Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREAT���
CONSTRUCTION SOIL TREATMENT
PERMIT #
BUILDER/f
PEST CONTROL CONTRACTOR:
The Bua Assassin's LLC
PEST CONTROL LICENSE #: iBz745ss
We, the undersigned,
hereby certify
that
we have pretreated the above
described construction for
subterranean termites
in accordance
with
the standards of the National
Pest Control Association.
Square feet if area treated: 2,571 S.F.
Percentage of solution: o.i000i
Date of Treatment: oalisizozi
Footing
1st Treatment
_Re -Treat
_Driveway
_1st Treatment
Re -Treat
_Other
lst Treatment
Re -Treat
Chemicals used: Dominion 2L
Total gallons used: iao
Time of Treatment: �
x Slab
X lst Treatment
Re -Treat
_Pools
_1st Treatment
Re -Treat
_Perimeter for Final Inspection
ICIW6 91361
SignatureVof Exfdrminator Date
Note; There must be acomp/eted form for each required treatment or re -treatment and this form must be on the job
site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection
fee charged.
FBC104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistantjobsite posting board
shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
providing a copy for the person the permit /s Issued to and another copy for the building permit Ales. The Treatment
Certificate shall provide the product used, Identity of the applicator, time and date of the treatment, site location, area
treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of
protective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Revised 7/24/2014