HomeMy WebLinkAboutCreekside Lot 20-Temp Toilet.pdf®UNIVERSAL
ENGINEERING SCIENCES
Inspections Dam
Project: CP
Address: 3
Check one:
"I-�?-2/
INSPECTION RESULTS
Permit No.
2/h S"- 0790
up Regular Inspection: vv��
/❑� Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
H W Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area lnspected/Code: Y
A -2-
I
Inspection Results: P-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
DP -Disapproved ❑ Not Ready
Conditions/Comments: �
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: �/X / pF 6 � Lic.#: wag" s 8V 72f�—
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com