Loading...
HomeMy WebLinkAbout216577-1d Compaction signedHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 August 20, 2021 CONTRACTOR: JOB LOCATION: PERMIT #: To Whom it may concern, Ve C41 t ENGINEERING i117AYL AND TESTING Ron Raymond Construction, Inc. P.O. Box 12058 Fort Pierce, FL 34979 18103 Bridle Way Fort Pierce, Florida 21050729 Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net KSM JOB # : 216577-1d/BS/jam Enclosed, please find the nuclear density test results performed on the House Pad - 1st Lift at the above referenced project. Should you have any questions, please feel free to contact our office. Respectfully, This item has been electronically signed and sealed by Julie Keller, P.E. FI. Lic. 68366 on the date stated directly to the right using a digital signature. Printed copies of this document are not nsidered signed and sealed and the signature must be verified on any electronic copies. Digitally signed by Julie Keller Date: 2021.08.20 14:36:13-04'00' Julie E. Keller, P.E. President PE# 68366 08/20/21 Email: raymond24@bellsouth.net Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting Proudly Serving Florida since 1990 Certified Women Owned Business - WBE Headquarters 1W C IL t ENGINEERING Mailing 11345 U.S. Highway 1 PO Box 78-1377 Sebastian, FL. 32958 i1171VL AND TESTING Sebastian, FL. 32978 Orlando Phone: 772-589-0712 723 Progress Way C.A.# 5693 Sanford, FL. 32771 KSMengineering.net SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 6938 DATE TESTED: August 19, 2021 KSM JOB #: 216577-1d/BS/jam NUC # 528 PERMIT #: 21050729 Nuc Model: MC-IDR-P Nuc Serial #: MD049528 CONTRACTOR: Ron Raymond Construction, Inc. JOB LOCATION: 18103 Bridle Way Fort Pierce, Florida ITEM TESTED: House Pad - 1st Lift TEST LOCATION PEN DRY MAX. DRY PERCENT DEPTH OF SAMPLE READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1 N. E. 0" - 12" 45 106.7 109.4 97.5 2 S.E. 40 105.9 96.8% 3 Center 45 107.1 97.9% 4 S.W. 45 107.7 98.4% 5 N.W. 45 108.0 98.7% Soil Description: Brown Clayed Sand In Place Moisture: 10.5 Proctor Optimum Moisture: 12.0 Proctor Max. Dry Density: P.C.F. 109.4 @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets Disclaimer: Contractor is responsible to maintain Minimum Requirement the tested area in the condition that KSM for Unstaked Foundation completed the indicated passed compaction test. KSM is not responsible if the tested area has been Julie E. Keller, P.E. President altered from the approved inspected condition. PE # 68366 8/20/2021 Email: raymond24@bellsouth.net Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting Proudly Serving Florida since 1990 Certified Women Owned Business - WBE Headquarters 1W C IL t ENGINEERING Sebastian, FLIg329 81 i11-J LVL AND TESTING Orlando 723 Progress Way Sanford, FL. 32771 SOIL COMPACTION REPORT ASTM D 1557 DATE TESTED: August 19, 2021 PERMIT #: 21050729 CONTRACTOR: Ron Raymond Construction, Inc. JOB LOCATION: 18103 Bridle Way Fort Pierce, Florida Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net KSM JOB # : 216577-1d/BS/jam 111.0 I I I I I W E I I I I I I I I I110.0 .—..—..�..—....—..—�.—..—..�..—....—..—, G I I I I I I I H T 109.0 .—..—..�..—..�. I I I I —J.—.. �..—..�..—..—. I I P I I..—..—�.—..—..I—.. �..—..—�.—..—..I—. —.. �..—..—. C I I I I I I I I F I I I I 107.0 I I • D I I I I I 106.0..—..—.—..—....—..�..—..—I.—..—..r-..—..-T..—..—. I I I R I I I I I I I I Y105.0..—....—..— .—..—.. I .—..—..�..—....—..—. I I I I 104.0..—....—..—.—..—.. I I I .—..—..�..—..�..—..—, 7 8 9 10 11 12 13 14 15 Moisture - % of Dry Weight Soil Description: Brown Clayed Sand Proctor Optimum Moisture: 12.0% Proctor Max. Dry Density: P.C.F. 109.4 Julie E. Keller, P.E. President PE # 68366 8/20/2021 Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting Proudly Serving Florida since 1990 Certified Women Owned Business - WBE