Loading...
HomeMy WebLinkAboutcompaction testG���Ntni • cEorFcti 2 Universal Z&xg Sciences • • •-- y 02 G 9(S TFSTING'7N�e� • UES Project No: 3310.2000257.0000 Workorder No: 246067-1 Report Date: 09/16/2021 607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580 In -Place Density Test Report Client: Baron Island Storage, LLC UES Technician: Emmanuel Soto 49 SW Flagler Avenue Suite 301 Date Tested: 09/16/2021 Stuart, FL 34994 Project: Baron Island Self Storage 9500 South Ocean Drive, Jensen Beach, County, FL 34957 Type of Test: Area Tested: 9563 South Ocean Dr, Jensen Beach Field: ASTM D-6938 Nuclear Gauge Method Material: Native Laboratory: ASTM D1557 Modified Proctor Reference Datum: 0 = Top of Native The tests below meet the 98% minimum compaction requirement. Maximum Optimum Field Dry Field Soil Pass Test Density Moisture Density Moisture Compaction or No. Location of Test Range (pcf) (%) (pcf) (%) (%) Fail 1 Southeast Corner of Dumpster Pad 0-1 ft 108.1 12.2 106.2 10.5 98 Pass 2 Center of Dumpster Pad 0-1 ft 108.1 12.2 107.2 13.0 99 Pass 3 Northwest Corner of Dumpster Pad 0-1 ft 108.1 12.2 105.8 11.7 98 Pass Remarks Permit # CLS 2010-0282 Reviewed By GFA International, Inc FBPE Registry No.4930 �`Soot?�iwc,ya �% _ * . N.. 84748 0 �O STATE OF 44, Digitally signed by Thomas D Monta no:A01410000000178 18498DCD000019A3 Date: 2021.09.16 21:20:15 -04'00' Thomas Dominic Montano Branch Manager STATE OF FLORIDA Professional Engineer No. 84146 This item has been digitally signed and sealed by Thomas Dominic Montano on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies. To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval. Page 1