 32Ib FT=-20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
OTHERS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 2=245/9-4-6, 6=245/9 4-6,
8=332/9-4-6, 9=245/9-4-6,
13=24519-4-6
Max Horiz 2=42 (LC 11), 9=42 (LC 11)
Max Uplift 2=177 (LC 12), 6=177 (LC 12),
8=239 (LC 8), 9=177 (LC 12),
13=177 (LC 12)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=0/16, 2-3=302/373, 3-4=290/354,
4-5=-290/354, 5-6=302/375, 6-7=0/16
BOT CHORD 2-8=222/260, 6-8=222/260
WEBS 4-8=-248/392
NOTES
1) Unbalanced roof live loads have been considered for
this design.
2) Wind: ASCE 7-16; Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Extedor(2E) 0-4-3 to
2-6-12, Exterior(21R) 2-6-12 to 6-9-11, Interior (1) 6-9-11
to B-8-4, Extedor(2E) 8-8-4 to 10-10-13 zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
3) Truss designed for wind loads in the plane of the truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consult qualified building designer as per ANSI/TPI 1.
4) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
5) Provide adequate drainage to prevent water ponding.
6) Gable requires continuous bottom chord bearing.
7) Gable studs spaced at B-0-0 oc.
8) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
9) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle .
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
10) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 177 lb uplift -at
joint 2, 177 lb uplift at joint 6, 239 lb uplift at joint 8, 177
Ib uplift at joint 2 and 177 lb -uplift at joint 6.
11) This truss design requires,that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
12) See Standard Industry Piggyback Truss Connection
Detail for Connection to base truss as applicable, or
consult qualified building designer.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin l/elaz PE Nc.68182
MiTek:USA,Ihm FL`Cert 6634
8984 Parke E iat Blvd. Tampa FL,33811t
Date;
August 2,2021
® WARNING -Verity design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 5/192020 BEFORE USE.
`
Design valid for use only with MITek® connectors. This design is based only upon parameters shown, and Is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly Incorporate this design Into the overall
building design. Bracing Indicated Is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
Mel(
always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSYTP/1 4uaW Criteria, DSB-89 and SCSI Building Component
6904 Parke East Blvd.
Sa►etylydannadon available from Truss Plate Institute, 2670 Crain Highway, Sufe 203 Waldorf, MD 20501
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T24871919
2792357
Vol
Valley
1
1
Job Reference (optional)
Builders FirstSource (Tampa, FQ, Tampa, FL - 33564,
Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 30 12:47:38 Page: 1
ID:rLHQH 17GaJPehasl9arRm2z5LRU•RfC?PsB70Hg3NSgPgnL8w3ulTXbGKWrCDoi7J4zJC?f
10-7-8
2x4 a
7 6 12 2x4n
3x4 o 2x4 a 2x4 n
10-7-8
Scale = 1:38.3
Loading
(psi)
Spacing
2-0-0
CSI
DEFL
in
(loc) Vdefl
Ud
PLATES GRIP
TCLL (roof)
20.0
-Plate Grip DOL
1.25
TC
0.25
Vert(LL)
n/a
n/a
999
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.15
Vert(TL)-
n/a
n/a
999
BCLL
0.0•
Rep Stress Incr
YES
WB
0.15
Hodz(TL)
0.00
5 n/a
n/a
BCDL
10.0
Code
FBC2020/rPi2014
Matrix -AS
Weight: 45 lb FT = 20%
LUMBER
TOP CHORD
2x4 SP No.2
BOT-CHORD
2x4 SP No.2
WEBS
2x4 SP No.3
OTHERS
2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied,
except end verticals.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 1=75/1D-7-8, 5=128/1D-7-8,
6=347/10-7-8, 7=288/10-7-8
Max -Holz 1=329 (LC 12)
Max Uplift 5=96 (LC 12). 6=263 (LC 12),
7=192 (LC 12)
Max-Grav 1=99 (LC 18), 5=182 (LC 17),
6=443 (LC 17),7=351 (LC 17)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=479/227, 2-3=348/153, 3-4=101/43,
4-5=114/218
BOT CHORD 1-7=190/117, 6-7=13/10, 5-6=-13/10
WEBS 3-6=321/521, 2-7=247/361
NOTES
1) Wind: ASCE 7=16; Vuh=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. 11; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E) 0-0.8 to
3-0-8, Interior (1) 3-0-8 to 10-6-4 zone;C-C for members
and forces & MWFRS for reactions shown; Lumber
DOL=1.60 plate grip DOL=1.60
2) Truss designed for wind loads in the plane of the truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consuB qualified building designer as per ANSI/TPI 1.
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Gable requires continuous bottom chord bearing.
5) Gable studs spaced at 4-0-0 oc.
6) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any -other live loads.
7) • This truss has been designed for -a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OG-00 wide will fit between the bottom
chord and any other members, with BCDL = I O.Opsf.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 96 lb uplift at joint
5, 263 lb uplift at joint 6 and 192 lb uplift at joint 7.
9) This truss design requires that a minimum -of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin. Velez.FE No.68192
Il USA, Inc. FL Cert 6634'
Itill Parke Ead Blvd, Tpmpa FL 3300
Date:
August 2,2021
® WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE 10II-7473 rev. 5/192020 BEFORE USE.
Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property incorporate this design into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing MiTek'
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSLITF11 Quality Criteria, DSBM9 and SCSI Building Component 6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601 Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
2792357
V02
Valley
1
1
T248719zo
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564, Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 30 12:47:38 Page: 1
ID:rLHQH17GaJPehasl9arRm2z5LRU-RfC?PsB70Hg3NSgPgnLBw3u1TXbGKWrCDoi7J4zJC?f
0-6-15
I I 8-7-8 I
I I 8-0-9
0-6-15
2x4 u
2x4 a 2x4 n 2x4 u
I 8-7-8
Scale = 1:32.9
Loading
(pso
Spacing
2-0-0
CSI
DEFL
in
(loc) Vdefl
Ud
PLATES GRIP
TCLL (roof)
20.0
Plate Grip-DOL
1.25
TC
0.31
Vert(LL)
Na
n/a
999-
-MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.25
Vert(TL)
n/a
n/a
999
BCLL
0.0 •
Rep Stress IDcr
YES -
WB
0.18
Horiz(TL)
0.00
4 n/a
n/a
BCDL
10.0
Code
FBC2020/rP12014
-Matrix-AS
Weight: 34 lb FT = 20°k
LUMBER
TOP CHORD
2x4 SP No.2
BOT CHORD
2x4 SP-No.2
WEBS
2x4 SP No.3
OTHERS
2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied,
except end verticals.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 1=146/8-7-8, 4=107/B-7-B,
5=42618-7-8
Max Horiz 1=264 (LC 12)
Max Uplift 4=83 (LC 12), 5=307 (LC 12)
Max Grav 1=146 (LC 1), 4=113 (LC 17).
5=446 (LC 17)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=392/188, 2-3=114/47, 3-4=113/223
BOT CHORD 1-5=367/266, 4-5=0/0
WEBS 2-5=385/596
NOTES
1) Wind: ASCE 7-16; Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=oft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E) O-D-B to
3-041, Interior (1) 3-0-8 to B-6-4 zone;C-C for members
and forces & MWFRS for reactions shown; Lumber
DOL=1.60 plate grip DOL=1.60
2) Truss designed for wind loads in the plane of the truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consult qualified building designer as per ANSI/rPI 1.
3) Building Designer/ Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Gable requires continuous bottom chord bearing.
5) Gable studs spaced at 4-0-0 oc.
6) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
7) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall'by 2-OG-00 wide will fit between the bottom
chord and any other members.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 83 lb uplift at joint
4 and 307 lb uplift at joint 5.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE No.681$2
MITek USA, Ind. FL Cert 8834
81%4'Parke East Bivd. Tampa FL_ 33910
:,Data:
August 2,2021
®WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 6119/2020 BEFORE USE.
Design valid for use only with MITek® connectors. This design is based only upon parameters shown, and Is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly Incorporate this design Into the overall
building design. Bracing Indicated is to prevent buckling of Individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSM11 Quality Criteria, DSB-89 and SCSI Building Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 213601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
12792357
IV03
T24871921
Valley
1
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33564,
Scale = 1:292
Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MMek Industries, Inc. Fri Jul 30 12:47:40 Page: 1
I D:rLHQH17GaJPehasl9arRm2z5LRU-RfC7PsB70Hg3NSgPgnL8w3ulTXbGKWrCDci7J4zJC7f
0-6-15
6-7-8
6-0-9
0-6-15
2x4 u
2x4 u
2x4 o 2x4 a
I 6-7-8 1
Loading
(psf).
Spacing
2-0-0
CSI
DEFL
in
(loc) I/defl
L/d
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL-
1.25
TC
0.33
Vert(LL)
file
n/a
999
MT20 244/190
TCDL
10.0=
Lumber DOL
1.25
BC
0.12
Vert(TL)
n/a
n/a
999
BCLL
0.0'
Rep Stress Incr
YES
WB
0.19
Hodz(TL)
0.00
4 n/a
n/a
BCDL
10.0
Code
FBC2020/TPI2014
Matrix -AS
Weight: 25 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4-SP No.2
WEBS
2x4 SP No.3
OTHERS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied,
except end verticals.
BOT CHORD
Rigid ceiling directly applied.
REACTIONS
(Ib/size) 1=6216-7-8, 4=125/6-7-8.
5=332/Cr7-8
Max Horiz 1=200 (LC 12)
Max Uplift 4=-96 (LC 12), 5=234 (LC 12)
Max Grav 1=62 (LC 1), 4=132 (LC 17), 5=347
(LC 17)_
FORCES
(lb) - Maximum Compression/Maximum-
Tension
TOP CHORD
1-2=-411/185, 2-3=128/57, 3-1=136/253
BOT CHORD
1-5=167186, 4-5=0/0
WEBS
2-5=-355/622
NOTES
1) Wind: ASCE 7-16; Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf:TCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat-ll; Exp C; Enclosed;
MWFRS (directional) and C-C Extedor(2E) 0-0-B to
3-0-8, Interior (1) 3-0-8 to 6-6-4 zone;C-C for members
and forces & MWFRS.for reactions shown; Lumber
DOL=1.60 plate grip DOL=1.60
2) Truss designed for wind loads in the plane of the truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consult qualified building designer as per ANSI/TPI 1.
3) Building Designer / Project engineer responsible for
verifying applied roof live load -shown covers rain loading
requirements specific to the use of this truss component.
4) Gable requires continuous bottom chord bearing.
5) Gable studs spaced at 4-0-0 oc.
6) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
7) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 96 Ib uplift at joint
4 and 234 lb uplift at joint 5.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE No.68182
MIT& USA, .Inr FL.Cert 6634
II 04-Parke East Btvd. Tampa FL 3.3610
Oats_:
August 2,2021
A WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/19/2020 BEFORE USE.
Design valid for use only with MTeke connectors. This design Is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly Incorporate this design into the overall
building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing MiTek•
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSM11 Quality Crherfa, DSB-89 and BCSI Building Component 69D4 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Sufle 203 Waldorf, MD 20601 Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T24871922
2792357
VO4
Valley
1
1
,lob Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564.
0
v
N
Scale = 1:25.4
Run: 8.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MITek Industries, Inc. Fri Jul 30 12:47:40 Page: 1
ID:rLHQH 17GaJPehasl9arRm2z5LRU-RfC?PsB70Hg3NSgPgnL8w3ulTXbGKWrCDoi7J4zJC?f
0-6-15
4-7-8
4-0-9
0-6-15
2X4 u
2x4 n
3x4 0
I 4-7-8 I
Loading
(psi)
Spacing
2-0-0
CSI
DEFL
in
(loc) Vdefl
Ud
PLATES GRIP
TCLL (roof)-
20.0
Plate Grip DOL
1.25
TC
0.40
Vert(LL)
n/a
n/a
999
MT20 2441190
TCDL
10.0
Lumber DOL
1.25
BC
0.46
Vert(TL)
n/a
n/a
999
BCLL
0.0'
Rep Stress Incr
YES
WB
0.00
Hodz(TL)
-0.01
3 n1a
n/a
BCDL
10.0
Code
FBC2020/rP12014
Matrix -AS
Weight: 16 lb FT = 20%
LUMBER
TOP CHORD .2x4 SP No.2
BOT CHORD 2x4 SP No.2-
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied,
except -end verticals.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 1=179/4-7-8.3=179/4-7-8
Max Horiz 1=135 (LC 12)
Max Uplift 1�67 (LC 12), 3=130 (LC 12)
Max Grav, 1=179 (LC 1), 3=188 (LC 17)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=301/299, 2-3=169/287
BOT CHORD 1-3=5321373
NOTES
1) Wind: ASCE 7-16; Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Extedor(2E) 0-0-8 to
3-0-8, Interior (1) 3-0-8 to 4-6-4 zone;C-C for members
and forces & MWFRS for reactions shown; Lumber
DOL=1 SO plate grip DOL=1.60
2) Truss designed for wind loads in the plane of the truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consult qualified building designer as per ANSI/TPI 1.
3) Building -Designer/ Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
4) Gable requires continuous bottom chord bearing.
5) Gable studs spaced at 4-0-0 oc.
6) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
7) ' This truss has been designed for a live load of 20.0psf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 130 lb uplift at
joint 3 and 67 lb uplift at joint 1.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the -bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE No.68182
MiTek USA, Ire: FLiCert 6634
8904 Parke.Eest Blvd. Tampa FL 33610
Data.
August 2,2021
®WARNING -verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mil-7473 rev. 5/1912020 BEFORE USE.
Design valid for use only with Mrek® connectors. This design is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property incorporate this design Into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
WeW
is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANS11TP11 Quality Criteria, DSB-89 and BCSI Bullding Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
12792357
T24871923
V05
Valle y
1
Job Reference o tional
Builders FirstSource (Tampa, FL), Tampa, FL- 33564,
C.
6
Scale = 1:19.2
Run: 8.43 S Jul 15 2021 Print: 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 30 12:47:40 Page: 1
I D: rLH DH 17GaJPehasl9arRm2z5LRU-RfC7 PsB70Hg3N SgPgnL8w3ulTXbGKWrCDoi7J4zJC7f
2-7-a I
2x4 u
2
s1r
O
v
3
2x4 a
2-7-8
2x4 u
Loading
(psf)
Spacing
2-0-0
CSI
-DEL
in
(loc) Udefl
Lid
PLATES GRIP
TCLL (roof)
20.0
Plete GripDOL
1.25
TC
0.08
Vert(LL)
n/a
- n/a-
999
MT20 2441190
TCDL
10.0
Lumber DOL
1.25
BC
0.12
Vert(TL)
file
- n/a
999
BCLL
0.0'
Rep Stress Incr
YES
WB
0.00
Hodz(TL)
0.00
-3 n/a
n/a
BCDL
10.0
Code
FBC2020aP12014
Matrix -MP
Weight: 8 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied or
2-7-8 oc.pudins, except end verticals.
BOT CHORD
Rigid ceiling directly applied or 10-0-0 oc
bracing.
REACTIONS
(lb/size) 1=99/2-7-8, 3=99/2-7-8
Max Horiz 1=71 (LC 12)
Max Uplift 1=39 (LC 12). 3=70 (LC 12)
Max Grav 1=99 (LC 1), 3=104 (LC 17)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=138/127, 2-3=83/135
BOT CHORD 1=3=241/169
NOTES
1) Wind: ASCE 7-16; VuB=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; 11=251t;
B=45ft; L=24ft; eave=oft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E) zone;C-C for
members and forces & MWFRS for reactionsrshown;
Lumber DOL=1.60 plate grip DOL=1.60
2) Truss designed for wind loads in the plane ofthe truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details asapplicable,
or consult qualified building designer as per ANSUTPI 1.
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Gable requires continuous bottom chord bearing.
5) Gable studs spaced at 4-0-0 oc.
6) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
7) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 70 lb uplift at joint
3 and 39 lb uplift at joint 1.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE No.68182
Wilk USA, Ina. FL Cert.6634 .
690b Parke East Blvd. Tampa FL 3300
..Data:
August 2,2021
A WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/19/2020 BEFORE USE.
`
Design valid for use only with Mrek® connectors. This design is based only upon parameters shown, and Is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design Into the overall
building design. Bracing Indicated is to prevent buckling of Individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek�
is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing oftrusses and truss systems, see ANSI?P/f Quality Criteria, DSS-89 and SCSI Building Component
6904 Parke East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T24871924
2792357
V06
Valley
1
1
Job Reference (optional)
Builders FirstSource (rampa, FL), Tampa, FL - 33554,
m
N
Scale = 1:32.5
Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 MITek Industries, Inc. Fri Jul 30 12:47:41 Page: 1
ID:rLHQH 17GaJPehasl9arRm2z5LRU-RfC7PsB70Hg3NSgPgnL8w3ulTXbGKWrCDoi7J4zJCTf
0-6-15
I I 8-4-8 I
7-9-9
0-6-15
2x4 u
2x4 s 2x4 it 2x4 u
Loading
(psf)
Spacing
2-D-0
CSI
DEFL
in. (loc)
Well
Ud
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.30
Vert(LL)
n/a
We
999
MT20 2441190
TCDL
10.0
Lumber DOL
1.25
BC
0.21
Vert(TL)-
n/a
n/a
999
BCLL
0.0'
Rep Stress Incr
YES
WB
0.18
Horiz(TL)
0-.00 4
n/a
n/a
BCDL-
10.0
Code
FBC2020frP12014
Matrix -AS
Weight: 33 lb FT = 20%
LUMBER
TOP CHORD
2x4 SP No.2
BOT CHORD
2x4 SP No.2
WEBS
2x4 SP No.3
OTHERS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied,
except end verticals.
BOT CHORD
Rigid ceiling directly applied:
REACTIONS
(lb/size) 1=136/8-4-8, 4=110/8-4-8,
5=411 /8-4-8
Max Hodz 1=256 (LC 12)
Max Uplift -4=86 (LC 12). 5=296 (LC 12)
Max Grav 1=136 (LC 1), 4=117 (LC 17),
.5=431(LC 17)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=392/186, 2-3=116/49, 3-4=117/227
BOT CHORD 1-5=349/248, 4-5=0/0
WEBS 2-5=-377/592
NOTES
1) Wind: ASCE 7-16; Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft;1-24ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E) 0-0-8 to
3-0-8, Interior (1) 3-0-8 to 8-3-4 zone;C-C for members
and forces & MWFRS for reactions shown; Lumber
DOL=1.60 plate grip DOL=1.60
2) Truss designed for wind loads in the plane of the truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consult qualified building designer as per ANSUTPI 1.
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements speck to the use of this truss component.
4) Gable requires continuous bottom chord bearing.
5) Gable studs spaced at 4-0-0 oc.
6) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
7) ` This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06410 tall by 2-00-00 wide will fit between the bottom
chord and any other members.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 86 lb uplift at joint
4 and 296 lb uplift at joint 5.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
Joaquin Velez PE No.88182
MITT& USA, Ine:.FL`.Cert6834
8904Farke EaM Btvd. Tampa FL MID
Date:
August 2,2021
® WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 5/19/2020 BEFORE USE.
°
Design valid for use only with Mrrek® connectors. This design is based only upon parameters shown, and is for an individual building component, not
a truss system. Before use, the building designer must verity the applicability of design parameters and property incorporate this design Into the overall
building design. Bracing Indicated Is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
Is always required for stability and to prevent collapse with possible personal injury and property, damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANS11TP/1 Quality Criteria, DSB-89 and BCS/Building Component
6904 Parke East Blvd.
Safety IMormation available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
T24871925
2792357
V07
Valley
Job Reference (optional)
Builders FlrstSource (Tampa, FL), Tampa, FL - 33564,
m
N
Scale = 1:26.8
C
O
O
3X6 --
Run: 0.43 S Jul 16 2021 Print 8.430 S Jul 16 2021 MTek Industries, Inc. Fri Jul 30 12:47:42 Page: 1
I D: rLHQH 17GaJPehas I9arRm2z5LRU-RtC?PsB7OH q3 NSgPgn L8w3ulTXbG KWrCDoi7J4zJC?f
6-4-8
2x4 n
2X4 it
Loading
(psf)
Spae'ng
2-0-0
CSI
DEFL
in
(loc) Vdefl
Lid
PLATES GRIP—
TCLL (roof)
20.Q
Plate Grip DOL
1.25
TC-
0.79
Vert(LL)
n/a
file
999
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.80
Vert(TL)
n/a
- n/a
999
BCLL
0-Q'
Rep Stress Iner
YES
WB
0.00
Horiz(TL)
0.02
3 file
file
BCDL
10.0
Code
FBC2020/TPI2014
Matrix -AS
Weight: 23 lb FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS 2x4 SP No.3
BRACING
TOP CHORD Structural wood sheathing directly applied,
except end verticals.
BOT CHORD Rigid ceiling directly applied.
REACTIONS (lb/size) 1=249/6-4-8, 3=249/6-4-8
Max Hodz 1=192-(LC 12)
Max Uplift 1=91.(LC 12). 3=183 (LC 12)
Max Grav 1=249 (LC 1), 3=262 (LC 17)
FORCES (lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=-443/395, 2-3=234/392
BOT CHORD 1-3=-669/531
NOTES
1) Wind: ASCE 7-16; VuK=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.Opsf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E) O-D-8 to
3-0-8, Interior (1) 3-0-B to 6-3-4 zone;C-C for members
and forces & MWFRS for reactions shown; Lumber
DOL=1.60 plate grip DOL=1.60
2) Truss designed for wind loads in the plane of the truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consult qualified building designer as per ANSI/TPI 1.
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
4) Gable requires continuous bottom chord bearing.
5) Gable studs spaced at 4-0-0 oc.
6) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
7) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fd between the bottom
chord and any other members.
8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 183 lb uplift at
joint 3 and 91 lb uplift at joint 1.
9) This truss design requires that a minimum of 7116"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
.Joaquin Velez PE No.68182
MTT& USA, In&.FL?:ert 6634 .
8904Parke Eest Blvd. Tampa FL 33010'
Date:
August 2,2021
®WARNING -Verily design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 5/1912020 BEFORE USE.
Design valid for use only with MTek® connectors. This design is based only upon parameters shown, and is for an Individual building component, not
�a
a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall
building design. Bracing indicated is to buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
prevent
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSYTP/r Quality Criteria, DSB-89 and SCSI Building Component
6904 Parke East Blvd.
Safetylnfonnadon available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
City
Ply
11
1
T24871926
2792357
V08
Valley
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL - 33564,
Scale=1:22.6
Run: 8.43 S Jul 16 2021 Print: 8.430 S Jul 16 2021 MiTek Industries, Inc. Fri Jul 30 12:47:43 Page: 1
ID:rLHQH17GaJPehasl9arRm2z5LRU-RfC7PsB70Hg3NSgPgnL6w3ulTXbGKWrCDoi7J4zJC7f
i 4-4-8 I
2x4 n
2x4 u
I 4-4-8 I
o0
N
N
Loading
(psf)
Spacing
2-0-0
CSI
DEFL
in
(loc) Well
L/d
PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
TC
0.35
Vert(LL)
We
n/a
999
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.41
Vert(TL)
n/a
n/a
999
BCLL
0.0'
Rep_SVess Incr
YES
WB
0.00
-Hodz(TL)
-0.01
3 n/a
n/a
BCDL
10.0
Code
FBC2020/TPI2014
Matrix -AS
Weight: 15 Ib FT = 20%
LUMBER
TOP CHORD 2x4 SP No.2
BOT CHORD 2x4 SP No.2
WEBS
2x4 SP No.3
BRACING
TOP CHORD
Structural wood sheathing directly applied,
except end verticals.
BOT CHORD
Rigid ceiling directly applied.
REACTIONS
(lb/size) 1 =1 69/4-4-8. 3r1 69/4-4-8
Max Horiz 1=127 (LC 12)-
-Max Uplift 1=64 (LC 12), 3=123 (LC 12)
Max Grav 1=169 (LC 1), 3=178 (LC 17)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD 1-2=281/280, 2-3=158/268
BOT CHORD 1-3=4961348
NOTES
1) Wind: ASCE 7-16; Vuh=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=B.Opsf; h=25ft;
B=451t; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E) 0-0-8 to
3-0-8, Interior (1) 3-0-8 to 4-3-4 zone;C-C for members
and forces& MWFRS for reactions shown; Lumber
DOL=1.60 plate -grip DOL=1.60
2) Truss designed for wind loads in the plane of the -truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consult qualified building designeras per ANS11TPI 1.
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown -covers rain loading
requirements speck to the use of this truss component.
4) Gable requires continuous bottom chord bearing.
5) Gable studs spaced at 4-0-0 oc.
6) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
7) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will fit between the bottom
chord and any other members.
-8) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 123 lb uplift at
joint 3 and 64 lb uplift at joint 1.
9) This truss design requires that a minimum of 7/16"
structural wood sheathing be applied directly to the top
chord and 1/2" gypsum sheetrock be -applied directly to
the bottom chord.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic copies.
.Joaquim Velez PE 96.63182
MiTek IJSA,,Inc. FL:Cett 6634
'P40arke Enst Blvd. Tampa FL.33610
.'Date:
August 2,2021
®WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII.7473 rev. 51192020 BEFORE USE.
Design valid for use only with Mrek® connectors. This design is based only upon parameters shown, and is for an Individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and properly Incorporate this design into the overall
building design. Bracing Indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek
Is always required for stability and to prevent collapse with possible personal Injury and property damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSfITP/f Quality Criteria, DS049 and BCSI Building Component
6904 Padre East Blvd.
Safety Information available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldod, MD 20601
Tampa, FL 36610
Job
Truss
Truss Type
Qty
Ply
12792357
T-24871927
V09
Valley
1
1
Job Reference (optional)
Builders FirstSource (Tampa, FL), Tampa, FL- 33564,
Scale = 1:17
Run: 8.43 S Jul 16 2021 Print 8:430 S Jul 16 202T MITek Industries, Inc. Fd Jul 30-12:47:43 Page: 1
I D:rLHQH 17GaJ Pehasi9arRm2z5LRU-RfC7PsB70H g3NSg Pqn LBw3ulTXbGKWrCOoi7J4zJC7f
I 2-4-8 I
12 2
6 r
m
N
2x4
2-4-8-
Loading
(psf)
Spacing
2-0.0
CSI
DEfL
in
(loc) Vdefl
Ud-
"PLATES GRIP
TCLL (roof)
20.0
Plate Grip DOL
1.25
Tc
-0.07
Vert(LL)
n/a
- n/a
999
MT20 244/190
TCDL
10.0
Lumber DOL
1.25
BC
0.11
Vert(TL)
n/a
- n/a
999
BCLL
0.0'
Rep Stress-lncr
YES
WB
0.00
Horiz(TL)
0.00
3 n/a
n/a
BCDL
10.0
Code
FBC2020/rP12014
Matrix -MP
Weight: 7 lb FT = 20%
LUMBER
TOP CHORD
2x4 SP No.2
BOT CHORD
2x4 SP-No.2
BRACING
TOP CHORD
Structural wood sheathing directly applied or
2-4-8 oc purlins.
BOT CHORD
Rigid ceiling directly applied or 10-0-0 oc
bracing.
REACTIONS
(lb/size) 1=95/2-4-8, 2=55/2-4-8. 3=40/2-4-8
Max Horiz 1=67 (LC 12)
Max Uplift 1=37 (LC 12). 2=51 (LC 12),
3=16 (LC 12)
Max Grav 1=95 (LC 1), 2=58 (LC 17), 3=41
(LC 17)
FORCES
(lb) - Maximum Compression/Maximum
Tension
TOP CHORD
1-2=130/118
BOT CHORD
1-3=225/158
NOTES
1) Wind: ASCE 7-16; Vult=163mph (3-second gust)
Vasd=126mph; TCDL=4.2psf; BCDL=6.0psf; h=25ft;
B=45ft; L=24ft; eave=4ft; Cat. II; Exp C; Enclosed;
MWFRS (directional) and C-C Exterior(2E) zone;C-C for
members and forces & MWFRS for reactions shown;
Lumber DOL=1.60 plate grip DOL=1.60
2) Truss designed for wind loads in the plane of the truss
only. For studs exposed to wind (normal to the face),
see Standard Industry Gable End Details as applicable,
or consult qualified building designer as per ANSI/rPI 1.
3) Building Designer / Project engineer responsible for
verifying applied roof live load shown covers rain loading
requirements specific to the use of this truss component.
4) Gable requires continuous bottom chord bearing.
5) Gable studs spaced at 4-0-0 oc.
6) This truss has been designed for a 10.0 psf bottom
chord live load nonconcurrent with any other live loads.
7) ' This truss has been designed for a live load of 20.Opsf
on the bottom chord in all areas where a rectangle
3-06-00 tall by 2-OD-00 wide will rd between the bottom
chord and any other members.
8) Bearing atjoint(s) 2 considers parallel to grain value
using ANSI/TPI 1 angle to grain formula. Building
designer should verify capacity of bearing surface.
9) Provide mechanical connection (by others) of truss to
bearing plate capable of withstanding 16 lb uplift at joint
3, 37 lb uplift at joint 1 and 51 lb uplift at joint 2.
LOAD CASE(S) Standard
This item has been
electronically signed and
sealed by Velez, Joaquin, PE
using a Digital Signature.
Printed copies of this
document are not considered
signed and sealed and the
signature must be verified
on any electronic. copies.
-Joaquin Velez PE No.68182
MIT& USA, Inc.. FLfCert 8B34
.6904 Parke East Blvd. Tampa FL,33610
bate:
August 2,2021
,& WARNING -Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE Mll-7473 rev. 51192020 BEFORE USE.
°
Design valid for use ony with Mirek® connectors. This design is based only upon parameters shown, and Is for an individual building component, not
a truss system. Before use, the building designer must verify the applicability of design parameters and property Incorporate this design into the overall
building design. Bracing indicated Is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing
MiTek'
Ialways required for stability and to prevent collapse with possible personal Injury and properly damage. For general guidance regarding the
fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSLrTPlf Quality Criteria, DSB-89 and BCSI Building Component
6904 Parke East Blvd.
Saretyinformadon available from Truss Plate Institute, 2670 Crain Highway, Suite 203 Waldorf, MD 2D601
Tampa, FL 36610
Symbols
Numbering System
General Safety Notes
PLATE LOCATION AND ORIENTATION
Center plate on joint unless x, y
offsets are indicated.
1 6-4-8 dimensions shown In ft-In-sixteenths
(Drawings not to scale)
1
Failure to Follow Could Cause Property
Damage or Personal Injury
Dimensions are in ft-in-sixteenths.
1. Additional stability bracing for truss system, e.g.
Apply plates to both sides of truss
1 2 3
diagonal or X-bracing, is always required. See SCSI.
and fully embed teeth.
TOP CHORDS
2. Truss bracing must he designed by an engineer. For
�'y16�r
c1-2 c2-3
wide truss spacing, individual lateral braces themselves
bracing, or alternative Tor I
4
may require
WEBS C�
q°� ��� t X
bracing should be considered.
3. Never exceed the design loading shown and never
U°' 2
stack materials on inadequately braced trusses.
EL cT U
4. Provide copies of this truss design to the building
00 a0
designer, erection supervisor, property owner and
For 4 x 2 orientation, locate
cs-s F
c�-a CHORDS
BOTTOM CHORDS
all other interested parties.
plates 0- 11e' from outside
5. Cut members to bear tightly against each other.
edge of truss.
8 7 6 5
6. Place plates on each face of truss at each
joint and embed fully. Knots and wane at joint
This Symbol in iggtes the
JOINTS ARE GENERALLY NUMBERED/LETTERED CLOCKWISE
locations are regulated by ANSI/TPI 1.
required direction 'of slots in
AROUND THE TRUSS STARTING AT THE JOINT FARTHEST TO
7. Design assumes trusses will be suitably protected from
connector plates.
THE LEFT.
the environment in accord with ANSII TPI 1.
"on details available in MiTek 20I20
ti
Plate locati
CHORDS AND WEBS ARE IDENTIFIED BY END JOINT
NUMBERSILETTERS.
8. Unless otherwise noted, moisture content of lumber
shall not exceed 19% at time of fabrication.
software upon request
9. Unless expressly noted, this design is not applicable for
PRODUCT CODE APPROVALS
use with fire retardant, preservative treated, or green lumber.
PLATE SIZE
ICC-ES Reports:
10. Camber is a non-structural consideration and is the
The first dimension is the plate
responsibility of truss fabricator. General practice is to
4 x 4 width measured perpendicular
ESR-131 i, ESR-1352, ESR1988
camber for dead load deflection.
to slots. Second dimension is
ER-3907, ESR-2362, ESR-1397, ESR-3282
11. Plate type, size, orientation and location dimensions
the length parallel t0 slots.
indicated are minimum plating requirements.
LATERAL BRACING LOCATION
12. Lumber used shall be of the species and size, and
in all respects, equal to or better than that
specified.
Indicated by symbol shown and/or
by text in the bracing section of the
Trusses are designed for wind loads in the plane of the
truss Unless Otherwise Shown.
13. Top chords must be sheathed or pudins provided at
spacing indicated on design.
output. Use T or I bracing
if indicated.
Lumber design values are in accordance with ANSI/TPI 1
14. Bottom chords require lateral bracing at 10 ft. spacing,
or less, if no ceiling is installed, unless otherwise noted.
section 6.3 These truss designs rely on lumber values
BEARING
established by Others.
15. Connections not shown are the responsibility of others.
16. Do not cut or alter truss member or plate without prior
Indicates location where bearings
approval of an engineer.
(supports) occur. Icons vary but
reaction section indicates joint
© 2012 MiTek® All Rights Reserved
17. Install and load vertically unless indicated otherwise.
number where bearings occur.
Min size shown is for crushing only.
18. Use of green ortreated lumber may pose unacceptable
environmental, health or performance risks. Consult with
project engineer before use.
Industry Standards'
Nil
19. Review all portions of this design (front, back, words
ANSI/TPI1: National Design P
n Specification for Metal
and pictures) before use. Reviewing pictures alone
is not sufficient.
Plate Connected Wood Truss Construction.
DSB-89: Design Standard for Bracing.
20. Design assumes manufacture in accordance with
BCSI: Building Component Safety Information,
MiTek
ANSI/TPI 1 Quality Criteria.
Guide to Good Practice for Handling,
21.The design does not take into account any dynamic
Installing & Bracing of Metal Rlate
or other loads other than those expressly stated.
Connected Wood Trusses.
MiTek Engineering Reference Sheet Mll-7473 rev. 5/19/2020