HomeMy WebLinkAboutCreekside Lot 5-Bond Beam.pdf®UNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date:
I ._ I Permit No.
Project: C_A_ LeL /tl�
Address: 3 3 ✓ / �c ! (),,
i
'Wo -v 5
Check one:
YRegular Inspection: C�
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
I
I Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
I Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type: K _
Area Inspected/Code:
Inspection Results:)<AP-Approved
❑ DP -Disapproved
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ Not Ready
Inspector's Name: �0 A 6� `� Lic.#: oU
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com