Loading...
HomeMy WebLinkAboutCreekside Lot 124-Sewer Connect.pdf®UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS � iy Inspection Date: Permit No. I G — C� / / y Project: Address. Check one: Regular Inspection: (y h p ryry ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Grouml Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: Inspection Results:: AP -Approved ❑ AE-Approved with Exceptions I-]DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments 1. 2. 3. 4. 5. 6. 7. /� Inspector's Name: Lvv Lic.#: VhWW ,JA) OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com