Loading...
HomeMy WebLinkAboutCreekside Lot 75-Pre Power.pdf®UNIVERSAL ENGINEERING SCIENCES 75� INSPECTION RESULTS Inspection Date: I C) — Permit No. Project: Address: 3 Check one: XRegular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING Footing Underground Underground t Rough -In Slab Floor Rough -In Rough -In EMECHANICAL m Piping & Test Masonry Wall Rough -In Stack Piping &Test Piping & TestWall/Ceiling Ceiling Rough -In Water Piping & Test Piping &Test Framing Panel/Feeder Gas Piping & Test Cond. Piping &Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: 6� iffJPo,2ei Inspection Results: Kl AP -Approved ❑ AE-Approved with Exceptions ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. S. 6. 7. Inspector's Name: ,! / ❑ DA-Disallowed OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com