Loading...
HomeMy WebLinkAboutCreekside Lot 3-Strapping.pdf®UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: f - f 6 — C;i/ Permit No. Project: C,71�" C co Address: 3 i Check one: * Regular Inspection: 0 /US- 0 6�a 3 ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection I Re -inspection Re -inspection Re -inspection Final Building I Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code:l % .1 1/l"4 Inspection Results: ElAP-ApprovedNAE-ApprovedJh Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditinnc/fnmmontc 1. 2. 3. 4. 5. 6. 7. 1 , Inspector's Name: ((� s �fi�Lic.#:�il/ J OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teampfa.com