HomeMy WebLinkAboutCREEKSIDE LOT 46 BLDG FINAL.pdf®UNIVERSAL®
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: d 7 Permit No. 00 - C) % R/
Project:
Address:
Check one:
Regular Inspection: 9' d /n� 7 - a/
ElReinspection Date of Initial Inspection: _
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Dud Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
rvice/Ground
Storm Piping & Test
Insulation
Sheet Rock
pliance/Equipment
Fixtures
Wall & Ceiling
Roofing
hting Protection
JFinal
Equipment
Equipment
Re -inspection
-inspection
Re -inspection
Re -inspection
Final Building
Electrical
Final Plumbing
Final Mechanical
Other Inspection Type: Area Inspected/Code: 9 ! M&
Inspection Results: AP -Approved ❑ AE-Appr d with Exceptions ❑ DA-Disallowed
DP-sfDlssapp/roved ❑ Not Ready
Conditions/Comments: LL2� c T ti 5��� ti — r 1��wh 45 /e—may +c
r a�
1.
2. Pg rc
3.
4.
5.
6.
7.
Inspector's Name:
jc�
Lic.#: BN5599- 77 y y
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com