Loading...
HomeMy WebLinkAboutCreekside Lot 114-Column 2nd Lift.pdfUNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: /I Permit No. Project: Address: Check one: AI9. Regular Inspection: �❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Slab Underground Floor Rough -In Underground Rough -In Duct Rough -In Steam Piping & Test Masonry Wall/Ceiling Wall Rough -In Ceiling Rough -In Stack Piping & Test Water Piping & Test HW Piping & Test CHW Piping & Test Framing Structural Panel/Feeder Service/Ground Gas Piping & Test Storm Piping & Test Cond. Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Final Building Re -inspection Final Electrical Re -inspection Final Plumbing Re -inspection Final Mechanical Other Inspection Type: ,9 Area Inspected/Code:I)�? — �bt 4A 44 l 4 Inspection Results-XAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: Lic.#: e /0 !z 2 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com