Loading...
HomeMy WebLinkAboutCreekside Lot 87-Sewer Conn.pdfg]UNIVERSAL�� ENGINEERING SCIENCES c%rz AVA INSPECTION RESULTS Inspecti Project: Address Permit No. O( /05-- O l tv Check one: XRegular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): L BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical I I Final Plumbing Final Mechanical Other Inspection Type: /%� Area Inspected/Code: / �./ S �_Q/ii��1 ( �{�j� Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved Mot Ready 3. 4. 5. 6. 7. Inspector's Name: �S Lic.#: /J'o 7 7 5r�5 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com