Loading...
HomeMy WebLinkAboutQUOTATIONQuotation prepared by: Armando Diaz, President Ardicon Group LLC❑ This is a quotation on the goods named, subject to the conditions noted below: (All openings are in good working conditions, substrates are without damage. NO opening repairs are quoted in this contract. All personal items, such as ...furniture, gym equipment, etc. Needs to be moved away from working area prior to contractor arrival for work. Flooring repairs are NOT included, but can be added to original contract by change order. Drywall repairs and painting are NOT included in original contract, but can be added as change order. All window treatment and draperies need to be removed before windows/doors installation (by owner/rep). Removing end vessel-ef shutters is included in original contract. Any concrete, rebar, masonry reparation is NOT included, but can be added to original contract as change order). Ardicon Group LLC will include % our installation: �- f Varl - P21; A-eL ,r Gr K 1 vt / h .L 1 ��Tt d-M tAft All permits, engineering and processing �es. ,1 All furniture, floors, appliances, etcetera will be cover with plastic or equivalent to protect and pr vent damage. Removing and disposal of old windows/doors. We will use only stainless steel hardware to secure our windows/doors/columns- Color to match windows/doors exterior urethane caulk. Also interior caulk to match color as needed. We will use structural concrete grout in all our SGD and some windows as required by plans and specs. We will repair a 2" of stucco around each opening if needed. We use pressure treated lumber in all our installations. To accept t is qu Cation, sign here and ret Date- .� Owner na e a d signatures JI rion Group Ji , ;�b. � -t-a GCG -A .z7 r 5-�