Loading...
HomeMy WebLinkAboutCaruso Pile Logs133 MATERIAL TESTING ENGINEERING 3111 E s s c n c e o f Per f e c Lion 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773-5871/5889 - Fax. 786.615-5801 August 9, 2021 Project No. 21-0410 Bodax Foundations, Inc. 1101 NW 55th Street Ft Lauderdale, FL 33309 Re.: Auger Cast Pile monitoring for the Caruso Residence House. 4805 Watersong Way Drive, Fort Pierce, 34949. Dear Sir, Pursuant to your request, BIII MATERIAL TESTING ENGINEERING, LLC. conducted Auger Cast Pile monitoring for the above -referenced location on July 30, 2021. The work involved the installation of twenty-six (26), 14" diameter cast in place piles installed. The approximate grout volume used was 1374.45 c.f. (50.90) yards). Attached monitoring logs, as well as the sketch showing the location of piles, are enclosed along with this letter. We appreciate the opportunity to have been of service to your company. Please feel free to contact us if there is any question or comments pertaining to this letter. su'bmi 'Dariq of"rero,,,P?���e� Ftorida RO.9;,#67�96�) .' BIII'W'tefi*T-Ofing� ngineering, LLC. Page 1 1 4 R3 MATERIAL TESTING ENGINEERING 3111 E s s e n c e o f P o r f c c I ion 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773-5871/5889 - Fax. 786.615-5801 A JGERL D CAST PILE LOG Page 214 B3 MATERIAL TESTING ENGINEERING r E3 III 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES 133 PROJECT NO. 21-0410 DATE 30-Jul-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 Michael Assam WEATHER Sunny TIME JOB STARTED 9:30 AM TIME JOB FINISHED 5:45 PM PROJECT ADDRESS Caruso Residence (House) 4805 Watersong Way, Ft.Pierce 34949 AUGERCAST PILES LOG 1 Columns No. 1 2 3 4 5 6 7 8 9 10 2 Pile No. 6 1 2 7 4 3 10 16 22 26 3 Augered 0 (inches) 14 14 14 14 14 14 14 14 14 14 4 Pile Length (feet) 26 26 26 26 26 26 26 26 26 26 5 Theoretical Pile Volume (cf) 27.8 27.8 27.8 27.8 27.8 27.8 27.8 27.8 27.8 27.8 6 Number of pump strokes 50 51 52 51 49 51 48 42 52 52 7 Volume per Pump Strokes (co 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 8 Actual Grout Volume (cf), (6*7) 52.5 53.6 54.6 53.6 51.5 53.6 50.4 44.1 54.6 54.6 9 Volume Ratio (cf), (815) 1.89 1.93 1.96 1.93 1.85 1.93 1.81 1.59 1.96 1.96 10 Reinforcing Size 6#6 6#6 6#6 6#6 6#6 6#6 6#6 6#6 6#6 6#6 11 Reinforcing Length (ft) 26 26 26 26 26 26 26 26 26 26 12 Grout Truck Number 8002 8002 8002 8002 7008 7008 I I 7008 7008 - LZI 8001 - Pump calibration date: Pump calibration strokes: 1.05 (cf. per strokes) * House; 26 piles in total ; 6#6 with #3 ties @ 6" o.c. Full w/ hooks. conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except irrfGl�,N i $the riot Written approval for B3 Material Testing Engineering, L-C. ,;kr 4 133 MATERIAL TESTING ENGINEERING {- . r t' ,,f !, , f , -. i I '� 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES E3 PROJECT NO. 21-0410 DATE 30-Jul-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 Michael Assam WEATHER Sunny TIME JOB STARTED 9:30 AM ITIME JOB FINISHED 5:45 PM PROJECT ADDRESS Caruso Residence (House) 4805 Watersong Way, Ft.Pierce 34949 AUGERCAST PILES LOG 1 Columns No. 11 12 13 14 15 16 17 18 19 20 2 Pile No. 25 24 23 18 20 19 21 17 11 12 3 Augered 0 (inches) 14 14 14 14 14 14 14 14 14 14 4 Pile Length (feet) 26 26 26 26 26 26 26 26 26 26 5 Theoretical Pile Volume (cf) 27.8 27.8 27.8 27.8 27.8 27.8 27.8 27.8 27.8 27.8 6 Number of pump strokes 52 52 52 51 51 52 52 49 51 48 7 Volume per Pump Strokes (cf) 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 8 Actual Grout Volume (cf), (6*7) 54.6 54.6 54.6 53.6 53.6 54.6 54.6 51.5 53.6 50.4 9 Volume Ratio (cf), (815) 1.96 1.96 1.96 1.93 1.93 1.96 1.96 1.85 1.93 1.81 10 Reinforcing Size 6#6 6#6 6#6 6#6 6#6 6#6 6#6 6#6 6#6 6#6 11 Reinforcing Length (ft) 26 26 26 26 26 26 26 26 26 26 12 Grout Truck Number 8001 1 8001 8001 4009 4009 4009 4009 7001 7001 7001 Pump calibration date: Pump calibration strokes: 1.05 (cf. per strokes) * House; 26 piles in total ; 6#6 with #3 ties @ 6" o.c. Full w/ hooks. Field Rep. David C especttully 5u= As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential propertyof clients; and dutl�bOatio i for, p conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced,<ezcept1a full vyithput 46 Material Testing Engineering, LLC. =,�f '<,p _; •, 1 .e3 Afr�� tion of statements, written approval for 83 B3 MATERIAL TESTING ENGINEERING 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773.5871/89 - Fax. 786.615.5801 REPORT OF AUGERED CAST IN PLACE PILES B3 PROJECT NO. 21-0410 DATE 30-Jul-21 CLIENT ADDRESS CONTACT Bodax Foundations 1101 NW 55th Street. Fort Lauderdale, FL 33309 Michael Assam WEATHER Sunny TIME JOB STARTED 9:30 AM TIME JOB FINISHED 5:45 PM PROJECT ADDRESS Caruso Residence (House) 4805 Watersong Way, Ft.Pierce 34949 AUGERCAST PILES LOG 1 Columns No. 21 22 23 24 25 26 2 Pile No. 13 14 9 5 15 8 3 Augered 0 (inches) 14 14 14 14 14 14 4 Pile Length (feet) 26 26 26 26 26 26 5 Theoretical Pile Volume (cf) 27.8 27.8 27.8 27.8 27.8 27,8 6 Number of pump strokes 42 52 52 52 51 52 7 Volume per Pump Strokes (co 1.05 1.05 1.05 1.05 1.05 1.05 8 Actual Grout Volume (cf), (6*7) 44.1 54.6 54.6 54.6 53.6 54.6 9 Volume Ratio (cf), (815) 1.59 1.96 1.96 1.96 1.93 1.96 10 Reinforcing Size 6#6 6#6 6#6 6#6 6#6 6#6 11 Reinforcing Length (ft) 26 26 26 26 26 26 12 Grout Truck Number 7001 7005 7005 7005 7005 Pump calibration date: Pump calibration strokes: 1.05 (cf. per strokes) * House; 26 piles in total ; 6#6 with #3 ties @ 6" o.c. Full w/ hooks. Respectfully Submitted; Field Rep.: David C la..h . 196 As a mutual protection to client, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publff '* on of staterflenZ's,' •., conclusions or extracts from our reports is reserved. In accordance with ASTM E329 this report shall not be reproduced, except in full without the prior Vjittp%afi rovl � r B3` Material Testing Engineering, LLC. `"" "y _ B3 MATERIAL TESTING ENGINEERING 3111 E s s n c e c.> f P e r ( c. c I i o n 1676 West 31 PL., Hialeah FL, 33012 - Off. 786.773-5871/5889 - Fax. 786.615-5801 SATE SKETCH Page314 El a 5MARSEE, .0�� U.E�r ---- - ----- PIZ- EN-L.-OGED INTERS C ON �E-Ajjl�F!ILE ENLARGE. SCAMIPMq PILE DETAIL N,S,6,�