Loading...
HomeMy WebLinkAboutCreekside Lot 114-Frameall NR.pdf®UNIVERSAL ENGINEERING SCIENCES Inspection Date: Project: Address: Check one: Regular Inspection: INSPECTION RESULTS d 6 - 9� / Permit No. L03-59�37 ElReinspection Date of Initial Inspection: f Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: _ Area Inspected/Code: Inspection Results: ❑ AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved IgNot Ready 1. 2. 3. 4. 5. 6. 7. Inspector's Name: Lic.#: r3l 3 ✓r L_ J OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com