Loading...
HomeMy WebLinkAboutCreekside Lot 86-Sewer Conn.pdf®UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: �� ` �5 `� Permit No. / Project: �� Address: Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): ba"_tb�Lb BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping &Test HW Piping &Test Wall/Ceiling Ceiling Rough -In Water Piping &Test CHW Piping &Test Framing Panel/Feeder Gas Piping &Test Cond. Piping &Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall &Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: $ — Cam_- C2r1/Ir Q Inspection Results: ®AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved O Not Ready Conditions/Comments: 1. 2. 3. 4. S. 6. 7. �t Inspector's Name: � Lic ' OFFICES THROUGHOUTFLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamefa.com