HomeMy WebLinkAboutCreekside Lot 85-Sewer Conn.pdfA Universal
Engineering
Sciences
Company
Inspecti,
Project:
Address
INSPECTION RESULTS
Permit No.
a10 5 _ o 307
Check one:
)( Regular Inspection:
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type
Area Inspected/Code: � 5 S0-t:f
Inspection ResuA-AP-Approved ElAE-Approved with Exceptions ElDA-Disallowed
P-/Disapproved El Not Ready
is
Conditions/Comments: ✓ C5 S'
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: 4/0 '�+i�K� Lic.#: 0r 7 � Y -2
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com