HomeMy WebLinkAboutRevisions; Beam ChangeOFFICE USE ONLY:
DATE FILED: St 14
REVISION FEE:
PERMIT # % �U 3
RECEIPT #
PLANNING & DEVELOPMENT SERVICES
BUILDING & CODE REGULATION DIVISION
2300 VIRGINIA AVENUE
FORT PIERCE, FL 34962-5652
(772)462.1553
APPLICATION FOR BUILDING PERMIT REVISIONS
PROJECT INFORMATION
LOCATION/SITE
ADDRESS:
A'7T HAITHE 1 ` 90 FT P)E966 3�dt/sr
DETAILED DESCRIPTION OF PROJECT
CONTRACTOR INFORMATION:
-11
STATE of FL REG./CERT. #: C (,,6 /S) 34 g) ST. LUCIE CO CERT. #:
BUSINESS NAME: AbAedA aK2j7&ycfMu
QUALIFIERS NAME:
ADDRESS: 665" /3 e- oyo
CITY:. , cc.r .044, x HF arsj STATE: FG ZIP: 3 z gdsS
PHONE (DAYTIME): �55 I ->Z2 - 3 9' 9d FAX:
OWNER/BUILDER INFORMATION:
NAME:
CITY: %QAT P1 9[e STATE:
PHONE (DAYTIME:
ARCHITECT/ENGINEER INFORMATION:'
FAX:
ZIP:
NAME: KYW AnVA90 6E
ADDRESS: „^Fz` ij/A /LMe-LAn36 CZ
CITY: CLAAENGAz,T STATE: Fc- ZIP
PHONE (DAYTIME): y07- '{63 - 05474 FAX:
SLCCC:9123109
Revised 06130117 , g
'Val
Vl
4-t40
STRUCTURAL CONSTRUCTION NOTES: FOUNDATION, CONCRETE, STEELAND WOOD
1. ALL CONSTRUCTION MUST CONFORM FLORIDA BUILDING CODE 2020, 7th Editi Q
Y. ALL VEGETATION IS TO BE REMOVED FROM SLAB I FOUNDATIONAREA NO WOOD OR VEGETATION IS TO BE BURIED WITHIN 1T OFANY BUILDING OR PROPOSED BUILDING. FILL TO BE CLEAN
'MATERIAL PLACED IN LIFTS NOT TO EXCEED V MECHANICALLY COMPACTED. ALL CELLS, CAVITIESAND AIR GAPS SHALL BE CLEANED OF ALL NON -PRESERVATIVE TREATED WOOD OR CELLULOSE
.MATERIAL PRIOR TO PLACEMENT OF CONCRETE.
3. SOIL BEARING 2,000 PSF MINIMUM AT 95%OF MODIFIED PROCTOR AS PER ASTM D-1557, TESTED IN IZ' MAX LIFTS, CONTRACTOR TO PROVIDE CERTIFICATE
4. SOIL TREATMENT TO EXTEND 1 FOOT BEYOND EXTERIOR SIDEWALLS OF STRUCTURE.
9. SOIL TREATMENT CERTIFICATE TO BE STORED IN WEATHER RESISTANT JOBSITE PLANS BOX
5. ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH "SPECIFICATIONS' FOR STRUCTURAL CONCRETE BUILDING"ACI 318-05,
8. CEMENT. ASTM C-150, TYPE 1
b. WATER: POTABLE
c. AGGREGATE: ASTM C-33
d. REINFORCING STEEL: ASTM A-615, GRADE 40
e. SLUMP: 51NCHES MAX
I. METALACCESSORIES:ACI-316
g. REINFORCING MESH: FIBERMESH ORASTM A-185, 6X6 W 1.4,W1.4
h. CURING COMPOUND: ASTM C-309, TYPE 1
I. FORMWORK: ACI SP-4 FORMWORK FOR CONCRETE, FORMWORK SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
J. TOLERANCES: FLOOR SLABS: 1/81NCH IN 10 FOOT MAXIMUM
k FINISHESFLOOR SLABS - STEEL TROWEL FINISH.
(1). WALKS & DRIVES -BROOM.
01). FLOORS TO RECEIVE TILE - BROOM.
I. SAW CUT CRACK CONTROL IN SLAB AT MAX SPACING 15'-0' 0/C AS SOONAS CURING PERMITS
NOT TO EXCEED 24 HOURS FROM TIME OF CONIC, POUR.
6. MINIMUM COVERAGE FOR REINFORCING STEEL UNLESS OTHERWISE NOTED SHALL BE:
e 3'CONCRETE DEPOSITED AGAINST GROUND.
b I W WALLS EXPOSED TO WEATHER OR IN CONTACT WITH THE GRADE,
0. 3W WALLS NOT EXPOSED TO THE WEATHER,
d i W COLUMNS,
e 1 Y." BEAMS, (OVER MAIN REINFORCING)
f 3/4"STRUCTURAL SLABS, FROM SURFACE,
7. ALL CONCRETE SHALL BE PLACED WITHIN 90 MINUTES FROM BATCH TIME, UNLESS RETARDER IS ADDED TO THE MIX.
S. ALL CONCRETE SLABS SHALL ATTAIN A MIN. STRENGTH OF 2500 PSI. IN 28 DAYS, FOOTINGS SHALL ATTAIN A MIN. STRENGTH OF 3,000 PSI
S. ALL CONCRETE BEAMS AND COLUMNS SHALL ATTAIN A MIN, STRENGTH OF 3000 PSI IN 28 DAYS
10. GRADE 40 STEEL MINIMUM IN FOUNDATION AND FOOTINGS, GRADE 601N BEAMS AND COLUMNS, LAPPED PER ACI-31 B.
11. PLACE ONE #5 BAR AT EACH SIDE OF MASONRY OPENINGS & 410' SPACING. (U.O.N.)
12. HOOK TOP OF COLUMN BARS INTO TIE BEAM
13. METAL STRAPS, CLIPS AND HARDWARE SHALL BE GALVANIZED, OR APPROVED EQUAL.
14. STRUCTURAL WOOD CRITERIA
PRIMARY WOOD FRAMING MEMBERS $HALL BE ND. 2 SOUTHERN PINE OR BETTER SURFACED DRY,. USED AT 19% MAXIMUM M.C. WITH THE FOLLOWING, STRESS RATINGS, UNLESS OTHERWISE
NOTED:
I. FB SINGLE MEMBER 1,200 PSI
11. FIE REPETITIVE MEMBERS 1,400 PSI
III. PC PERPENDICULAR TO GRAIN 565 PSI
IV. E 1,600,000
15. ALL WOOD IN CONTACT WITH MASONRY SHALL BE PRESSURE TREATED.
18, EGRESS WINDOW, FROM ALL BEDROOMS PROVIDED BY EGRESS WINDOW:
MAX SILL HT. = 44", MIN WIDTH = 20", MIN. HEIGHT = 24', MIN. AREA= 5.0 SF
17. LIGHT AND VENTILATION IN BEDROOMS, GREAT ROOM, DINING AND KITCHEN MIN 8%OF NET FLOOR AREA IN GLASS.
IS. ALL WRITTEN DIMENSIONS ON THESE DRAWINGS TAKE PRECEDENCE OVER SCALED DIMENSIONS.
IS STRUCTURAL FEATURES NOT DETAILED ON THESE PLANS WLL BE ADDRESSED BY THE ENGINEER AS CONSTRUCTION PROGRESSES.
20. SPLITTING OR CRACKING OF STRUCTUAL COMPONENTS DUE TO INSTALLATION OF HARDWARE IS NOT PERMITTED.
21, UNLESS OTHERWISE NOTED FOR EXTERIOR WALLS ALL PLYWOOD SHEATHING TO BE NAILED WITH 8d OR BETTER NAILS AT 4. O.C. AT THE EDGES AN 6"O.C. INFIELD.
22. INTERIOR DRYWALL TO BE SCREWED WITH DRYWALL SCREWS 1.5" LONG AND 0.131 INCHES DIAMETER. '
23. PRESSURE TREATED FULL LENGTH STUD AGAINST COLUMN BLOCK, WITH PRECUT STUD ADJACENT ATTACH BOTH STUDS TO POURED COLUMN WIT 1/2' x P HIM KWIK BOLTS, OR EQUAL, AT 24"
O.C. AND WITHIN 6" FROM ENDS. USE 3'xTx1/4" STEEL WASHERS AT EACH BOLT
24. OPENINGS FROM A PRIVATE GARAGE DIRECTLY INTO ROOM USED FOR SLEEPING PURPOSES SHALL NOT BE PERMITTED. OTHER OPENINGS BETWEEN THE GARAGE AND RESIDENCE SHALL BE
EQUIPPED WITH SOLID WOOD DOORS THAT ARE NOT LESS 1.3/8' IN THICKNESS OR STEEL DOORS THAT ARE SOLID OR HONEYCOMB CORE NOT LESS TI, 1-3/8' THICKNESS OR 20-MINUTE
FIRE -RATED DOOR. (R309.1)
25. DUCTS IN THE GARAGE AND DUCTS PENETRATING THE WALL OR CEILING SEPARATING THE DWELLING FROM THE GARAGE SHALL BE CONSTRUCTEC OF MINIMUM NO.26 GAGE SHEET METAL OR
OTHER APPROVED MATERIAL AND SHALL HAVE NO OPENINGS INTO THE GARAGE. (11309.1.1)
2& THE GARAGE SHALL BE SEPARATED FROM THE RESIDENCE AND ITS ATTIC AREA BY NOT LESS THAN 1Z GYPSUM BOARD APPLIED TO THE GARAGE S IDE. GARAGES BENEATH HABITABLE ROOMS
SHALL BE SEPARATED FROM ALL HABITABLE ROOMS ABOVE BY NOT LESS THAN 5/8" TYPE GYPSUM BOARD OR EQUIVALENT. WHERE THE SEPARATION It A FLOOR -CEILING ASSEMBLY, THE
STRUCTURE SUPPORTING THE SEPARATION SHALL ALSO BE PROTECTED BY NOT LESS THAN 1/2" TYPE W' GYPSUM BOARD OR EQUIVALENT, (R309.2)
27. CONTRACTOR IS RESPONSIBLE FOR ADEQUATE BRACING OF ALL STRUCTURALAND NON-STRUCTURAL MEMBERS DURING CONSTRUCTION PLYWOOD SHEATHING MUST BE APPLIED AS THE ROOF
OR FLOOR TRUSSES ARE ERECTED TO PREVENT TOPPLING. REFER TO TPI & WTCAPUBLICATION "BUILDING COMPONENT SAFETY INFORMATION' FOR HANDLING AND BRACING OF TRUSSES.
TEMPORARY BRACING PERMS-91.
28. CONTRACTOR TO OBTAIN THE LATEST PRODUCT APROVALS FROM THE MANUFACTURERS, VERIFY SAFE PRESSURES, THE EXPIRATION DATES, INSTALLATION SPECIFICATIONS AND SUITABLILITY
OF THE PRODUCT BEFORE INSTALLATION OF ALL BUILDING COMPONENTS.
29. ALL DRAWINGS ARE CONSIDERED PRELIMINARY UNTIL THEY HAVE BEEN APPROVED BY THE LOCAL BUILDING DEPARTMENT DO NOT ORDER ANY WORK OR MATERIAL WITH PRELIMINARY
DRAWINGS.
30. CONTRACTOR TO LAYOUT THE WORK, VERIFY ALL DIMENSIONS, ELEVATIONS, PITCH. WALL AND CEILING HEIGHTS PRIOR TO ORDERING ANY WORK OR MATERIAL.
31. WIND LOAD 'FBC 2020, 7ih EDITION, 0 MPH, 3-SECOND GUST, EXPOSURE C.
3X8 PT CROLUN
3/8" X 71 MIN,
LAG BOLT PER 5V METAL ROOF
EVERY TRUSS OVER TONGUE 4 GROOVE
WEEL t STICK UNDER
METAL ROOFING
3k 1
rRgss�s 1
1
I
I �
I �
i f
I I
I I
1 II
3X8 PT BE M
i
1 �
1 �
3X8 PT BEAM
CLOSS BRACES
SCALE: N.T.S.
GAZEBO FLAN
SCALE: 1/4" - 11011
14'-0"
2-1/2" X 4" NOTCH
8X8 mT FOR 3X8 BEAM INTO B 8 PT
P T BX$ BEAM SEE DETAIL FICST
TM
3X PT HAHD MADE
8.4E8 e3'O" O/C
a
u
r
a
3XS PT BEAM
SV METAL ROOF
OVER TONGUE 4 GROOVE
PEEL 4 STICK UNDER 3/8" X T MIN.
4
METAL ROOFING LAG BOLT PO
ERY TRU85
Ee4��
(1i
Id' X
MIN.LAG
L
BOLT PEEVERY
BEAM AIMO
P08T
i11
N
Wa
d1
�
X
Q
X
0
8X8 PT �,__- 2-1/2" X 4" NOTCH �..! SXS PT
POET FOR 3" BEAM INTO
BX& BEAM SEE DETAILS POST
NNECTOR DETAIL 2
GABLE END VIEW 1/2" X 12' MIN,
LAG BOLT PER
1
EVERY TRUSS 4 BEAM
AND INTO POST
FROM BEAM
I
I 3kb AT
3X8 PT
BEAM
8X8 PT
1/2" X 12' MIN. BEAM
LAG BOLT FROM
3X8 BEAM INTO 8X8
BEAM HORIZONTAL 8X8 P
POST
SCALE N.T.S.
FeWd"Ancom 1035mw
2X8 TONGUE
3X8 PT CROWN 4 GROOVE FOR
ROOF SHEATHING
FASTENED W/16d
RING SHANK
'3k6 Ip7 1/T X 12' MIN.
LAG BOLT PER
EVERY BEAM AND
MTO P09T
8X8 PT
3XB PT BEAM BEAM
CLO6515RACE8
dD
Q
d3
G FT
141-011
e
1�11 Oe 4 0 d Oe
Boll
30"w X 30"w X I'4"d
POURED CONC. FOOTING
W THROUGH 8X8 PTPOSTSCALE: N.T.S.
c
CONNECTOR DETAIL 3 CONNECTOR DETAIL 4
I I I I
1/2" X 12' MIN. I 1 3X6 PT HAND I I
LAG BOLT FROM I I� MADE TRUSS -'I 1
SX8 BEAM DOWN I I
INTO SXS POST
I I �
�' II 8X8 PT
BEAM
3X8 PT BEAM
"I
BEAM
1 I I I
L JT L J
1/2" X 12' MIN, 1/2" X 12' MIN,
LAG BOLT FROM LAG BOLT PER
3X8 BEAM INTO SX8 EVERY TRUSS 4 BEAM
BEAM HORIZONTAL SX8 P AND INTO POST
P05T FROM BEAM
SCALE: N.T.6.1
OVERHEAD VIELU
1/2" X 12' MIN,
LAG BOLT PER
EVERY TRUSS 4 BEAM
SX8 PT
AND INTO POST
3X6 PT HAND
BEAM
FROM BEAM
MADE TRUSS
t
1/2" X 12' MIN,
1/2" X 12' MIN.
LAG BOLT FROM
LAG BOLT FROM
3X8 BEAM INTO SXS
SX8 BEAM DOWN
BEAM HORIZONTAL
INTO SX8 POST
NOTCHED
i
0
SXS PT
1
POST
3X8 PT
BEAM
1 1
SCALE: N.T.S.
9 1-
W w Ln
z o
w
LU
w s Z ® Q LL� LU ULW�J
(qZ�'Z a: Qt00
o-w N N
A In
V5LU waw 0)IN
Q O w m r
CD
In
¢UZO
ZJ a
� m
0I- W ® 3
Iy-
Fo�g
Ul
rn
_0
a o fit
U-i (} P
m
� Z
LL
ND A
3 • Z O
Z pIT,
Q
� IL of
OU
}
Q)
-1-' 0) n`
aN
0
.N
O
N
Cn
Lu
Lu
d
�c
Q
71
0
cQ
Q
� �
N m
= LL
Q
lU
�Lu
U
_�
N 0.
II--
w LL
0
O �} eo QL �
s &A u � r
FBC 2020, 1th EDITION
fbc 2020, TTH edition
RISK CATEGORY: II
BLDG CAT: VB
OCCUPANCY: R-3
EXPOSURE: C
INT, PRES, COEF: V- 0.18
BUILDING: ENCLOSED
U Q �
O
JOB" 21-0313
SHEET