Loading...
HomeMy WebLinkAboutCreekside Lot 123-Sewer Connect F (2).pdf®UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Z,5(-1 a 3 Inspection Date: ) - / - p Permit No. Project: LALCaL Address: / � D o r yv[a cf Check one: * Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping &Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: Inspection Resul ❑ Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed DP -Disapproved ❑ Not Ready / n Conditions/Comments: 1. K 3. 4. S. 6. 7. Inspector's Name: 4( 1/_ / Lic.#: V, OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com