Loading...
HomeMy WebLinkAboutCreekside Lot 85-Sewer Conn.pdfA Universal Engineering Sciences Company Inspecti, Project: Address INSPECTION RESULTS Permit No. a10 5 _ o 307 Check one: )( Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type Area Inspected/Code: � 5 S0-t:f Inspection ResuA-AP-Approved ElAE-Approved with Exceptions ElDA-Disallowed P-/Disapproved El Not Ready is Conditions/Comments: ✓ C5 S' 1. 2. 3. 4. 5. 6. 7. Inspector's Name: 4/0 '�+i�K� Lic.#: 0r 7 � Y -2 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com