HomeMy WebLinkAboutCreekside Lot 110-Dry In Tin Tab.pdf®UNIVERSAL®
ENGINEERING SCIENCES
INSPECTION RESULTS/ b
Inspection Date: ' / Permit No. a /U
Project: j'L�t rS
2Z%
Check one:
kRegular Inspection:
❑ Reinspection Date of Initial Inspection: ! [n
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
I Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
I
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type
Area Inspected/Code: 3 �a r_C� L��Q.
Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions
IS DP -Disapproved ❑ Not Ready
❑ DA-Disallowed
4.
5.
6.
7.
Inspector's Name:
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)