HomeMy WebLinkAboutFiberglass Step Anchoring GuidelinesFjWrqIk$9 ftp Arichoding
Guldelth"
CoriormlIn6tallation
List of t±otrnts (PUrtitlesed ):,may}:
-2 W424 Bile.:
1) DiM Ile. holb, step kIabracket at
2) Inawt L using Wx2Ox2Ye'
3) Mark location of hole is L-bti&A on the
4) Move the 9" away fiom the house. Drill
holes in concrete at d* desired locations.
Tap in W emetM arwhors,
s) Replace MP so Ow the tops of ft concrete
anchors prouude- thrmgh the t-braekeu.
se,eure wish the trots and washem
H
54AMWrAssenibl
ka assembly Mudes.
I) 7AW'X I Ye VMS19w
ijt�d Imtslleston.
Sd dap in dWzed VwIlm and mark he
*Wj*V placeomh An do St,6" Remove
in. M go- dmt the
And'nW& Im pWeO&wt the:
:Oep gi the hei& of the Imisr frame
4 -Fs, aez aw lum I ftw member
"a Ottha itd-or aw)kasber.
WA MG: Faipw.r 5wP Promly
caa result in Wur6ftp pnFAw
house, Mao sure the shc M W!04*,AhG kep
Teds is level.
StY16 Cred14 YAC; DMWer A
Ohio 4MO
I