HomeMy WebLinkAboutCreekside Lot 5-Dry In Tin Tab.pdf[BUNIVERSALc
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: l d /`� � Permit No. / t / c/
Project:
Address: J� 3 3 %
ck one:
Regular Inspection: Q rt n
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type: ��//
Area Inspected/Code: f12 iGi 4.X�
Inspection Results: IRAP-Approved ❑ AE- pproved with Exceptions
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
f
Inspector's Name: Lic.#: �
S
OFFICES THROUGHOUT FLORIDA
❑ DA-Disallowed
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com