Loading...
HomeMy WebLinkAboutCreekside Lot 7 Eufer.pdfERGIREERIl O SCIENCES 7 INSPECTION RESULTS Inspection Date: 7(-'�,( p� / Permit No. a lQ 7_ o 9 7) Project: Address:.3 3 a Check one: XRegular Inspection: ❑ Reinspection Date of Initial Inspection: 7-.? ,a / Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING Gnc. i ..... Slab Structural Sheet Rock Final - Floor Rough -In ......c.Js.vuuu Rough -In Duct Rough -In Wail Rough -In Stack Piping &Test Steam Piping & Test HW Piping & Test Ceiling Rough -In Water Piping & Test CHW Piping & Test Panel/Feeder iervice/Ground Gas Piping & Test Storm Piping & Test Cond. Piping & Test 1ppliance/Equipment Fixtures Insulation Wall & Ceiiin ighting Protection g Final Electrical I TFinal Other Inspection Type: Area Inspected/Code: 42 3 L' Inspection Resuits4VP-Approved ❑ AE-Approved with Exceptions 0 DP -Disapproved Q Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: Lic.#:A,A) y95 5" Final ❑ DA-Disallowed OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com