HomeMy WebLinkAboutCreekside Lot 11-Bond Beam.pdf®UNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
L4_ ii
Inspection Date: t — / — ;� Permit No. a' /U S " b y —5
Project: t�
Address: 1D5 B] tV
Check one:
XRegular Inspection:
❑ Reinspection Date of Initial Inspection: / a
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
I Storm Piping & Test
I I
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: ! ;� O r 112� 6L&. Y
Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved 42 Not Ready
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: 10a, Lic.#:6A)Z9, '
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamafa.com