Loading...
HomeMy WebLinkAboutCreekside Lot 3-Sewer Comn.pdf�31EKIGIWEER WG SCIENCES INSPECTION RESULTS Inspection Date: 9 — 16 `' a r Permit No. Project: u(2Q Address: Check one: XRegular Inspection: D Reinspection Date of Initial Inspection:�— Inspection Type Requested (check): aUrwnvu/=Jrtuc-tuttAL 1 tCAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough-fn Floor Rough -In Rough -in Steam Piping & Te Wafl Rough -In Stack Piping &Test H W p;ping &Test Ceiling Rough -In Water Piping &Test CHW pi in Test "Panel/Feeder Panel/Feeder Gas Piping &Test Cond. Piping & Tes ervice/Ground Storm Piping &TestInsulation ppliance/Euit FiWall &Ceiling ighting Protection Equipment �__. Final Building Final Electrical Final Plumbing Final Other Inspection Type: Area Inspected/Code: Inspection Results.2UP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: I. 2. s. 4. S. 6. 7. J Inspectors Name: OFFICES THROUGHOUT FLORIDA 607 NVd Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 9243580 (fax) www.teamgfa.com