Loading...
HomeMy WebLinkAboutProctor Compaction TestF G RECEIVED Futo A ENGINEERING & TESTING, INC. APR 0 4 2010 Phone: (866) 781-6889 *Fax: (866) 784-8550 wtiv`t Aoridaengincex ingandtesting.com RECEIVED Permitting Department 250 S.W.120' Avenue St. Lucie County Pompano Beach, FL 33069 APR 0 4.1010 PROCTOR COMPACTION TEST B , -RED: 3/7/2018 DATE TESTED: 3/14/2018 ORDER #: 18-1199 �- CLIENT: Fountain Blue Pools ADDRESS: 2731 Vista Parkway Suite D-1 West Palm Beach, Florida 33411 PROJECT: Proposed Pool Deck ADDRESS: 3010 N.W. Radcliffe Way Palm City, Florida MATERIAL DESCRIPTION: Brown Fine Sand SAMPLED BY: P.N. TESTED BY: P.T. SPECIFICATION GOVERNING: ASTM D-1557, Method C LAB NO: P-1199 RESULTS OF TEST: The following compaction test was conducted in accordance with the Standard Methods of Moisture Density Relations of soil using a 10 lb. Hammer and an 18" drop as per the above specified method. MOISTURE % 8.2 10.2 12.6 14.6 Optimum Moisture (Percentage): 11.8 % Maximum Dry Density (Ibs./cu.ft.) 107.2 (PCF) Respectfully Su Florida Engir Florida Reg. Certificate of s As a mutual protection to clients, statements, conclusions or extracts WET DENSITY (PCF 1111l11//�/ ,LAN z 10.48202. '.0 s iglnc., t �f Z 112.4 117.6 120.5 119.1 LL U N z w in DRY DENSITY (PCF) 103.9 106.7 107.0 103.9 7 8 9 10 11 12 13 14 15 MOISTURE % ev- s, all reports are submitted as the confidential property of clients, and authorization for publication of our reports is reserved pending our written approval. Y� Qualityze-���� 1-11�./lsirance qt t)50l ENGINEERING & TESTING, INC. Phone: (866) 781-6889 •Fax: (866) 784-8550 www.floiidagnp-ineeringandtesting.corn 250 S.W.13th Avenue Pompano Beach, FL 33069 REPORT OF FIELD COMPACTION TESTS DATE: 3/19/18 ORDER NO: 18-1200 PERMIT NO. CLIENT: Fountain Blue Pools ADDRESS: 2731 Vista Parkway West Palm Beach, Florida 33411 PROJECT: Proposed Pool Deck Lot 004 Riverbend ADDRESS: 3010 N W Radcliffe Way Palm City, Florida MATERIAL DESCRIPTION: Brown Fine Sand PROCTOR VALUE (PCF): 107.2 OPTIMUM MOISTURE (%): 11.8 % COMPACTION REQ'D BY SPECS: 95 LABORATORY NO: P-1199 NUCLEAR GAUGE SERIAL #: ❑ 29793 (Model 3440) ® 533 (Model 3450) ❑ 20500 (Model 3440) PROCTOR METHOD: ® ASTM D-1557 ❑ ASTM-D698' ❑ AASHTO T-180 ❑ AASHTO T-99 ASTM D 6938 METHOD A Test # Location: Lift Elev./ Depth of Test Dry Density CF Penetro- meter Readings Moisture (°�u) Percent Compaction (%) Pass/ Fail 1 N. Side of Pool Final 6" 104.0 45 6.1 97.0 P 2 N. Side of Pool ist 6" --- 45 --- >95* P 3 E. Side of Pool Final 6" 103.8 45 7.7 96.8 P A E. Side of Pool 1st 6" --- 45 --- >95X P 5 W. Side of Pool Final 1 6" 104.5 45 7.6 97.5 P 6 W. Side of Pool 1st 6" --- 45 --- >95X P 7 8 9 10 Compaction percentage estimated from cone penetrometer reading obtained with a Brainard-Kilman Model S-214 hand-held cone penetrometer. REMARKS: TESTED BY: P.N. CHECKED BY: P.T. Notes: Method A - Direct Transmission unless otherwise noted. PR - Proof Roll BOF - Bottom of Footing TOB - Top of Base SG - Subgrade SOG - Slab on Grade As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. �s s 1�Qr lU Qualify , *�1L�#,, .Iamirance Respectfully submitted, MARK A. MESIANO, P.E. Florida Engineering & Testing, Inc. Florida Reg. No. 48202 Certificate of Authorization No. 6923