Loading...
HomeMy WebLinkAboutCreekside Lot 110-Dry In Tin Tab.pdf®UNIVERSAL® ENGINEERING SCIENCES INSPECTION RESULTS/ b Inspection Date: ' / Permit No. a /U Project: j'L�t rS 2Z% Check one: kRegular Inspection: ❑ Reinspection Date of Initial Inspection: ! [n Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock I Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection I Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type Area Inspected/Code: 3 �a r_C� L��Q. Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions IS DP -Disapproved ❑ Not Ready ❑ DA-Disallowed 4. 5. 6. 7. Inspector's Name: OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com