Loading...
HomeMy WebLinkAboutCreekside Lot 3-Temp Toilet.pdfguwv E�z-&L_ ENGINEERING SCIENCES /crr3 INSPECTION RESULTS Inspection Date: Project: G Address: 3 "Y Check one: pl Regular Inspection: O Reinspection Date of Initial Inspection: Inspection Type Requested (check): Permit No. ';�< a J — n g,'�t 3 lb- 'Al -SUfLDM--/3T*UMRAI ELECTR►G4I PLUMBING ICAL Footing Underground Undergroundgh-In Stab Floor Rough -In Rough -In ing & Test Masonry Wall Rough -In Stack Piping & Testg RHWPip1ng&Test & TestWall/Ceiling Ceiling Rough -in Water Piping & Testng & TestFraming Panel/Feeder Gas Piping & Testing & TestStructural Service/Ground Storm Piping & Test Sheet Rock Appliance/Equipment I Fixtures vd�o V. Final Building I I Final Electrical I I Final Plumbing Final Mechanical Other Inspection Type: Area inspected/Code: -Y ,9 -7 Inspection Results:,XAP-Approved ❑ AE pproved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 2. 2. 3. 4. 5. 6. 7. InspectoesName:.t,ct,", 69,11!� Lic.i1: OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamefa.com