Loading...
HomeMy WebLinkAboutCreekside Lot 10-Strapping.pdf[BUNIVERSALE ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: Permit No. Project: Address: C/y b(� Check one: Regular Inspection: C`� 1 v ❑ Reinspection Date of Initial Inspection: l �\ O Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: 3 7 — S Inspection Results AP -Approved ❑ AE-Approved with Exc ions ❑ DA-Disallowed DP-Djsiapproved ❑ Not Ready Conditions/Comments: V "` 1. 2. 3. 4. 5. 6. 7. Inspector's Name: Lic.#: /*/- ??,S L OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com