HomeMy WebLinkAboutCreekside Lot 11-Column.pdf®UNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection' Date: , A / Permit No
Projecti�'�-
Address: 7 C7 Jr jj'1 Lk r� /�,Lu-P
Check one:
la' Regular Inspection:
❑ Reinspection
Date of Initial Inspection: ?
Inspection Type Requested (check):
L-fi 1 r
Ja . - o 9S�_
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
I
Re -inspection
Final Building
Final Electrical
Final Plumbing
I
Final Mechanical
Other Inspection Type: %)
Area Inspected/Code: 1 I 1 Cl- A nJA_qq
Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions
❑ DP -Disapproved Q? Not Ready
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: ,ri� 4), L`',O % Licit: ► )/V 5 5r
a/ OFFICES THROUGHOUT FLORIDA
❑ DA-Disallowed
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com