Loading...
HomeMy WebLinkAboutSTRUCTURAL ENGINEERINGCommercial-Residential Structural Engineering, Inc. 10491 Six Mile Cypress Parkway, Ste 283 Fort Myers, Florida 33966 239.826.5989 September 1, 2021 Crowther Roofing, Inc. Attention: Mr. Travis Spenser 2543 Rockfill Road Fort Myers, Florida 33916 Re: Dune Walk by the Sea CRSE No. 21001.093 Dear Travis: Commercial-Residential Structural Engineering, Inc. (CRSE) is pleased to provide this report on the fastening requirements for the following roofing items for the building located at 7380 South Ocean Dr, Jensen Beach, Fl 34957. The following wind criteria and nominal components and cladding wind pressures were used to calculate the attachment for the following roof items: 7th Edition (2020) Florida Building Code and ASCE 7-16, Wind Speed 163 mph (Vult) and 126.3 mph (Vasd), Risk Category II, Exposure D, mean roof height 96-feet, and an Internal Pressure Coefficient: +/- 0.18 (Enclosed). Nominal Roof components and Cladding Pressures; Zone 1 is -78.0 psf, Zone 2 is -122.4 psf, and Zone 3 is - 166.8 psf. Zones 2 and 3 are defined as being a=5.5-feet and 2a=11-feet, measured from the edges and corners of the building; see the simplified wind schematic below. Nominal Wall Components and Cladding Pressures; Zone 4 is +53.3/-53.3 psf, and Zone 5 is +53.3/-97.7 psf. Zone 5 is defined as being a=5.5-feet, measured from the edges and corners of the building; see the simplified wind schematic below. 1. Petersen 0.032 aluminum 18-inch max (W) x 1.75-inch (H) Snap-Clad metal panel attached to the existing plywood deck using #10 wood screws (NOA 19-1028.15). The fasteners shall be corrosion resistant and penetrate the plywood roof deck 3/16-inch or three full threads beyond the material. The attachment of the panel clips to the plywood roof deck shall be as follows: The parapet roof has a roof angle is greater than 45-degrees, and shall be treated as a wall pressure, Zones 4 and 5. Zone 4 - Provide (2) fasteners per clip, with the clip spaced at 24-inches on center. Zone 5 - Provide (2) fasteners per clip, with the clip spaced at 20-inches on center. 2. Coping and Flashing 0.032 Top Aluminum Coping attachment to the existing wood blocking. All Zones - The coping shall be snapped down to the front 0.40 cleat and fastened at the back of the coping to the wood blocking with a #10x1-1/2-inch S.S screw with a self-sealing washer at 12-inches on center. The front cleat shall be fastened to the wood blocking with (2) 0.131x1-1/2-inch S.S. rink-shanked nails at 12-inches, placed on the front and top side of the wood blocking. 0.032 Bottom Flashing attachment to the existing wood framing and red iron. All Zones - The flashing shall be attached to the wood framing with 0.131x1-1/2-inch S.S. ring shanked nails and ¼-14 Blazer S.S. screws at 12-inches on center. Grant C. Girtman, P.E. President PE #57458, CA # 28397 Commercial-Residential Structural Engineering, Inc.