Loading...
HomeMy WebLinkAboutWithers_res_Cad plan-S-2_1 FRMG DET5"xlb" BOND BEAM (PER G SCHEDULE) — — — — — — — — J� °f °� PRECAST LINT EL. LINTEL. 1 J� °I • FILL COLUMNS AND LINTEL SOLID 1 W/ GROUT 1 J I r 8"x8" FILLED CELLS W/1#5 VERT. (TYP) TYP. DET. LINTEL ON COLUMN 3/4" = 1'-0" BREAK AWAY 510E OF — o MASONRY COLUMN FOR ccr J • GONTI NUOU5 POUR 1 L °.I I° SEE BEAM 5GHEDULE FOR REINFORCEMENT 'il; •I•. I I. .Ip •I P'. om -. I al I EXTE TOP BAR 4 HOOK INTO SECOND CELL e"xe" FILLED CELLS FILL COLUMNS SOLID 5EE PLAN AND COLUMN 5GHEDULE FOR REINF. WPEA GRAVEL CONCRETE TYP. CHANGE IN BOND BM. HT. 5/411 = 1'-0" SEE BEAM AND COLUMN 5EE PLAN L SCHEDULES FOR REINFORCING SIZES TYPICAL. u CARRY BEAM ONTO TOTAL COLUMN WIDTH TYPICAL CONC. BEAM FRAMING INTO COLUMN PROVIDE #5 CORNER BARx30 "x30" FOR EACH TOP BAR BREAK AWAY 51DE OF MASONRY COLUMN FOR CONTINUOUS POUR SEE BEAM 50HEDULE FOR REINFORCEMENT ,1 .I I . I° I N° fl LU m EXTEND TOP BAR 8 J HOOK INTO SECOND CELL 5"x5" FILLED CELLS FILL COLUMNS SOLID SEE PLAN AND COLUMN W/ PEA -MIX CONCRETE SCHEDULE FOR REINF. TYP. CHANGE IN TIE BM. HT. 3/411 = 1'-0" 5"x5" FILLED OPENIN05 <= 6-0": CELLS SEE PLAN PROVIDE b"XS" MIN. AND COLUMN BOND BEAM COURSE 50HEDULE FOR I W/ 145 MID. OR REINF dl 5"XS" MIN. FORMED MASONRY GONG. SILL W/ 245 MASONRY OPENING MID. WALL `I OPENINGS > 6-0": PROVIDE b"XS" MIN. BREAK AWAY SIDE BOND BEAM COURSE OF MASONRY l z° W/ 245 MID. OR COLUMN FOR J 8"X5" MIN. FORMED CONTINUOUS POUR 1 ° GONG. SILL W/ 245 I° I° MID. PROVIDE b" MIN. I PROVIDE b"x8" PENETRATION EA. I ° 48" MAX FILLED CELLS W/ END 6 TIED TO �C J 1-#5 VERT. DOWEL VERT. REINF. .a a° W/ 57D. AGI HOOK I -- Tr----�— a=---�---�—T—�—r—, EA. END ®4'-011 ° I ° FOUNDATION OR ° < ° I 1 °°. O/C WHEN OPENING INTERMEDIATE a '� °� ° EXCEEDS 4'-0" BEAM --��------===--�--- �_�--- WIDE SILL REINF. AT MASONRY OPENINGS (TYP.) 3/411 = 1'-0" T.O.T.B. ,° ' 1 CONCRETE TIE -BEAM SEE TIE BEAM 50HEDULE 0,14 4 J° HIGH STRENGTH PRECAST LINTEL W/REINFORCING AS REOD. SEE LINTEL 50HEDULE COLUMNS BEYOND SEE FOUNDATION PLAN TYP. DET. LINTEL W/TIE BEAM 3/411 = 1'-0" MA5ONRY. PROVIDE PREFAB. "L" _ JOINT REINFORCING AT ALL CORNER5 PLAN VIEW SPRN 1 SPRN 2 SPRN 3 CANT'L 1/4 1/4 1/4 1/4 1/2 S1 S1 S2 S2 S3 G' BA (END) TOP EAR TOP BAR T P BA BTM. BAR 6"MIN. 15EE BTM. BAR 'E' BAR NO E 10 ON COVER BEAM NOTES BTM. BAR 'E' BAR HOOPS OR STIRRUPS SPACED FROM SUPPORT HOOPS OR STIRRUPS FACE A5 50HEDULED SPACED FROM SUPPORT FACE AS 50HEDULED BENDING DIAGRAM (FOR CAST IN PLACE CONCRETE BEAMS) -.--7.- -------- D °I f a Wx&" PRECAST l f LINT LINTEL. °l ° �• FILL COLUMNS AND LINTEL SOLID W/ PEA -MIX CONCRETE bNob" FILLED CELLS SEE PLAN AND COLUMN SCHEDULE. TYP. DET. LINTEL W/TIE BEAM 3/4" = 1'-0" FILL COLUMNS AND LINTEL SOLID W/ GROUT T.O.B. w o Q I I w #3 VERT. TIES ONLY AS READ. SEE LINTEL 5GHEDULE L I z_ LU I I HIGH STRENGTH PRECAST LINTEL LU l 1 W/REINFORCING AS REOD. SEE LINTEL 50HEDULE COLUMNS BEYOND SEE FOUNDATION PLAN TYP. DET. LINTEL ON COLUMN 3/4" = 1'-0" OCONCRETE COLUMN MASONRY MA50NRY O O O O O O O O EXTEND JOINT REINF. 6" INTO CONCRETE COLUMN — PROVIDE PREFAB. T" _// O JOINT REINFORCING AT O ALL T INTERSECTIONS PLAN VIEW PLAN VIEW TYPICAL MASONRY JOINT REINF. DETAILS 01 GA. HORIZ. JOINT REINF of 16" o/c, TYP. 61I 01 40 MIN ✓SPPLICE < f ° Ia I° I I ° I I °II II zn1 'f� 1 °I° 1 ° a I a I I I I° 1 1 4,1 41 1­ I I ° 1 I ° I 1 #3 STIRRUPS, 5EE BEAM 50HED. ° 2 #6 BAR TOP 56" MIDDLE BARS (5EE SCHEDULE) MIN SPLICE #6 "Z" BAR Al 36"X36" MIN. SPLICE (AS 5HOWN) 2 #6 BAR BTM STEPPED BEAM DETAIL (B-2) 3601 " 01 40 MIN SPLICE ° I I I° I I I n°1 ° °ICI IaI a°al Ia la Im ° I I I° I I 1 1 N 1 I- I ° a °� l a I I1 #3 5TIRRUP5, 5EE BEAM 50HED. °- T` ° 2 #6 BAR TOP 1 °1 I I MIDDLE BARS (5EE SCHEDULE) a ° — #6 "Z" BAR Al 36"X36" MIN. SPLICE (AS SHOWN) 36" IN SPLICE 2 #1 BAR BTM STEPPED BEAM DETAIL (B-1) 25/32" FLOOR SHEATHING PER DIAPHRAGM 50HEDULE 5/8" WEDGE ANCHORS ® 24" O/C STAGGERED EMBED 4" MIN. DBL. 2x8 P.T. WOOD LEDGER -I 2x8 WOOD JOISTS 424"2411 AT 16" 0/0 U5P JL26 W(b) IOd NAILS TO 5 -OT I O WOOD BEAM AND (4) IOd X VIEW -1/2" NAILS TO JO15T POUR I COURSE ABOVE AND ALL COURSES BELOW LEDGER S2_ CONNECTION DETAIL C J FASTEN TO MASONRY W/ \/ 3/5"x 4" LG. TITENS 8 TO CONCRETE/MA50NRY 8 TO 4„ J0I5T/BEAM W/ 1/4"x2-1/2" 505 WOOD SCREWS MIN. 4" EDGE V15TANCE 51MP50N FASTENERS ALLOWABLE LOADS (LB5) MODEL NO. MASONRY HEADER JOIST UPLIFT (133%) MASONRY 0001%) LGUM25-2 6-TI TEN5 b - 505 2435 8250 LGUM210-2 e-7ITEN5 b - 505 3575 11575 LGUM28-3 6-7I TEN5 (o - 5D5 2435 11240 LC-UM210-3 5-TITEN5 8 - 5D5 3575 g715 LCUM210-4 b-TITENS 5 - 5D5 3575 g8b0 LC-UM410 5-7ITEN5 b - 5D5 3575 11620 SELECT HANGER BASED ON REQUIRED 51ZE # TRU55 MFR. LOADS. NOTIFY ENGR. IF LOADS EXCEED CAPACITIES SHOWN. 2. CONNECTION DETAIL 8„ CONT. 2X6 P.T. RIBBON W/ 1/4"x3-1/4" TAPCON5 0 12" O/C MAX 5TA66ERED NAIL SHEATHING PER DIAPHRAGM SCHEDULE 2x4 BLOCKING 0 24" O.G. W/ (3) 10d TOENAILS EA. END WOOD JOISTS ® 12" O/C SECTION 12. CONNECTION DETAIL 2X& PT NAILER ATOP BEAM W/ �"XW TITEN HD ANCHORS 24" 0/0 COUNTERSUNK 25/32" FLOOR SHEATHING PER DIAPHRAGM SCHEDULE 811 5/8" WEDGE ANCHORS ® 12" O/C 3TAGGE D EMBED 4" MIN. lu DBL. 2x12 P.T. WOOD LEDGER _ 2x12 WOOD JOIST 11_011 I'-0" AT 24" 0/0 U5P THD526 * W/(IS) IOd 5EGT10 NAILS TO LEDGER AND (12) VIEW IOd NAILS TO JOIST ALUM. POUR STOP FILL ALL COURSES DOWN TO * HANGER MAYBE SKEWED OR HAVE SLOPED SEAT. 2. CONNECTION DETAIL -15TAlb STRAP IOd NAILS EACH MEMBER BEAM PER PLAN 4TA20 TRUSS ANCHOR 3) IOd NAILS STRAP EACH 51DE 4 BEAM )NRY COLUMN ANC. GAP (5" MIN.) * MUST PROVIDE 5" MIN. SPACING BETWEEN STRAPS Ib 2• CONNECTION DETAIL X-BRACE BETWEEN EVERY TRU55 W/ 2x4 5P ff (2) I(od END NAILS, EA. END TRU55 MNFR. TO - PROVIDE WEB AT BEARING. STRAP TOP PLATE TO 51UD5 W/ U5P 5PTH 4, 6 OR 5 V" 5TRAP OVER TOP PLATE AND UP EACH SIDE W/(6 ) IOd NAILS TYPICAL "U5P" M5TAI& STRAP FASTEN TO STUDS AND HEADER ?05) IOd NAILS EA. MEMBER IN51DE $ OUT51DE - 4 STRAPS TOTAL EA. END (TYP.) PROVIDE DBL. KING STUD EA. SIDE OF OPENING HEADER OR G.T. SEE FRAMING PLAN 2x BLOCKING a 4'-0" 0/0 MAX. 2x 5TU05 a 16" O/C MAX. Iq/32" ROOF PLYWOOD. NAIL PER DIAPHRAGM 50HEDULE ENG. AND APPROVED WOOD TRUSSES SEE TYP. WALL 5EG7ION FOR ACTUAL HEEL AND OVERHANG CONDITIONS SEE TRU55 CONNECTOR 50HEDULE SELECT CONNECTOR SHOWN ON BRACING PLANS INSTALL PER. MFR. SPECIFICATIONS _ 5EE PLAN •�• T.O. WALL � 1 GONG. TIE -BEAM OR BOND BEAM V�V 5TRAP BOTTOM PLATE TO 5TUD5 I 8 ° GMU WALL ® "U5P" 5 b 8 STRAP D UNDER BOTTOM TOM PLAT7 E AND UP EACH UN 2, CONNECTION DETAIL •11® 510E W04 ) IOd NAILS TYPICAL : °1 51MP5ON H055 HOLD DOWN W/ (2) BLOCK OR MASONRY ' 3/4" THRU-BOLTS TO STUDS 8 (I) 5/8" COLUMN SEE PLAN W.A EMBEDDED ANCHOR TO GONG. Wl 4" MIN. EMBED. 2X P.T. FASTEN TO COLUMN W/ 1/2" • (P WEDGE ANCHORS a 24" 0/0 I/2" A.A. ®18" O/G AND 6" MAX. VERT. 8 6" MAX. FROM ENDS FROM EACH SIDE OF OPENINGS III W/3"x3"xl/4" STEEL WA5HER5 EXTERIOR WALL SHEATHING EMBED IN GONG, OR BOND BEAM 5EE SHEARWALL -SCHEDULE 4' MIN. FOR NAILING REQUIREMENT-5. HOLD 5HEATHI NG AWAY FROM 5 CONNECTION DETAIL MASONRY WALL I/4"MIN. 2. BLOCK OR MASONRY COLUMN 5EE PLAN GONG. TIE -BEAM OR DOUBLE MASONRY 2X P.T. FASTEN TO COLUMN W/ 1/2" 11) BOND BEAM REQUIRED PER SCHEDULE WEDGE ANCHORS a 24" O/G VERT. 8 (2) 2x4 P.T. BLOCKING BETWEEN TRU55E5 �6" MAX. FROM ENDS 4 ANCHORED TO TOP OF LEDGER WITH EXTERIOR WALL SHEATHING Ibd NAILS ® b" O/C SEE SHEARWALL 5GHEDULE U5P "HTA20" EMBED STRAP of 4'-0" o% FOR NAILING REQUIREMENTS. w/ 00) IOd x 1-1/2" LG. FASTEN TO END STUD W/ Ibd NAILS AT NAIL SHEATHING TO TRU55 AND BLOCKING 12" O/G VERT. 8 6" (MAX) FROM ENDS PER DIAPHRAGM 5GHEDULE. HOLD SHEATHING 1/4" BACK OFF MASONRY 2 NOTE: USE 3"x3"xl/4" 5TL. WA5HER5, TYP., EA. ANCHOR CONNECTION DETAIL N FLOOR ® ® EXT. PLYWOOD 5HEATHING ' TRU55 T 5EE 5HEARWALL 5GHEDULE (2)2x12 P.T. CONTINUOUS 2x WOOD STUDS FASTENED ATTACH TO MASONRY W/ TOGETHER ?4/ Ibd NAILS a 4" SECTION 5/8" VIA. WEDGE ANCHORS ELEV O/G STAGGERED ® 12" O/C MAX. TYP. 2x SILL PLATE (BEYOND) -r W/ 4" MIN. EMBED. PLAN 2• CONNECTION DETAIL 3/4" FLOOR SHEATHING WOOD FLOOR TRU55 U5P HTA20 EA. TRU55 W/ (10) IOd NAILS TYPICAL 2x WOOD STUDS FASTENED TOGETHER W/ Ibd NAILS ® 4" ISOMETRIC O/C STAGGERED 2x SILL PLATE (BEYOND) PLAN INTERIOR PLYWOOD SHEATHING SEE 5HEARWALL SCHEDULE CORNER DETAIL N V 4-I6d NAILS SEE PLAN 0 EACH LAP ' TOP VIEW T.O. WALL SPLICE 2x4 P.T. SILL BLOCKING w/ 0.145" x3" LIS. P.A.F. ® 12" O1C SIDE VIEW BEAM GONG. OR MASONRY 16" O G DOUBLE 2x TOP TOP PLATE LAMP DETAIL PLATE 630# of 1.33 2. CONNECTION DETAIL 3 FRAMING DETAILS 2 " 25/52" FLOOR SHEATHING 811 PER DIAPHRAGM 50HEDULE 5/8" WEDGE ANCHORS ® 12" O/C 5TAGGE D EMBED 4" MIN. DBL. 2x12 P.T. WOOD LEDGER _ 2x12 WOOD J015T 11_011 11 011 AT 24" 0/0 U5P THD526 * W/(lb) IOd SEGTIO NAILS TO LEDGER AND (12) VIEW 10d NAILS TO J015T ALUM. POUR STOP FILL ALL LC�ODURRSS{E�S DOWN TO * HANGER MAYBE SKEWED OR HAVE SLOPED SEAT. 2. CONNECTION DETAIL FASTEN TO MASONRY W/ Y4" x 2-5/4" LG. TITENS $ TO CONCRETE W/ Y4" x 2-4" LG. TITENS SI MPSON FA57ENER5 ALLOWABLE LOAD5 (LB5) MODEL NO. MASONRY HEADER J015T UPLIFT (133%) MASONRY 0001%) HU210 e-TITEN5 4-10dx14" 575 2400 HU28-2 14-TITEN5 6-I0d 1085 4550 HU210-2 IS-TITENS 10-10d I610 506`5 HU410 I 0-7I7EN5 I 10-IOCI 1 1&0 50e5 HU210-3 14-7I7EN5 6-10d 1 1155 1 WOO SELECT HANGER BASED ON REQUIRED SIZE 8 TRU55 MFR. LOADS. NOTIFY ENGR. IF LOADS EXCEED CAPACTIES SHOWN. 2. CONNECTION DETAIL SCALE: 3/4 = I -D Ig/32" ROOF PLYWOOD W/ lod NAILS ® 4" O/C INTO 2x4 5P BLOCKING (FLATWISE) x CONT. ENO. AND APPROVED WOOD TRU55E5 5EE 2x8 BRACE ® 6-0" 0/0 TYP. WALL SECTION FOR ACTUAL HEEL Vy/ (10) Ibd NAILS, EA. END AND OVERHANG CONDITION5 U5P HTK20 TWI5T STRAP FASTEN TOP PLATE It FLOOR SHEATHING TRUSS W/ (b) I0dxl-1/2" NAILS EA. MEMBER (5EE PLAN) X-BRACE BETWEEN EVERY THIRD TRUSS W/ 2x4 5P 4 (2) Ibd END NAILS, EA. END 2x4 P.T. BLOCKING (TIGHT TO EA. TRU55 SIDE) WIbd NAILS ® 4" 0/0 °a TO TOP PLATE (2) Ibd NAIL U5P RTI6A OR RTI6-2 CLIP W/ (q) IOd x 1-1/2" NAILS TO TRU55 8 W IOd NAILS TO TOP PLATE i STRAP DBL. TOP PLATE TO STUDS 2x STUDS W/ U5P "5PTH46 OR 5" U-STRAP 2x6 P.T. BLOCKING ®b-O" a Ib" O/C OVER TOP PLATE AND DOWN EA. 0/9 W/ U5P CKI OKT CLIP W/ (5EE PLAN) 51DE W/ (6) IOd NAILS (TYPICAL) 1 1 4 50LID BLOCKING ® 4'-0" O/G VERT. MAX. (4) 1/4" (Pxl 1/2" LONG WOOD 1 0REKLONGBOCKI NO T04) 2' CONNECTION DETAIL MASONRY (I) ROW OF IOd NAILS of b" o% INTO 2xb PT U5P HGAMIOKT CLIP ALONG LEDGER x CONT. w/(2) ROW5 OF 0.145" VIA. TRU55 ® 12" O/G W/ (4) 1/4" x2" P.A.F.s of 16" o% (1-1/2" EMBED), 57AGG. LONG TAPCON5 TO BEAM B (4) U5P "HTA 20" EMBED STRAP at 4'-0" o% N1 (10) /4"XI-1/2" 50REW5 TO IOd x 1-1/2" LG. INTO 2xbxb'-O" LONG 5P FLAT BLOCKING BLOCKING GONG. TIE BEAM OR MASONRY IN57ALL IOd x 1-1/2" of A" n/' Ih" BOND BEAM (5EE PLAN) INTO 2x6 FLAT BLK'G 2• CONNECTION DETAIL .. ° FLOOR TRUSSES GONG. TIE -BEAM OR DOUBLE MA50NRY BOND BEAM REQUIRED PER SCHEDULE SECTION ELEV. 2. CONNECTION DETAIL revisions no. esigned PAR rawn PAR hecked 55 ate 'I/I/2I cale 1/4" = 1'-0" U.N.O. )b no. 21-001"I .WIT Q-EA date QUANTUM ENGINEERING ASSOCIATES INC. • Strn('ttu•a/ Engineering & Cost Segregation 6415 LAKE WORTH ROAD SUITE 105 GREENACRES, FLORIDA 33463 W W W.QEASSOCIATES.COM ��M�sraMe'% �E"sF9: Digitally signed N° 61 0 •'•5L =•` '•= by Shawn . Sy E OF P:•�: Stambaugh P''�o, G` S`,S,yONA�Ea Date: mi: mem na. nee. eie.o-onm°uy signed andsealea by snow. st°n,- 2021 .00.20 bough, PE n the dateshownusinga Digital Signature. d.."ies.(thisd...meota.e 12:00:25-04'00' nsidered signed and sealed and the signature must be verified on any elect..... copies Shawn M. Stambaugh, PE FL. LIC. 61850 - C.A. 26210 UJ <_ M C) 0 JO (/) L.L �W/ L.L UJ Z rr ^^ V J J =D z0 UJ Z co LJJ 5U _ J project J z _ Cn W J � U_ z > W W O u l \ � z v z F- — LL LO Q W v M w rawing 'RAMING )ETAILS sheet S-2.1