HomeMy WebLinkAboutCreekside Lot 122-Sewer Connect.pdfg]UNIVERSAL'
ENGINEERING SCIENCES
INSPECTION RESULTS
I V t /a()-
Inspection Date: g`3o- 2) Permit No. OY o3— Ott 3 1
Project: no-od-
-/ &
Address: () / t)G %V KhC1 c-
Check one:
Regular Inspection: a
❑ Reinspection Date of Initial Inspection:
Inspection Type Requested (check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -In
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping & Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type: �^
Area Inspected/Code: / i* S 1��� C-f-n n e d.rs�
Inspection Results: D1 AP -Approved ❑ AE-Approved with Exceptions
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
Inspector's Name:
Lic.#: —J�
❑ DA-Disallowed
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com