ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET
Florida Building Code 7th Edition (2020)
Based on Section 1525 of the Florida Building Code-Building
INSTRUCTION PAGE
COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET
APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED
BELOW:
Required Sections of Attachments Required
Roof System the Permit Application See List Below
Form
Low Slope Application A, B,C 1,2,3,4,5,6,7
Prescriptive BUR-RAS 150 A, B,C 2,4,5,6,7
Asphaltic Shingles A, B, D 1,2,4,5.6.7
Concrete or Clay Tile A, B, D, E 1,2,3,4,5,6,7
Metal Roofs A,B, D 1,2,3,4,5,6,,7
Wood Shingles and A, B, D IA4,5,6.7
Shakes
Other As Applicable 1,2,3,4,5,6,7
ATTACHMENTS REQUIRED As Applicable):
1. Fire Directory Listing Page
2. From Product Approval:
Front Page
Specific System Description
Specific System Limitations
General Limitations
Applicable Detail Drawings
3. Design Calculations per Chapter 16,or if applicable,RAS 127 or RAS 128
4. Other Component of Product Approval
5. Municipal Permit Application
6. Owners Notification for Roofing Considerations(Reroofing Only)
7. Any Required Roof Testing/Calculation Documentation
Form RooflnfoFeb21 Rev Feb 18,2021
ST. LUCIE WORKS
Section A (General Information)
Master Permit No. Process No.
Contractors Name: Sunrise City CHDO Inc License# CCC1327208
Job Address 5304 Deleon Ave Fort Pierce, FL 34951
ROOF CATEGORY
Low Slope ❑Mechanically Fastened Tile ❑Mortar/Adhesive Set Tiles
Asphaltic Shingles ❑Metal Panel/Shingles ❑Wood Shingles/Shakes
❑ Prescriptive BUR-RAS 150
ROOF ROOF TYPE
❑ New roof ❑ Repair ❑ Maintenance IV/]Reroofing ❑Recovering
ROOF SYSTEM INFORMATION
Low Slope Roof Area (SF) Steep Sloped Roof Area (SF) 1874 Total (SF) 1874
Section B(Roof Plan)
Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains.
Include dimensions of sections and levels,clearly identify dimensions of elevated pressure zones and location of parapets.
PATA UNM PATA
(It0) (ISp) (110)
ID 11 15 1Y II
6AS I7
(16h1)
�D �
a
ST. LUCIE WORKS
S ction C (Low Slope Roof) Surfacing:
Fill specific roof assembly components and identify Fastener Spacing for Anchor/Base Sheet Attach nt:
manu cturer Zone 1':—." oc @ Lap,#Rows—® "o
(If a co onent is not used,identify as"NA") Zone 1:—" oc @ Lap,#Rows 0 "0
System M ufacturer: Zone 2:—" oc @ Lap,#Rows "(
Zone 3:_.._." oc @ Lap,#Row ® woo
Product Appro I No.:
Number of Fasteners Per Insula ' n Board:
Design Wind Pressu s,From RAS 128 Or Calculations: Zone 1': Zone 1: one 2: Zone 3:
Zone 1':_Zone 1: Zone 2: Zone 3: Illustrate Components N ed and Details as Applicable:
Max. Design Pressure, fro the specific product approval Woodblocking, Gut r, Edge Termination, Stripping,
system: Flashing, Continuo s Cleat, Cant Strip, Base Flashing,
Counterflashing, oping, Etc.,
Deck: Indicate: Me of Height, Parapet Height, Height of Base
Type: Flashing,Co ponent Material,Material'Thickness,Fastener
Gauge Thickness: Type,fast er Spacing or Submit Manufacturers Details that
Comply ith RAS 111 and Chapter 16..
Slope:
Anchor/Base Sheet&No.df Ply(s):
Anchor/Base Sheet Fastener/Bonding Material: FT.
Insulation Base Layer:
Base Insultation Size and Thickness: Parapet
Base Insulation Fastener/Bonding Material: Height
Top Insulation Layer:
Top Insulation Size and Thickness: FT.
Top Insulation Fastener/Bonding Mal I:
Mean
Base Sheet(s)&No.of Ply(s): Roof
Base Sheet Fastener/Bonding aterial: Height
Ply Sheet(s)'&No/nding
Ply Sheet Fastener Material:
Top Ply:
Top PIy F tener/Bonding Material:
V ■r LV Mire WORKS
Section D (Steep Slope Roof System)
Roof system Manufacturer: Owens Corning
Notice of Acceptance Number:
FL10674
Minimum Design Wind Pressures, If Applicable(From RAS 127 or Calculations):
Zone 1:-4'.8 Zone 2e: -478 Zone 2n:"760 Zone 2r: '60 Zone 3e: 817 Zone 3r:
Deck Type Plywood
Type Underfayment: Peel N Stick
Roof Sbpe:
Insulation: None
Fire Barrier: None
[Rid,eVentilation? yes Fastener Type&Spacing: g D Ring Shank 6"OC
Adhesive Type: N/A
Type Cap Sheet: N/A
Mean RoofHeight: 1 0' Roof Covering: Shingles
Type&Size Drip 3"x 3" Aluminum I
Edge: ,.___._..........�
T. UCIE WORKS
Section E(Til\RequiredMomentof
Clculations)
d the systems,choose either Method 1 or 2.Compare the values for Mr with the values fro Mr.If the Mr values
r equal to the Mr values,for each area of the roof,then the tile attachment method is ceptable.
Method 1'Moment Based Tile Calculations Per RAS 12T
ne 1: x _ _)_( _( Product Approval M
ne 2e: x _ _)-Mg; =Mft Product Approval Mr
e 2n: x k = _)--Mg: =Mm, Product Approval
ne 2r: x Jl = -)-Mg: =M,& Product Approval r
ne 3e: x _ _)-Mg: =Mo. Product Appro I Mf
ne 3r: x) _ .��-M9 =M,ar Product Appr val MrMethod 2"Simplified Tile Calculations Per Table Bel of esistance(Mr)From Table Below Product Approval Mr
Mr required Moment Resistance*
Mean Roof Height Roof ope 15' 20' 25' 30' 40'
2:12 34.4 36.5 38.2 39.7 42.2
3:12 32.2 34.4 36.0 37.4 39.8
4:12 1130.4 32.2 33.8 35.1 37.3
5:12 28.4 30.1 31.6 32.8 34.9
6:12 .4 28.0 2 4 30.5 32.4
7:12 24. 25.9 .1 28.2 30.0
*Must be used in conjunction with a list o moment based tile sy ems
• For Uplift based the systems use Method 3.Compare the valu s for F'with the values for Fr If the F'values are greater than or
equal to the Fr values,for each area of the ro then the the ttachment method is acceptable.
Method 3" lift Base Tile Calculations Per RAS 12T
(Zone 1: x L =x W:= )-W: Cos =Fri Product Approval F'
(Zone 2e: x L =x W:= )-W: s r =Fr2e Product Approval F'
(Zone 2n: x L =x W:= )-W: r =Fr2n Product Approval F'
(Zone 2r: x L =x W:= )-W: Cos =Far Product Approval F'
(Zone 3e: x L =x W:= )-W: cos r =Fr3e Product Approval F'
(Zone 3r: x L =x W:= )-W: cos r =Frar Product Approval F'
Where to Obtain Infor ation
Description Symbol Where to find
Design Pressure Zo es 1,2e,2n,2r,3e,3r From apple ble table in RAS 127 or by an engineering analysis
prepared by based on ASCE 7
Mean Roof Height H Job Site
Roof Slope 6 Job Site
Aerodynamic Multiplier a Product Approval
Restoring Moment due to Grave Mg Product Approval
Attachment Resistance Mr Product Approval
Required Moment Resists a Mg Calculated
Minimum Attachment sistance F' Product Approval
Required Uplift Resis nce Fr Calculated
Average Tile Weig W Product Approval
Tile Dimensions L=length W=width Product Approval
All calculatio must be submitted to the building official at the time of permit application.