HomeMy WebLinkAboutCreekside- Lot 47o���NTr� • cFol�Os
g 2Universal
w
m
02Sciences
G
9`S TFSTING'Company
•
UES Project No: 3360.1800067.0000
Workorder No: 245707-1
Report Date: 09/23/2021
607 Northwest Commodity Cove, Port St. Lucie, FL 34986 - P: 772-924-3575 - F: 772-924-3580
In -Place Density Test Report
Client: D. R. Horton America's Builder
6123 Lyons Road
Coconut Creek, FL 33073
Project: CMT CREEKSIDE
Various Locations, Vero Beach, County, FL 32967
Area Tested: Lot 47- 3302 Trinity Cir, Fort Pierce, FL
34945
Material: Backfill
Reference Datum: 0 = Top of Final Grade
The tests below meet the 95% minimum compaction requirement.
UES Technician: Mark Rogers
Date Tested: 09/14/2021
Type of Test:
Field: ASTM D-6938 Nuclear Gauge Method
Laboratory: ASTM D1557 Modified Proctor
Maximum
Optimum
Field Dry
Field
Soil
Pass
Test
Density
Moisture
Density
Moisture
Compaction
or
No.
Location of Test
Range
(pcf)
(%)
(pcf)
(%)
(%)
Fail
1
Northside of pad
0-1 ft
118.6
10.8
115.9
10.5
98
Pass
2
Southside of pad
0-1 ft
118.6
10.8
114.7
10.5
97
Pass
3
Eastside of pad
0-1 ft
118.6
10.8
114.4
10.5
96
Pass
Remarks:
Permit # 2103-0833
Reviewed By
GFA International, Inc
FBPE Registry No.4930
\.`PSpOMINIC,Np� �%
NO 84146:!'*�
Q STATE OF <f/
Digitally signed by Thomas
D
Monta no:A0141000000017
818498DCD000019A3
Date: 2021.09.23 13:28:49
-04'00'
Thomas Dominic Montano
Branch Manager
STATE OF FLORIDA
Professional Engineer No. 84146
This item has been digitally signed and sealed by Thomas Dominic
Montano on the date adjacent to the seal. Printed copies of this
document are not considered signed and sealed and the signature
must be verified on any electronic copies.
The in -place density tests were performed within the foundation/building pad footprint of the referenced residential lot. The test results either meet or exceed
the requirements of the FHA/HUD manual and the current edition of the Florida Building Code for soil compaction. The Contractor is responsible for maintaining
the tested soil sub grade in the same condition that existed at the time UES performed the referenced density tests. UES is not responsible if the tested area is
altered from the approved condition at the time of testing.
To establish a mutual protection to Universal's clients, the Public and ourselves, all reports are submitted as confidential property of our clients and
authorization for publication of statements, conclusions or extracts from or regarding Universal's reports is reserved pending our written approval.
Page 1