HomeMy WebLinkAboutNOA; Englert Metal Man HTMIAMI-DADE COUNTY
PRODUCT CONTROL SECTION
BUILDING AND NEIGHBORHOOD COMPLIANCE DEPARTMENT (BNC) 11805 SW 26 Street, Room 208
BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474
• T (786) 315-2590 F (786) 3 I5-2599
NOTICE OF ACCEPTANCE (NOA) www.miamidade.gov/building/
Englert Inc.
1200 Amboy Ave.
Perth Amboy, NJ 08861
SCOPE:
This NOA is being issued under the applicable rules and regulations governing the use of construction materials.
The documentation submitted has been reviewed by Miami -Dade County Product Control Section and accepted
by the Board of Rules and Appeals (BORA) to be used in Miami Dade County and other areas where allowed by
the Authority Having Jurisdiction (AHJ).
This NOA shall not be valid after the expiration date stated below. The Miami -Dade County Product Control
Section (In Miami Dade County) and/or the AHJ (in areas other than Miami Dade County) reserve the right to
have this product or material tested for quality assurance purposes. If this product or material fails to perform in
the accepted manner, the manufacturer will incur the expense of such testing and the AHJ may immediately
revoke, modify, or suspend the use of such product or material within their jurisdiction. BORA reserves the right.
to revoke this acceptance, if it is determined by Miami -Dade County Product Control Section that this product or
material fails to meet the requirements of the applicable building code.
This product is approved as described herein, and has been designed to comply with the Florida Building Code
including the High Velocity Hurricane Zone of the Florida Building Code.
DESCRIPTION: Englert Metal Man HT
LABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state and
following statement: "Miami -Dade County Product Control Approved", unless otherwise noted herein.
RENEWAL of this NOA shall be considered after a renewal application has been filed and there has been no
change in the applicable building code negatively affecting.the performance of this product.
TERMINATION of this NOA will occur after the expiration date or if there has.been a revision or change in the
materials, use, and/or manufacture of the product or process. Misuse of this NOA as an endorsement of any
product, for sales, advertising or any other purposes shall automatically terminate this NOA. Failure to comply
with any section of this NOA shall be cause for termination and removal of NOA.
ADVERTISEMENT: The NOA number preceded by the words Miami -Dade County, Florida, and followed by
the expiration date may be displayed in advertising literature. If any portion of the NOA is displayed, then it shall
be done in its entirety.
INSPECTION: A copy of this entire NOA shall be provided to the user by the manufacturer or its distributors
and shall be available for inspection at the job site at the request of t
7Pro;e•ss7EK
r 32831
This renews NOA#'09-1116.14 and consists of pages 1 through 4. ,.eThe submitted documentation was reviewed by Alex Tigera. Port L 2-3212(77x �®
NOA No.: 10-1004.02
Expiration Date: 09/29/15
Approval Date: 01/06/11
Page I of 4
ROOFING ASSEMBLY APPROVAL
Category: Roofing
Sub -Category: Underlayment
Material: SBS
TRADE NAMES OF PRODUCTS MANUFACTURED OR LABELED BY APPLICANT:
Test Product
Product Dimensions Specification Description
Englert Metal Man HT 36" x 75' rolls ASTM D1970 SBS self -adhering asphalt sheet material for use
as an underlayment for Ice Dam Protection in
sloped roof assemblies.
.EVIDENCE SUBMITTED:
Test Aaency Test Identifier
Trinity ERD E12330.01.09
Exterior Research & Design, LLC 2968.05.04-2
Underwriters Laboratories, Inc. R21824
MANUFACTURING LOCATION:
1. Drummondville, Quebec (Canada)
Test Name/Report
Date .
ASTM D4798 / ASTM D1970
01/14/00
ASTM D 1970
05/ 17/04
Follow Up Service
08/31/05
NOA No.: 10-1004.02
Expiration Date: 09/29/15
MAMI•DADEcouNTY Approval Date: 01/06/11
Page 2 of 4
APPROVED ASSEMBLIES:
Deck Type 1: Wood, non -insulated, new construction
Deck Description: 19/3Z" or greater plywood or wood plank
System E(1): Base sheet mechanically fastened, membrane adhered.
Base Sheet: One or more plies of ASTM D 226 Type II, ASTM D 2626 or TRI-FLEX 300
with a minimum 4" side lap and a 6" end lap mechanically fastened to deck with
approved nails and tin caps 6" o.c. at the laps and two staggered rows 12" o.c. the
field of the roll.
Membrane: One ply of Englert Metal Man HT with minimum 3-inch side laps and 6-inch end
laps. Starting at the first course, parallel to the eave, align the membrane carefully
by compretel.y unrolling aril settingif exacfly where it will be installed: Once -
aligned, rewind one half of the length. Gently score the release paper on the high
side of this roll, ensuring not to out through the membrane's thickness. Unroll this
first half by evenly peeling back the release paper while simultaneously and slowly
pushing out the membrane. Repeat process for remaining one half of the length.
Once installed, the membrane must be pressure rolled with a metal or rubber roller.
Pressure shall be applied over the entire surface, paying particular attention to all
side and end laps.
Surfacing: Approved for Mechanically Fastened Metal Roofing, Wood Shake & Shingles,
Asphalt Shingles, Slate or Simulated Slate.
----------=—------------------_------------...__-..----------------___-----____-------1�0-r�N�a.: 14=10044ai2—�---
Expiration Date: 09/29/15
MIAMI•DADECOUNTY Approval Date: 01/06/11
Page 3 of 4
LIPN�VIITATIONS:
1. Fire classification is not part of this acceptance.
2. This acceptance is for prepared roofing applications. Minimum deck requirements shall be in
compliance with the applicable building code. Englert Metal Man HT shall be installed in strict
compliance with the applicable building code.
3. Englert Metal Man HT shall be applied to a smooth, clean and dry surface, free from irregularities.
Re -fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate
thoroughly to remove any dust and debris prior to application. When a smooth, clean and/or dry
surface cannot be obtained, the substrate shall be primed with Elastocol Stick prior to application.
4. Englert Metal Man HT shall not be applied over an existing roof membrane as a recover system but
may be applied over a roofing Base/Anchor sheet underlayment.
5. Englert Metal Man HT shall not be left exposed as a temporary roof for longer than 90 days.
6. Englert Metal Man HT may be used with any approved roof covering listing Englert Metal Man HT
within the Product Approval. If Englert Metal Man HT is not listed, a request may be made to the
Authority Having Jurisdiction (AHJ) or the Miami -Dade County Product Control Department for
approval based on the necessary documentation to detail compatibility of the products, wind uplift
resistance and fire resistance results.
7. When applying the membrane in the valley, start at the low point and work to the high point, rolling
the membrane from the center outward in both directions. For ridge applications, center the
membrane and roll from the center outwards in both directions.
8. Membrane shall be applied to protrusions, slope changes, valley, curb, and other roof top penetration
details before any other sections of the roof.
9. All membranes or packaging shall bear the imprint or identifiable marking of the manufacturer's
name or logo and the following statement: "Miami -Dade County Product Control Approved" or the
Miami -Dade County Product Control Seal as shown below. '
END OF THIS ACCEPTANCE
MIAMI-DADE COUNTY
---------
Expiration Date: 09/29/15
Approval Date: 01/06/11
Page 4 of 4