Loading...
HomeMy WebLinkAboutCreekside Lot 20-Temp Toilet.pdf®UNIVERSAL ENGINEERING SCIENCES Inspections Dam Project: CP Address: 3 Check one: "I-�?-2/ INSPECTION RESULTS Permit No. 2/h S"- 0790 up Regular Inspection: vv�� /❑� Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test H W Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area lnspected/Code: Y A -2- I Inspection Results: P-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed DP -Disapproved ❑ Not Ready Conditions/Comments: � 1. 2. 3. 4. 5. 6. 7. Inspector's Name: �/X / pF 6 � Lic.#: wag" s 8V 72f�— OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com