Loading...
HomeMy WebLinkAboutCOMPACTION TEST()ederai Phone: 954-784-2941 E-Fax: 954-784-7875 Q ngineering admin@fed-eng.com www.fed-eng.com (Poesting, Inc. Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Date: September 17, 2021 Address: 509 N. 43rd Street, Fort Pierce. FL 34947 Area Tested: Buildinq Pad Material Type: Dark Brown Sand with Traces of Rock Company: Groza Builders, Inc. Address: 511 SW Port St. Lucie Blvd. Port St. Lucie, FL 34953 Order #: Permit #: Tech: 21 CMT2839 GD Compaction Req.: 95% Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 NE Corner of Pad 12" FL 14.1 106.5 108.0 12.0 98.6% Yes 2 NW Corner of Pad 12" FL 13.4 108.9 108.0 1 12.0 100.8% Yes 3 SE Corner of Pad 12" FL 10.5 105.7 108.0 12.0 97.9% Yes 4 SW Corner of Pad 12" FL 13.8 108.2 108.0 12.0 100.2% Yes 5 6 7 8 9 10 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil Bearing Capacity. Legend for Elevation: PR = Proofroll 1,2,3 = 1 st, 2nd, 3rd Lift Submitted by: / � J SL = Springline FL = Final Lift Keith LeBlanc, P.E SG = Subgrade BG = Below Grade Federal Eng'.neerir:g & Testing, Inc. BC = Basecourse BOF = Bottom of Footing Florida Rea. No. 59394 TOP = Top of Pipe FG = Finished Grade Certificate of Autnorization #5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of c;;ents, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of-ompaction of the tested lay-.r of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materiais below the proposed structure. l he results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the'proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evawa% the 5uitatdlity of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2