HomeMy WebLinkAboutCreekside Lot 13-Bond Beam.pdf®UNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: / — ;� ` - Permit No. L T p 9 / o
Project:
Address:
'Check one:
j( Regular Inspection:
❑ Reinspection
Date of Initial Inspection: - or / - .9- /
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Dud Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type
Area Inspected/Code:
r
Inspection ResultsAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments
1.
2.
3.
4.
5.
6.
7.
/_
Q z
Inspector's Name: L� 6 9uLic.#: nmo f3 /J ! 7 J� J
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com