HomeMy WebLinkAboutFire Approval pg1Supply Flow Test Data
Test Conducted By
Fort Pierce Utilities
Date of Test
10272020
Time of Test
9:10 AM
Static Pressure
70.000
Residual Pressure:
60.000
Flow
1125.00
NORTH
FIRE SPRINKLER GENERAL NOTES
DESIGN CRITERIA
FIRE SPRINKLER SITE PLAN
DESIGN, FABRICATION AND INSTALLATION SHALL CONFORM TO NFPA-13 (2016 EDITION) AND THE FLORIDA FIRE PREVENTION CODE.
UNDERGROUND SUPPLY PIPING TO BE INSTALLED IN ACCORCANCE WITH NFPA-24
OCCUPANCY:
PER NFPA-13, TABLE 16.2.1.3.2 DEMAND .30 GPM / 2000 SQ.FT. HOSE 500 GPM. CLASS 1 COMMODITY, MAX. STORAGE HEIGHT 20'
WITHIN SINGLE OR DOUBLE ROW RACKS WITHOUT SOLID SHELVES WITH 8' AISLE WIDTH.
NITRILE HOSES DESIGNED PER NFPA-13., TABLE 13.2.1 DEMAND .30 12000 SQ.FT. HOSE 500 GPM. MAX HOSE STORAGE HEIGHT 6'.
ALLOWANCE FOR MISCELLANEOUS STORAGE OF TIRES STORED ON SIDES TO A MAXIMUM OF 12'.
BUILDING CONSTRUCTION
ROOF CONSTRUCTION IS METAL BEAM & BAR JOIST WITH METAL DECK. CEILING IS FLAT ACOUSTIC TILE & GYP, BOARD.
CONSTRUCTION IS UNOBSTRUCTED. THE DISTANCE BETWEEN THE SPRINKLER DEFLECTOR AND THE CEILING IS TO BE 1 TO 12 INCHES.
MATERIALS
ALL MATERIALS ARE TO BE NEW UL LISTED AND IN ACCORDANCE WITH NFPA-13.
ALL THREADED TYPE FITTINGS TO BE 300 PSI DUCTILE IRON.
GROOVED FITTINGS ARE TO BE UL LISTED AND RATED FOR 175 PSI SERVICE.
PIPING WITH WELDED OUTLETS IS UL LISTED SCHEDULE -10
THREADED PIPING IS SCH.- 40
OUTLETS ON SCHEDULE -10 PIPING ARE TO BE WELDED OR MECHANICAL TEE, UL LISTED AND PER NFPA-13.
ALL HANGER ARE TO BE UL LISTED AND INSTALLED IN ACCORDANCE WITH NFPA-13
ALL DEVICES ARE TO BE UL LISTED AND INSTALLED PER MANUFACTURES LISTINGS AND NFPA-13
COMPLETION AND TESTING REQUIREMENTS
ALL SUPPLY PIPING IS TO BE TESTED AND FLUSHED BEFORE CONNECTION TO OVERHEAD PIPING.
THE ENTIRE SYSTEM SHALL BE TESTEDAT 200 PSI FOR 2 HOURS.
ALL THE REQUIREMENTS OF NFPA-13 CHAPTER 16 "SYSTEM ACCEPTANCE" SHALL BE COMPLETED
ALL EQUIPMENT IDENTIFICATION SIGN'S SHALL BE INSTALLED AS REQUIRED BY NFPA-13
TAMPER AND FLOW SWITCHES ARE TO BE PROVIDED AND INSTALLED. ALL ELECTRICAL CONNECTIONS AND ALARM PANELS ARE BY OTHERS.
8" SUPPLY PIPING
(BY OTHERS)
CONNECTION TO 6" DDC BACKFLOW
6" FIRE SPRINKLER RISER
2" TEST & DRAIN VALVE
FLOW SWITCH
6' SUPPLY TO F.D.C.
FIRE SPRINKLER RISER DETAIL
AfS-21 -0)0(0
ST. LUCIE COUNTY FIRE DISTRICT
FIRE MARSHALS OFFICE
REVIEWED ANDZ#�PR
REVIEWED BY:
DATE: _ & _a
SUMMIT DESIGN & FORENSICS
725 SE PORT ST. LUCIE BLVD. SUITE 203
PORT ST. LUCIE, FL 34984
BRIAN MASKOL P.E.
P.E.#66080 - (772) 285-0572
W
N
.J
Y
LL
z
O
�
r
cn
=
W
U)
N
o
Q
M
QO
N
lzo-
�
Q
W
H
O
Wl
�
O
ti
i
�
w.
cu
ay,
---
O
Q✓
O
O
ram.
1:
0
_
ZV
4z
w
f V/ W
LWu U
I —
X CC
aN
a
_J
F—
z W
O z
F— ar
IL W
U
C�
W I— z
p
a
W
o 1)
u- cn
w Q)
U
W T T
4 4 C7
D Q Lo
W
N
Iq
U o:
o c(o
c o
u
N
T
J
W m U
Q m z cn
Q
z
o
W
CD
Z)
O
W
Q J 0
-S w IY p
W z —1
LL
U � Y
LU 0
LL a w
O w
IM
LL
J
O