HomeMy WebLinkAboutHi-Tide - Cuda Gear - 9,000 Lb. Drawing .pdfENGINEERING REVIEW. -
BOAT LIFT TOP CARRIER BEAMS AND
MOUNTING BRACKETS COMPLY WITh
WIND LOAD REQUIREMENTS OF THE
7TH EDITION (2020) FLORIDA BUILDING
CODE, PER ASCE 7-16, AND PER DESIGN
LOAD REQUIREMENTS OF THE 2015
EDITION ALUMINUM ASSOC/AT/nN's
ALUMINUM DESIGN MAN
BEAMS AND MOUNTING BRAC
INSTALLED PER HI —TIDE INSTRUCTION
EXCEED ULTIMATE DESIGN WIND SPE
200 MPH (EXPOSURE CATEGORY C
BOATS ARE TO BE REMOVED FROM I
LIFTS PRIOR TO A MAJOR WIND EI/
PILINGS. -
PILING PENETRATION TO BE 10'
INTO THE SAND BOTTOM OR 5'
INTO ROCK STRATA,
SUB —SURFACE CONDITIONS CAN
VARY GREATLY, THE CONTRACTOR
SHALL VERIFY ALL PILE
CAPACITIES TO COMPLY WITH
2020 FBC. ALL PILINGS TO BE
8" MINIMUM DIAMETER
2.5 C. C. A PRESSURE TREATED
WOOD, PRE —STRESSED CONCRETE
OR COMPARABLE EQUIVALENT.
ELECTRICAL REVIEW.•
112 HP ELECTRIC MOTOR
8.8 AMPS O 115V EACH
4.4 AMPS @ 230V EACH
QUANTITY- 2
TOTAL WATTS. 2024
Digitally signed by Roger M
NOTE TO EXAM/NER:
7I
BABER
THIS CERTIFIED ENGINEERED
DRAWING HAS BEEN PREPARED
/"`
ogerBaber,P.E.
EngceersdbSustainableEarth
EngineersdbaMCREngineers,
ou=A01410D0000017183ADA33
SPECIFICALLY FOR USE ONLY BK
C00001860, cn=Roger M BABER
WILCO CONST.
Date: 2021.08.12 15:20:34-04'00'
°n n nnnnn YO°°p0 p°
o°oo° R m e o0001
O 0 C E !y 8 ® ��� o
O v F F o
" NO.43855
C
STATE OF 41 o
0
O P AS Al OR ®� ��
00000 8 °pONa Aoono
ROGER BABER
P.E. NO. 43855
CR PROFESSIONAL ENGINEERING
2430 NE DIXIE HWY
✓ENSEN BEACH, FL 34957
ING MOUNTING TABS
MUM (2) 3/8" DIA. SS LAG
TS FOR WOOD PILING OR
CONCRETE ANCHORS FOR
CRETE PILINGS PER PILING
IUIRED.MINIMUM (2) 3/8"
SS CARRIAGE BOLT FOR
Ail iACH/NG MOUNTING TAB TO
LIFT REQUIRED PER PILING.
MOUNTING TAB CONSTRUCTED
FROM 114" X 2" ALUMINUM
6 0 6 1— T 6 FLAT BAR.
9,000 LB. CODA GEAR BOATLIFTS AND MARINE PRODUCTS
BOAT LIFT (2020 FBC) �� L
4050 SELVITZ ROAD
FORT PIERCE, FL J4981
R. HYDE SCALE. NTS DATE: 114121 REV.• 1 1-800-544-0735 www.hi—tide.com
DESCMP77ON