HomeMy WebLinkAboutCreekside Lot 3-Sewer Comn.pdf�31EKIGIWEER WG SCIENCES
INSPECTION RESULTS
Inspection Date: 9 — 16 `' a r Permit No.
Project: u(2Q
Address:
Check one:
XRegular Inspection:
D Reinspection Date of Initial Inspection:�—
Inspection Type Requested (check):
aUrwnvu/=Jrtuc-tuttAL 1
tCAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough-fn
Floor Rough -In
Rough -in
Steam Piping & Te
Wafl Rough -In
Stack Piping &Test
H W p;ping &Test
Ceiling Rough -In
Water Piping &Test
CHW pi in Test
"Panel/Feeder
Panel/Feeder
Gas Piping &Test
Cond. Piping & Tes
ervice/Ground
Storm Piping &TestInsulation
ppliance/Euit
FiWall
&Ceiling
ighting Protection
Equipment
�__.
Final Building Final Electrical Final Plumbing Final
Other Inspection Type:
Area Inspected/Code:
Inspection Results.2UP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments:
I.
2.
s.
4.
S.
6.
7.
J
Inspectors Name:
OFFICES THROUGHOUT FLORIDA
607 NVd Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 9243580 (fax)
www.teamgfa.com