Loading...
HomeMy WebLinkAboutHi-Tide - Cuda Gear - 9,000 Lb. Drawing .pdfENGINEERING REVIEW. - BOAT LIFT TOP CARRIER BEAMS AND MOUNTING BRACKETS COMPLY WITh WIND LOAD REQUIREMENTS OF THE 7TH EDITION (2020) FLORIDA BUILDING CODE, PER ASCE 7-16, AND PER DESIGN LOAD REQUIREMENTS OF THE 2015 EDITION ALUMINUM ASSOC/AT/nN's ALUMINUM DESIGN MAN BEAMS AND MOUNTING BRAC INSTALLED PER HI —TIDE INSTRUCTION EXCEED ULTIMATE DESIGN WIND SPE 200 MPH (EXPOSURE CATEGORY C BOATS ARE TO BE REMOVED FROM I LIFTS PRIOR TO A MAJOR WIND EI/ PILINGS. - PILING PENETRATION TO BE 10' INTO THE SAND BOTTOM OR 5' INTO ROCK STRATA, SUB —SURFACE CONDITIONS CAN VARY GREATLY, THE CONTRACTOR SHALL VERIFY ALL PILE CAPACITIES TO COMPLY WITH 2020 FBC. ALL PILINGS TO BE 8" MINIMUM DIAMETER 2.5 C. C. A PRESSURE TREATED WOOD, PRE —STRESSED CONCRETE OR COMPARABLE EQUIVALENT. ELECTRICAL REVIEW.• 112 HP ELECTRIC MOTOR 8.8 AMPS O 115V EACH 4.4 AMPS @ 230V EACH QUANTITY- 2 TOTAL WATTS. 2024 Digitally signed by Roger M NOTE TO EXAM/NER: 7I BABER THIS CERTIFIED ENGINEERED DRAWING HAS BEEN PREPARED /"` ogerBaber,P.E. EngceersdbSustainableEarth EngineersdbaMCREngineers, ou=A01410D0000017183ADA33 SPECIFICALLY FOR USE ONLY BK C00001860, cn=Roger M BABER WILCO CONST. Date: 2021.08.12 15:20:34-04'00' °n n nnnnn YO°°p0 p° o°oo° R m e o0001 O 0 C E !y 8 ® ��� o O v F F o " NO.43855 C STATE OF 41 o 0 O P AS Al OR ®� �� 00000 8 °pONa Aoono ROGER BABER P.E. NO. 43855 CR PROFESSIONAL ENGINEERING 2430 NE DIXIE HWY ✓ENSEN BEACH, FL 34957 ING MOUNTING TABS MUM (2) 3/8" DIA. SS LAG TS FOR WOOD PILING OR CONCRETE ANCHORS FOR CRETE PILINGS PER PILING IUIRED.MINIMUM (2) 3/8" SS CARRIAGE BOLT FOR Ail iACH/NG MOUNTING TAB TO LIFT REQUIRED PER PILING. MOUNTING TAB CONSTRUCTED FROM 114" X 2" ALUMINUM 6 0 6 1— T 6 FLAT BAR. 9,000 LB. CODA GEAR BOATLIFTS AND MARINE PRODUCTS BOAT LIFT (2020 FBC) �� L 4050 SELVITZ ROAD FORT PIERCE, FL J4981 R. HYDE SCALE. NTS DATE: 114121 REV.• 1 1-800-544-0735 www.hi—tide.com DESCMP77ON