Loading...
HomeMy WebLinkAboutCREEKSIDE LOT # 38 BUILDING FINAL.pdfg]UNIVERSALN ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: /�'� Permit No Project: C11 DPJj�,112, Address: 3 3 o Check one: Regular Inspection: ❑ Reinspection JO/ 1 _O LY_9 Date of Initial Inspection: ( C;� U `a Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structura. Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: �9� ►J� �C �lfiLt Inspection Results: AP -Approved ❑ AE-�oved with Exceptions DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: Lic.#: f3k / S ❑ DA-Disallowed v OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com