Loading...
HomeMy WebLinkAboutCreekside Lot 5-Bond Beam.pdf®UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: I ._ I Permit No. Project: C_A_ LeL /tl� Address: 3 3 ✓ / �c ! (),, i 'Wo -v 5 Check one: YRegular Inspection: C� ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground I I Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures I Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: K _ Area Inspected/Code: Inspection Results:)<AP-Approved ❑ DP -Disapproved Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ Not Ready Inspector's Name: �0 A 6� `� Lic.#: oU OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com